Performance Measurement in Construction
Open accessThe DOI matches its Crossref record; 39 of the 39 references it cites were found in a registry or an index.
Abstract
Performance measurement has been subject to a considerable amount of research and attention over the past 15 years. The inadequacy of traditional financially based performance measurement systems and the introduction of nonfinancial measures have been the triggers for much of this research. The purpose of this paper is to review the main performance measurement frameworks and their application by U.K. construction firms and to identify gaps in knowledge and practice that suggest future research. The contemporary performance measurement frameworks are reviewed, including the Balanced Scorecard and the European Foundation for Quality Management Excellence Model. The status of performance in the U.K. construction industry is discussed, in addition to project/operational-level performance measurement and the linkage between performance measurement and strategic management. Gaps in knowledge and practice are overviewed both in general and for the construction industry in specific, thus suggesting future research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
(1992) · PubMed · Cited by 7,979
Using the balanced scorecard as a strategic management system
Kaplan, R. S., & Norton, D. P. (1996) · Harvard business review · Cited by 5,015
The Visible Hand: The Managerial Revolution in American Business
Douglass, E. P., & Chandler, A. D. (1978) · The American Historical Review · doi:10.2307/1862020 · Cited by 4,538
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259
Ziegel, E. R., Kaplan, R., & Norton, D. (1998) · Technometrics · doi:10.2307/1271199 · Cited by 2,187
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180
Transforming the Balanced Scorecard from Performance Measurement to Strategic Management: Part I
Kaplan, R. S., & Norton, D. P. (2001) · Accounting Horizons · doi:10.2308/acch.2001.15.1.87 · Cited by 1,898
The balance on the balanced scorecard a critical analysis of some of its assumptions
Norreklit, H. (2000) · Management Accounting Research · doi:10.1006/mare.1999.0121 · Cited by 1,306
The performance measurement manifesto.
Eccles, R. G. (1991) · PubMed · Cited by 1,289
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154
Designing, Implementing and Updating Performance Measurement Systems
Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010330739 · Cited by 1,143
Performance measurement system design: developing and testing a process‐based approach
Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M., & Kennerley, M. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010343708 · Cited by 922
Performance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
The evolution of management accounting
Kaplan, R. S. (1984) · Readings in Accounting for Management Control · doi:10.1007/978-1-4899-7138-8_27 · Cited by 774
Integrated performance measurement systems: a development guide
Bititci, U. S., Carrie, A. S., & McDevitt, L. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710167230 · Cited by 694
Performance management in construction: a conceptual framework
Kagioglou, M., Cooper, R., & Aouad, G. F. (2001) · Construction Management and Economics · doi:10.1080/01446190010003425 · Cited by 605
Designing performance measures: a structured approach
Neely, A., Richards, H., Mills, J., Platts, K., & Bourne, M. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710177888 · Cited by 599
The New Performance Challenge: Measuring Operations for World-Class Competition
Dixon, J. R., Nanni, A. J., & Vollmann, T. E. (1990) · Cited by 591
Transforming the Balanced Scorecard from Performance Measurement to Strategic Management: Part II
Kaplan, R. S., & Norton, D. P. (2001) · Accounting Horizons · doi:10.2308/acch.2001.15.2.147 · Cited by 480
Dynamics of performance measurement systems
Bititci, U. S., Turner, U., & Begemann, C. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010321676 · Cited by 436
An integrated dynamic performance measurement system for improving manufacturing competitiveness
Ghalayini, A. M., Noble, J. S., & Crowe, T. J. (1997) · International Journal of Production Economics · doi:10.1016/s0925-5273(96)00093-x · Cited by 415
How the Baldrige Award really works.
Garvin, D. A. (1992) · PubMed · Cited by 386
WHY MEASUREMENT INITIATIVES FAIL
Neely, A., & Bourne, M. (2000) · Measuring Business Excellence · doi:10.1108/13683040010362283 · Cited by 338
The “SMART” way to define and sustain success
Cross, K. F., & Lynch, R. L. (1988) · National Productivity Review · doi:10.1002/npr.4040080105 · Cited by 330
Skinner, W. (1986) · Cited by 309
Quantitative models for performance measurement system
Suwignjo, P., Bititci, U. S., & Carrie, A. S. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00061-4 · Cited by 256
Fairclough, J. (2002) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 154
Performance Measurement for World Class Manufacturing: A Model for American Companies
Maskell, B. H. (2013) · Productivity Press eBooks · doi:10.1201/b16424 · Cited by 154
Dynamics of performance measurement systems
Bititci, U., Carrie, A. S., Turner, T. J., & Suwignjo, P. (1999) · Springer eBooks · doi:10.1007/978-0-387-35569-6_8 · Cited by 151
Does TQM Impact on Bottom‐line Results?
Zairi, M., Letza, S. R., & Oakland, J. S. (1994) · The TQM Journal · doi:10.1108/09544789410052750 · Cited by 140
Design of Performance Measures for Time‐based Companies
Azzone, G., Masella, C., & Bertelè, U. (1991) · International Journal of Operations & Production Management · doi:10.1108/01443579110143412 · Cited by 134
The performance prism perspective
Neely, A. D., & Adams, C. (2001) · Cambridge University Engineering Department Publications Database · Cited by 120
Strategic management of electronic commerce: an adaptation of the balanced scorecard
Hasan, H. M., & Tibbits, H. (2000) · Internet Research · doi:10.1108/10662240010349453 · Cited by 118
Sinclair, D., & Zairi, M. (2000) · International Journal of Management Reviews · doi:10.1111/1468-2370.00035 · Cited by 90
Performance measurement, budgeting and strategic implementation in the multinational enterprise
Barsky, N. P., & Bremser, W. G. (1999) · Managerial Finance · doi:10.1108/03074359910765885 · Cited by 46
The role of the business excellence model in operational and strategic decision making
Leonard, D., & McAdam, R. (2002) · Management Decision · doi:10.1108/00251740210413325 · Cited by 41
Changing strategic management practice within the UK construction industry
Price, A. D. F., Ganiev, B. V., & Newson, E. (2003) · Strategic Change · doi:10.1002/jsc.649 · Cited by 40
Self-citationNew process/financial scorecard: A strategic performance measurement system
(1994) · Strategy and Leadership · doi:10.1108/eb054468 · Cited by 40
Cited by
Impact of integration management on construction project management performance
Demirkesen, S., & Ozorhon, B. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.008 · Cited by 259
Acquaye, A., Feng, K., Oppon, E., Salhi, S., Ibn-Mohammed, T., Genovese, A., & Hubacek, K. (2017) · Journal of Environmental Management · doi:10.1016/j.jenvman.2016.10.059 · Cited by 245
“…Network for Business Sustainability (2012), Sustainalytics (2011), Mineral Products Association (2013)) and academic and research works (refer to: Bassioni et al. (2004), Yongvanich and Guthrie (2005), Singh et al. (2007)) are typically lacking theoretical foundation and methodological…”
BackgroundMuduli, K., Govindan, K., Barve, A., Kannan, D., & Geng, Y. (2013) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2013.03.006 · Cited by 241
Critical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Understanding Construction Supply Chain Management
Behera, P., Mohanty, R. P., & Prakash, A. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1045953 · Cited by 194
“Little attention has been paid to supply chain economics and developing positive models, which are inductive and aim to describe what currently exists (Ali et al. 2010; Bassioni, Price, and Hassan 2004).”
Background
Metadata
- Authors
- Bassioni, H. A., Price, A. D. F., & Hassan, T. M.
- Venue
- Journal of Management in Engineering
- Published
- 2004-04
- Volume
- 20
- Issue
- 2
- Pages
- 42-50
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)0742-597x(2004)20:2(42
- OpenAlex
- W2128139964
- Cited by
- 383
- References
- 39
- FWCI
- 14.89
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.