Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
Uncertainty affecting operations has long been recognized by researchers as a major obstacle to the delivery of customer value in supply chains. While it has been acknowledged that different types of supply chain have different uncertainty profiles, there is little academic literature addressing the particular uncertainties relating to engineer-to-order (ETO) supply chains in which each product is designed for the needs of a specific customer. The key research question addressed in this paper is how the substantive sources of project uncertainty in construction supply chains can be identified and categorized. A three-phase framework for the identification and categorization of uncertainty is proposed. The empirical investigation reported in this paper demonstrates how the framework may be applied to a group of ETO projects. Using multiple data collection methods, including site visits, interviews, and industry workshops, the uncertainties in five projects are identified and categorized using the framework to demonstrate its application. The framework thereby established is generalized to cover a range of construction projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mixing Qualitative and Quantitative Methods: Triangulation in Action.
Jick, T. D. (1979) · Administrative Science Quarterly · doi:10.2307/2392366 · Cited by 7,103
Interval-level measurement with visual analogue scales in Internet-based research: VAS Generator
Reips, U.-D., & Funke, F. (2008) · Behavior Research Methods · doi:10.3758/brm.40.3.699 · Cited by 453
Cited by
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000675 · Cited by 236
Manzoor, B., Othman, I., Durdyev, S., Ismail, S., & Wahab, M. (2021) · Applied System Innovation · doi:10.3390/asi4030052 · Cited by 118
Marcos, J. T., Scheller, C., Godina, R., Spengler, T. S., & Carvalho, H. (2021) · Cleaner Logistics and Supply Chain · doi:10.1016/j.clscn.2021.100006 · Cited by 70
Impact of aleatoric, stochastic and epistemic uncertainties on project cost contingency reserves
Curto, D., Acebes, F., González-Varona, J. M., & Poza, D. (2022) · International Journal of Production Economics · doi:10.1016/j.ijpe.2022.108626 · Cited by 47
“Another important aspect in production processes is the logistical supply chain, which is why Gosling et al. (2013) identify five sources of uncertainty in supply chains.”
Background
Metadata
- Authors
- Gosling, J., Naim, M., & Towill, D.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2013-01
- Volume
- 139
- Issue
- 1
- Pages
- 102-110
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2058271213
- Cited by
- 85
- References
- 2
- FWCI
- 1.59
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000574
- The paper
- Gosling, J., Naim, M., & Towill, D. (2013). Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000574
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.