Understanding Construction Supply Chain Management
The DOI matches its Crossref record; 50 of the 50 references it cites were found in a registry or an index.
Abstract
The purpose of this study was to understand some of the many perplexing questions eluding managers of overwhelmingly complex construction supply chain management (CSCM) based on review of some important research issues pertaining to construction supply chains. This study has illustrated understanding on CSCM using qualitative approach of triangulation applying foundational research methodology and soft system methodology in a coal-based thermal power plant project to validate its complex CSCM systems. The study highlights that a typical CSCM eco-system for the coal-based thermal power plant construction as unit can be considered to operate as a system with sub-systems as concept phase, procurement phase, production phase, installation phase and winding up phase. This study suffers from methodological limitations associated with qualitative research. Finally, this study provides practical insights for research opportunities in the area of interdisciplinary construction projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1994) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(94)92216-0 · Cited by 45,910
Basics of Qualitative Research: Grounded Theory Procedures and Techniques.
Ellis, C., Strauss, A., & Corbin, J. (1992) · Contemporary Sociology · doi:10.2307/2074814 · Cited by 29,249
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)91697-o · Cited by 18,154
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
Understanding Reliability and Validity in Qualitative Research
Golafshani, N. (2015) · The Qualitative Report · doi:10.46743/2160-3715/2003.1870 · Cited by 5,157
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Two Decades of Developments in Qualitative Inquiry: A Personal, Experiential Perspective
Patton, M. Q. (2002) · Qualitative Social Work · doi:10.1177/1473325002001003636 · Cited by 2,564
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Designing and managing the supply chain : concepts, strategies, and case studies
Simchi‐Levi, D., Kaminsky, P., & Simchi‐Levi, E. (2000) · Cited by 2,204
Cited by
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000675 · Cited by 236
Lean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
Background
Metadata
- Authors
- Behera, P., Mohanty, R. P., & Prakash, A.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2015-06-22
- Volume
- 26
- Issue
- 16
- Pages
- 1332-1350
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W1853704711
- Cited by
- 194
- References
- 50
- FWCI
- 9.56
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Understanding Construction Supply Chain Management. https://app.cochat.ai/papers/10.1080/09537287.2015.1045953
- The paper
- Behera, P., Mohanty, R. P., & Prakash, A. (2015). Understanding Construction Supply Chain Management. Production Planning & Control. https://doi.org/10.1080/09537287.2015.1045953
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.