Project Management Process Maturity (PM)2 Model
The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.
Abstract
This paper presents the project management process maturity (PM)2 model that determines and positions an organization’s relative project management level with other organizations. The comprehensive model follows a systematic approach to establish an organization’s current project management level. Each maturity level consists of major project management characteristics, factors, and processes. The model evolves from functionally driven organizational practices to project driven organization that incorporates continuous project learning. The (PM)2 model provides an orderly, disciplined process to achieve higher levels of project management maturity.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Quality Is Free: The Art of Making Quality Certain
Crosby, P. B. (1979) · Andalas University Repository (Andalas University) · Cited by 3,719
Capability Maturity Model for Software, Version 1.1
Paulk, M. C., Curtis, B., Chrissis, M. B., & Weber, C. V. (1993) · doi:10.21236/ada263403 · Cited by 1,664
The Capability Maturity Model for Software
(2011) · Software Process Improvement · doi:10.1109/9781118156667.ch2 · Cited by 791
Assessing Project Management Maturity
Ibbs, C. W., & Kwak, Y. H. (2000) · Project Management Journal · doi:10.1177/875697280003100106 · Cited by 411
Self-citationKey Practices of the Capability Maturity Model Version 1.1
Paulk, M. C., Weber, C. V., Garcia, S., Chrissis, M. B., & Bush, M. W. (1993) · doi:10.1184/r1/6575027.v1 · Cited by 292
Key Practices of the Capability Maturity Model, Version 1.1
Paulk, M. C., Weber, C. V., Garcia, S. M., Chrissis, M. B., & Bush, M. (1993) · doi:10.21236/ada263432 · Cited by 217
Project Management Maturity Model
Crawford, J. K. (2006) · doi:10.1201/9780849379468 · Cited by 192
The Berkeley project management process maturity model: measuring the value of project management
Kwak, Y. H., & William, C. (2002) · Proceedings of the 2000 IEEE Engineering Management Society. EMS - 2000 (Cat. No.00CH37139) · doi:10.1109/ems.2000.872466 · Cited by 51
Self-citation
Cited by
Project studies: What it is, where it is going
Geraldi, J., & Söderlund, J. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.06.004 · Cited by 297
Measuring BIM performance: Five metrics
Succar, B., Sher, W., & Williams, A. (2012) · Architectural Engineering and Design Management · doi:10.1080/17452007.2012.659506 · Cited by 269
How does Industry 4.0 contribute to operations management?
Fettermann, D. C., Cavalcante, C. G. S., Almeida, T. D. D., & Tortorella, G. L. (2018) · Journal of Industrial and Production Engineering · doi:10.1080/21681015.2018.1462863 · Cited by 239
“These components are often composed by practices, processes, tools, and technologies used to increase organizational efficiency [62].”
BackgroundProject Management Maturity Models – A Critical Review
Backlund, F., Chronéer, D., & Sundqvist, E. (2014) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2014.03.094 · Cited by 160
Cradle-to-Cradle in Project Management: A Case Study
Ismayilova, A., & Silvius, G. (2021) · International Journal of Circular Economy and Waste Management · doi:10.4018/ijcewm.20210101.oa1 · Cited by 18
Metadata
- Authors
- Kwak, Y. H., & Ibbs, C. W.
- Venue
- Journal of Management in Engineering
- Published
- 2002-07
- Volume
- 18
- Issue
- 3
- Pages
- 150-155
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)0742-597x(2002)18:3(150
- OpenAlex
- W2168277129
- Cited by
- 243
- References
- 8
- FWCI
- 3.25
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.