Research Validation: Challenges and Opportunities in the Construction Domain
The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Abstract
Validation of the research methodology and its results is a fundamental element of the process of scholarly endeavor. Approaches used for construction engineering and management research have included experiments, surveys and observational studies, modeling and simulation, theory building, case studies, and various subtypes thereof. Some studies use more than one approach. A particular contribution of this paper is that it reviews different types of validation using examples of studies, analyzes the specific challenges that were found to be significant, and presents how they were successfully overcome in each case. Another contribution is that it describes new opportunities for research validation that are emerging at the horizon as well as ongoing collaborative efforts to enhance the access of construction researchers to validation tools. This paper increases the awareness of the paramount role that validation techniques play in scholarly work by providing readers with recommendations to properly validate their own research efforts.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Coefficient Alpha and the Internal Structure of Tests
Cronbach, L. J. (1951) · Psychometrika · doi:10.1007/bf02310555 · Cited by 43,931
Determining sample size for research activities
Krejcie, R. V., & Morgan, D. W. (1970) · Educational and Psychological Measurement · doi:10.1177/001316447003000308 · Cited by 18,930
(2010) · Sociology for Pharmacists · doi:10.4324/9780203381175_chapter_9 · Cited by 14,152
Practical Research: Planning and Design
Brent, E., & Leedy, P. D. (1990) · Teaching Sociology · doi:10.2307/1318509 · Cited by 9,309
Social Research Methods: Qualitative and Quantitative Approaches
Djamba, Y. K., & Neuman, W. L. (2002) · Teaching Sociology · doi:10.2307/3211488 · Cited by 8,851
Simulation Modeling and Analysis.
Schervish, M. J., Law, A. M., & Kelton, W. D. (1983) · Journal of the American Statistical Association · doi:10.2307/2288169 · Cited by 8,697
Research Design: Qualitative and Quantitative Approaches
Wilson, R. D., & Creswell, J. W. (1996) · Journal of Marketing Research · doi:10.2307/3152153 · Cited by 7,080
Social Research Methods: Qualitative and Quantitative Approaches
Neuman, W. L. (1991) · Cited by 7,055
Educational Research: Competencies for Analysis and Application
Mills, G. E., & Airasian, P. W. (1995) · Medical Entomology and Zoology · Cited by 5,395
Introduction to Linear Regression Analysis.
Assuncao, R., Sampson, P. D., Montgomery, D. C., & Peck, E. A. (1993) · Journal of the American Statistical Association · doi:10.2307/2290746 · Cited by 5,388
Organizational research: Determining appropriate sample size in survey research
James, E. B. (2001) · Cited by 4,390
(1990) · Computers, Environment and Urban Systems · doi:10.1016/0198-9715(90)90039-v · Cited by 2,468
Educational Research: Competencies for Analysis and Applications
GayMills (2014) · Cited by 1,907
Validation of Regression Models: Methods and Examples
Snee, R. D. (1977) · Technometrics · doi:10.1080/00401706.1977.10489581 · Cited by 1,283
Introduction to Linear Regression Analysis
Gray, J. B. (2002) · Technometrics · doi:10.1198/tech.2002.s714 · Cited by 943
Fault injection techniques and tools
Hsueh, M.-C., Tsai, T. K., & Iyer, R. K. (1997) · Computer · doi:10.1109/2.585157 · Cited by 884
Key influences on construction innovation
Blayse, A. M., & Manley, K. (2004) · Construction Innovation · doi:10.1108/14714170410815060 · Cited by 527
Introduction to Linear Regression Analysis (3rd ed.)
Jammalamadaka, S. R. (2003) · The American Statistician · Cited by 263
Case-Based Reasoning Approach in Bid Decision Making
Chua, D. K. H., Li, D. Z., & Chan, W. T. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:1(35 · Cited by 166
Yu, A. T. W., Shen, Q., Kelly, J. R., & Hunter, K. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:11(1178 · Cited by 163
Loss of Labor Productivity due to Delivery Methods and Weather
Thomas, H. R., Riley, D. R., & Sanvido, V. E. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:1(39 · Cited by 148
On criticality and sensitivity in activity networks
Elmaghraby, S. E. (2000) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00483-x · Cited by 131
Model for Predicting Performance of Architects and Engineers
Ling, F. Y. Y. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:5(446 · Cited by 79
Quantitative Measurement of Successful Performance from the Project Manager’s Perspective
Menches, C. L., & Hanna, A. S. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:12(1284 · Cited by 66
Development and On-Site Evaluation of an Automated Materials Management and Control Model
Navon, R., & Berkovich, O. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:12(1328 · Cited by 61
Leadership and Cultures of Lithuanian and Dutch Construction Firms
Ozorovskaja, R., Voordijk, J. T., & Wilderom, C. P. M. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:11(900 · Cited by 53
Rojas, E. M., & Mukherjee, A. (2006) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2006)20:3(165 · Cited by 49
Self-citationExperimental design for simulation
Kelton, W. D., & Barton, R. R. (2000) · Winter Simulation Conference · doi:10.5555/1030818.1030828 · Cited by 47
Statistical Considerations for Predicting Residual Value of Heavy Equipment
Lucko, G., Anderson‐Cook, C. M., & Vorster, M. C. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(723 · Cited by 34
Self-citation
Cited by
AMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Factors influencing safety performance on construction projects: A review
Mohammadi, A., Tavakolan, M., & Khosravi, Y. (2018) · Safety Science · doi:10.1016/j.ssci.2018.06.017 · Cited by 301
The Delphi Method: Review and Use in Construction Management Research
Sourani, A., & Sohail, M. (2015) · International Journal of Construction Education and Research · doi:10.1080/15578771.2014.917132 · Cited by 203
Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity
Heravi, G., & Eslamdoost, E. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001006 · Cited by 162
Optimizing work–rest schedule for construction rebar workers in hot and humid environment
Yi, W., & Chan, A. P. C. (2013) · Building and Environment · doi:10.1016/j.buildenv.2012.12.012 · Cited by 107
Metadata
- Authors
- Lucko, G., & Rojas, E. M.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2010-01
- Volume
- 136
- Issue
- 1
- Pages
- 127-135
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2126651007
- Cited by
- 244
- References
- 29
- FWCI
- 6.77
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.