The DOI matches its Crossref record; 30 of the 30 references it cites were found in a registry or an index.
Dynamics of performance measurement systems
Abstract
Begins by creating a vision for dynamic performance measurement systems and goes on to describe the background to the work. Develops a model for integrated and dynamic performance measurement systems. Provides a critical review of existing frameworks, models and techniques against the model. Identifies that current knowledge and techniques are sufficiently mature to create dynamic performance measurement systems. The use of the dynamic performance measurement system is illustrated through a case study. Concludes with a series of lessons highlighting further research and development needs.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Moral Hazard and Observability
Holmstrom, B. (1979) · The Bell Journal of Economics · doi:10.2307/3003320 · Cited by 8,311
The balanced scorecard: Translating strategy into action
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80925-9 · Cited by 8,192
Multitask principal – agent analyses: Incentive contracts, asset ownership, and job design
Holmstrom, B., & Milgrom, P. (1991) · The Journal of Law, Economics, and Organization · doi:10.1093/jleo/7.special_issue.24 · Cited by 6,046
The Provision of Incentives in Firms
Prendergast, C. (1999) · Journal of Economic Literature · doi:10.1257/jel.37.1.7 · Cited by 3,338
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259
Relevance Lost: The Rise and Fall of Management Accounting
Johnson, T. H., & Kaplan, R. S. (1987) · Medical Entomology and Zoology · Cited by 3,177
The effects of bonus schemes on accounting decisions
Healy, P. M. (2011) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 2,579
Ittner, C. D., & Larcker, D. F. (1998) · Journal of Accounting Research · doi:10.2307/2491304 · Cited by 1,607
Incentive contracts and performance measurement
Baker, G. P. (1992) · Journal of Political Economy · doi:10.1086/261831 · Cited by 1,085
The Tenuous Trade‐off between Risk and Incentives
Prendergast, C. (2002) · Journal of Political Economy · doi:10.1086/341874 · Cited by 995
Cited by
Barratt, M., Choi, T. Y., & Li, M. (2011) · Journal of Operations Management · doi:10.1016/j.jom.2010.06.002 · Cited by 1,288
Performance measurement systems in SMEs: A review for a research agenda
Garengo, P., Biazzo, S., & Bititci, U. S. (2005) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2005.00105.x · Cited by 733
Self-citationManufacturing strategy: Literature review and some issues
Dangayach, G. S., & Deshmukh, S. G. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110393414 · Cited by 469
Performance Measurement in Construction
Bassioni, H. A., Price, A. D. F., & Hassan, T. M. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2004)20:2(42 · Cited by 383
Moving from performance measurement to performance management
Amaratunga, D., & Baldry, D. (2002) · Facilities · doi:10.1108/02632770210426701 · Cited by 349
Metadata
- Authors
- Bititci, U. S., Turner, U., & Begemann, C.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2000-06-01
- Volume
- 20
- Issue
- 6
- Pages
- 692-704
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2046815604
- Cited by
- 436
- References
- 30
- FWCI
- 9.25
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Dynamics of performance measurement systems. https://app.cochat.ai/papers/10.1108/01443570010321676
- The paper
- Bititci, U. S., Turner, U., & Begemann, C. (2000). Dynamics of performance measurement systems. International Journal of Operations & Production Management. https://doi.org/10.1108/01443570010321676
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.