Machine Learning Algorithms for Construction Projects Delay Risk Prediction
The DOI matches its Crossref record; 62 of the 62 references it cites were found in a registry or an index.
Abstract
Projects delays are among the most pressing challenges faced by the construction sector attributed to the sector’s complexity and its inherent delay risk sources’ interdependence. Machine learning offers an ideal set of techniques capable of tackling such complex systems; however, adopting such techniques within the construction sector remains at an early stage. The goal of this study was to identify and develop machine learning models in order to facilitate accurate project delay risk analysis and prediction using objective data sources. As such, relevant delay risk sources and factors were first identified, and a multivariate data set of previous projects’ time performance and delay-inducing risk sources was then compiled. Subsequently, the complexity and interdependence of the system was uncovered through an exploratory data analysis. Accordingly, two suitable machine learning models, utilizing decision tree and naïve Bayesian classification algorithms, were identified and trained using the data set for predicting project delay extents. Finally, the predictive performances of both models were evaluated through cross validation tests, and the models were further compared using machine-learning-relevant performance indices. The evaluation results indicated that the naïve Bayesian model provides a better predictive performance for the data set examined. Ultimately, the work presented herein harnesses the power of machine learning to facilitate evidence-based decision making, while inherent risk factors are active, interdependent, and dynamic, thus empowering proactive project risk management strategies.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Gondia et al. [22] proved that ML-based approaches are superior in predicting construction projects' delay risk over statistical learning.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“The present study considered a 10-fold CV because numerous studies have indicated that this is the optimal value for computational time, error estimation, and indices variance [22].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“| Gondia et al. [22] | NB | Accuracy: 78.4% |”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [22]
In the citing paper
“For instance, in a Gondia et al. [22] study, the best ML model was the NB, which had a 51.2% accuracy rate.”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as Gondia et al. [22]
Citations
Cites
The Elements of Statistical Learning
Hastie, T., Tibshirani, R., & Friedman, J. (2009) · Springer Series in Statistics · doi:10.1007/978-0-387-84858-7 · Cited by 25,970
A Study of Cross-Validation and Bootstrap for Accuracy Estimation and Model Selection
Kohavi, R. (1995) · Zenodo · doi:10.5281/zenodo.19712698 · Cited by 10,909
Advances in Neural Information Processing Systems 14: Proceedings of the 2001 Conference
(2002) · The MIT Press eBooks · doi:10.7551/mitpress/1120.001.0001 · Cited by 8,890
Statistical Modeling: The Two Cultures (with comments and a rejoinder by the author)
Breiman, L. (2001) · Statistical Science · doi:10.1214/ss/1009213726 · Cited by 4,340
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
A survey of cross-validation procedures for model selection
Arlot, S., & Célisse, A. (2010) · LillOA (Université de Lille (University Of Lille)) · Cited by 3,662
A survey of cross-validation procedures for model selection
Arlot, S., & Celisse, A. (2010) · Statistics Surveys · doi:10.1214/09-ss054 · Cited by 3,522
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Big Data in the construction industry: A review of present status, opportunities, and future trends
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., Owolabi, H. A., Alaka, H. A., & Pasha, M. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.07.001 · Cited by 929
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831
Causes of construction delay: traditional contracts
Odeh, A. M., & Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 810
The effects of construction delays on project delivery in Nigerian construction industry
Aibinu, A. A., & Jagboro, G. O. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00028-5 · Cited by 597
Construction delay: a quantitative analysis
Al-Momani, A. H. (2000) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00060-x · Cited by 553
Naive Bayes vs decision trees in intrusion detection systems
Amor, N. B., Benferhat, S., & Elouedi, Z. (2004) · Proceedings of the 2004 ACM symposium on Applied computing · doi:10.1145/967900.967989 · Cited by 479
Causes of Delay in Building Construction Projects in Egypt
Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:11(831 · Cited by 463
Causes of delay and cost overruns in Nigerian construction projects
Mansfield, N., Ugwu, O., & Doran, T. (1994) · International Journal of Project Management · doi:10.1016/0263-7863(94)90050-7 · Cited by 457
Open-source machine learning: R meets Weka
Hornik, K., Buchta, C., & Zeileis, A. (2009) · Computational Statistics · doi:10.1007/s00180-008-0119-7 · Cited by 385
Alzahrani, J. I., & Emsley, M. W. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.006 · Cited by 344
Subjective Bayesian Analysis: Principles and Practice
Goldstein, M. (2006) · Bayesian Analysis · doi:10.1214/06-ba116 · Cited by 214
Delays in Building Construction Projects in Ghana
Fugar, F. D., & Agyakwah-Baah, A. B. (1970) · Construction Economics and Building · doi:10.5130/ajceb.v10i1-2.1592 · Cited by 211
Ranking of delay factors in construction projects after Egyptian revolution
Aziz, R. F. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.03.002 · Cited by 209
Hybrid Approach for Addressing Uncertainty in Risk Assessments
Guyonnet, D., Bourgine, B., Dubois, D., Fargier, H., Co⁁me, B., & Chilès, J.-P. (2003) · Journal of Environmental Engineering · doi:10.1061/(asce)0733-9372(2003)129:1(68 · Cited by 208
Fuzzy Monte Carlo Simulation and Risk Assessment in Construction
Sadeghi, N., Fayek, A. R., & Pedrycz, W. (2010) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/j.1467-8667.2009.00632.x · Cited by 204
Causes of delays in the construction industry in Lebanon
Mezher, T. M., & Tawil, W. (1998) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.1998.00049.x · Cited by 201
What Monte Carlo methods cannot do
Ferson, S. (1996) · Human and Ecological Risk Assessment: An International Journal · doi:10.1080/10807039609383659 · Cited by 201
Reasons for delays in public projects in Turkey
Arditi, D., Akan, G. T., & Gurdamar, S. (1985) · Construction Management and Economics · doi:10.1080/01446198500000013 · Cited by 198
Automating hierarchical document classification for construction management information systems
Caldas, C. H., & Soibelman, L. (2003) · Automation in Construction · doi:10.1016/s0926-5805(03)00004-9 · Cited by 194
Wei, Z., Wang, W., Bradfield, J., Li, J., Cardinale, C., Frackelton, E., Kim, C., Mentch, F., Van Steen, K., Visscher, P. M., et al. (2013) · The American Journal of Human Genetics · doi:10.1016/j.ajhg.2013.05.002 · Cited by 184
Ashari, A., Paryudi, I., & Min, A. (2013) · International Journal of Advanced Computer Science and Applications · doi:10.14569/ijacsa.2013.041105 · Cited by 179
Gong, J., Caldas, C. H., & Gordon, C. (2011) · Advanced Engineering Informatics · doi:10.1016/j.aei.2011.06.002 · Cited by 167
Risk matrix for factors affecting time delay in road construction projects: owners' perspective
Mahamid, I. (2011) · Engineering Construction & Architectural Management · doi:10.1108/09699981111180917 · Cited by 163
Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity
Heravi, G., & Eslamdoost, E. (2015) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001006 · Cited by 162
Tixier, A. J. ‐., Hallowell, M. R., Rajagopalan, B., & Bowman, D. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.11.001 · Cited by 140
Cluster Analysis of Smart Metering Data: An Implementation in Practice
Flath, C., Nicolay, D., Conte, T., van Dinther, C., & Filipova-Neumann, L. (2012) · Business & Information Systems Engineering · doi:10.1007/s12599-011-0201-5 · Cited by 137
Naïve Bayes vs. Decision Trees vs. Neural Networks in the classification of training web pagesPreprint
Xhemali, D., Hinde, C. J., & Stone, R. G. (2009) · CogPrints (University of Southampton) · Cited by 125
Naïve Bayes vs. Decision Trees vs. Neural Networks in the classification of training web pagesPreprint
Xhemali, D., Hinde, C. J., & Stone, R. G. (2009) · CogPrints (University of Southampton) · Cited by 119
Rezaie, K., Amalnik, M. S., Gereie, A., Ostadi, B., & Shakhseniaee, M. (2007) · Applied Mathematics and Computation · doi:10.1016/j.amc.2007.02.038 · Cited by 109
Predicting Disputes in Public-Private Partnership Projects: Classification and Ensemble Models
Chou, J.-S., & Lin, C. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000197 · Cited by 94
Predicting Phishing Websites Using Classification Mining Techniques with Experimental Case Studies
Aburrous, M., Hossain, M. A., Dahal, K., & Thabtah, F. (2010) · 2010 Seventh International Conference on Information Technology: New Generations · doi:10.1109/itng.2010.117 · Cited by 86
Son, H., Kim, C., Hwang, N., Kim, C., & Kang, Y. (2014) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.10.001 · Cited by 74
Xia, N., Zhong, R., Wu, C., Wang, X., & Wang, S. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001322 · Cited by 71
Evolutionary support vector machine inference system for construction management
Cheng, M., & Wu, Y.-W. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.12.002 · Cited by 70
Factor selection for delay analysis using Knowledge Discovery in Databases
Kim, H., Soibelman, L., & Grobler, F. (2007) · Automation in Construction · doi:10.1016/j.autcon.2007.10.001 · Cited by 67
Estimating Project S-Curves Using Polynomial Function and Neural Networks
Chao, L., & Chien, C.-F. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(169 · Cited by 52
Bayesian Probabilistic Inference for Nonparametric Damage Detection of Structures
Jiang, X., & Mahadevan, S. (2008) · Journal of Engineering Mechanics · doi:10.1061/(asce)0733-9399(2008)134:10(820 · Cited by 49
Bayesian Decision Tool for the Analysis of Occupational Accidents in the Construction of Embankments
Gerassis, S., Martín, J. E., García, J. T., Saavedra, Á., & Taboada, J. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001225 · Cited by 45
Seong, H., Son, H., & Kim, C. (2018) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-017-1730-3 · Cited by 44
Data mining in mining engineering: results of classification and clustering of shovels failures data
Dindarloo, S. R., & Siami-Irdemoosa, E. (2016) · International Journal of Mining Reclamation and Environment · doi:10.1080/17480930.2015.1123599 · Cited by 40
Causes and effect of delays in Aceh construction industry
Majid, I. A. (2006) · Cited by 38
Chi, S., Suk, S. J., Kang, Y., & Mulva, S. P. (2012) · Advanced Engineering Informatics · doi:10.1016/j.aei.2012.03.005 · Cited by 36
Notice of Retraction: Review of decision trees
Niuniu, X., & Yu-xun, L. (2010) · IEEE International Conference on Computer Science and Information Technology · doi:10.1109/iccsit.2010.5564437 · Cited by 36
Delays and Cost Overruns in Infrastructure Projects -- An Enquiry into Extents, Causes and RemediesPreprint
Singh, R. (2009) · RePEc: Research Papers in Economics · Cited by 35
Classifying Construction Contractors Using Unsupervised-Learning Neural Networks
Elazouni, A. M. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:12(1242 · Cited by 32
Efficacy of Using Support Vector Machine in a Contractor Prequalification Decision Model
Lam, K. C., Lam, M. C., & Wang, D. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000030 · Cited by 30
A bid decision-making model in the initial bidding phase for overseas construction projects
Hwang, J.-S., & Kim, Y.-S. (2015) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-015-0760-y · Cited by 26
Cheung, S. O., Yiu, T. W., & Chan, H. W. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000157 · Cited by 26
Completion delay risk management: A dynamic risk insurance approach
Kokkaew, N., & Wipulanusat, W. (2014) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-014-1128-4 · Cited by 24
Application of Decision Tree Technique to Analyze Construction Project Data
Desai, V. S., & Joshi, S. (2010) · Communications in computer and information science · doi:10.1007/978-3-642-12035-0_30 · Cited by 17
Huang, H.-T., & Tserng, H. P. (2018) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-017-2129-x · Cited by 6
Aggarwal, C. C. (2015) · Data Mining · doi:10.1007/978-3-319-14142-8_10
Research works printed but not linked: 3
- Ismail I., 2014, Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects, Int. J. Constr. Technol. Manage., 1, 10
- Ng A. Y., 2002, Advances in neural information processing systems, 841
- R Core Team, 2013, A language and environment for statistical computing
Cited by
Opportunities and Adoption Challenges of AI in the Construction Industry: A PRISMA Review
Regona, M., Yigitcanlar, T., Xia, B., & Li, R. Y. M. (2022) · Journal of Open Innovation: Technology, Market, and Complexity · doi:10.3390/joitmc8010045 · Cited by 543
“This uncertainty is being magnified as large construction companies are still implementing a traditional process that could be automated, and small subcontractors are following a similar business model [42].”
BackgroundPrediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model
Yaseen, Z. M., Ali, Z. H., Salih, S. Q., & Al-Ansari, N. (2020) · Sustainability · doi:10.3390/su12041514 · Cited by 194
“The study revealed the power of AI models in delay risk prediction and improving risk management strategies [11].”
BackgroundMethodInfluentialZhang, P., Wu, H.-N., Chen, R.-P., & Chan, T. H. T. (2020) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2020.103383 · Cited by 233
A critical evaluation of machine learning and deep learning in shield-ground interaction prediction
Zhang, P., Wu, H.-N., Chen, R.-P., Dai, T., Meng, F.-Y., & Wang, H.-B. (2020) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2020.103593 · Cited by 175
Data mining in the construction industry: Present status, opportunities, and future trends
Yan, H., Yang, N., Peng, Y., & Ren, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103331 · Cited by 161
Metadata
- Authors
- Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H.
- Affiliations
- McMaster University (CA)
- German University in Cairo (EG)
- Corresponding author
- Gondia, Ahmed
- Venue
- Journal of Construction Engineering and Management
- Published
- 2020-01
- Volume
- 146
- Issue
- 1
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2982358567
- Semantic Scholar
- f377710bec5c1ae3454e26eb951728250b2d2cb2
- Cited by
- 327
- References
- 61
- Citations by year
- 2026: 52 · 2025: 72 · 2024: 58 · 2023: 50 · 2022: 54 · 2021: 28 · 2020: 13
- FWCI
- 16.94
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- construction delays, decision tree, naive Bayesian classification, project time performance, project risk management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.