Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction
The DOI matches its Crossref record; 42 of the 42 references it cites were found in a registry or an index.
Abstract
Configuring a trustworthy Internet of Things (IoT)–enabled building information modeling (BIM) platform (IBP) is significant for modular construction to ensure transparency, traceability, and immutability throughout its fragmented supply chain management. However, most current IBPs are designed adopting a centralized system architecture, which fails to achieve a decentralized and effective one to ensure a single point of truth in BIM and prevent a single point of failure in IoT networks. To address this challenge, this study introduces permissioned blockchain with IBP and proposes a novel service-oriented system architecture of blockchain-enabled IoT-BIM platform (BIBP) for the data-information-knowledge (DIK)–driven supply chain management in modular construction. First, infrastructure as a service (IaaS) is designed with hardware, core technologies, and protocols to offer accurate data from daily practice to blockchain BIM. Blockchain BIM as a service (BaaS) is then developed within the permissioned blockchain to ease the interoperability of the information, semantics, and meaningful inferences. Furthermore, software as a service (SaaS) is configured with decentralized applications to achieve knowledgeable operations or processes with a crash fault-tolerant consensus mechanism. The demonstrative case study in a modular student residence project evaluates the proposed BIBP system prototype with the performance analysis of storage cost, throughput, latency, privacy, and feedback from stakeholders. The results indicate that BIBP has an effective system architecture with acceptable throughput and latency, can save storage costs to achieve a single point of truth in BIM, and avoid a single point of failure for IoT networks with privacy and security-preserving mechanisms.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Bitcoin: A Peer-to-Peer Electronic Cash System
Wright, C. S. (2008) · SSRN Electronic Journal · doi:10.2139/ssrn.3440802 · Cited by 13,922
Bitcoin: A Peer-to-Peer Electronic Cash System
Squarepants, S. (2008) · SSRN Electronic Journal · doi:10.2139/ssrn.3977007 · Cited by 11,148
DEFINING SUPPLY CHAIN MANAGEMENT
Mentzer, J. T., DeWitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., & Zacharia, Z. G. (2001) · Journal of Business Logistics · doi:10.1002/j.2158-1592.2001.tb00001.x · Cited by 5,121 · cited 1×
“According to Mentzer et al. (2001), a supply chain is a network of actors (e.g., organizations or individuals) engaged in the flows of goods, services, finances, and information from a supplier to a customer.”
An Overview of Blockchain Technology: Architecture, Consensus, and Future Trends
Zheng, Z., Xie, S., Dai, H., Chen, X., & Wang, H. (2017) · 2017 IEEE International Congress on Big Data (BigData Congress) · doi:10.1109/bigdatacongress.2017.85 · Cited by 4,515 · cited 1×
“Four components support a blockchain to function: cryptography, a distributed database, consensus mechanism, and smart contracts (Zheng et al., 2017).”
5G Internet of Things: A survey
Li, S., Xu, L. D., & Zhao, S. (2018) · Journal of Industrial Information Integration · doi:10.1016/j.jii.2018.01.005 · Cited by 1,293 · cited 1×
“…to realize the concept of IoT, such as radio-frequency identification, near-field communication for short-range wireless (Xue et al., 2018), 5G for medium-range wireless (Li et al., 2018b), and low-power wide-area networking (e.g., LoraWan, NB-IoT) for long-range wireless (Mekki et al., 2018).”
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853 · cited 1×
“Tang et al. (2019) also summarized five mainstream approaches for integrating time-series IoT data with contextual BIM data.”
Conceptual approaches for defining data, information, and knowledge
Zins, C. (2007) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.20508 · Cited by 820 · cited 1×
“The DIK paradigm has been a successful framework for combining and elevating the multimodal data into the models of information and knowledge (Zins, 2007; Zhang et al., 2020a).”
Cheng, J. C. P., Chen, W., Chen, K., & Wang, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103087 · Cited by 520 · cited 1×
“These applications have been widely utilized in monitoring construction resource and progress (Li et al., 2018a), occupational health and safety management (Kanan et al., 2018), construction logistics and supply chain management (Zhong et al., 2017), and facility management (Cheng et al., 2020).”
Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103063 · Cited by 481 · cited 1×
“For example, Wang et al. (2020) established a blockchain-based information management system for a precast supply chain to improve traceability and information communication.”
Lee, D., Lee, S. H., Masoud, N., Krishnan, M. S., & Li, V. C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103688 · Cited by 428 · cited 18×
“Moreover, Lu et al. (2021) proved that blockchain could build trust in the distributed IoT network via a sidechain and provide confidence in such massive IoT-oriented data sources for construction SCM. Lee et al. (2021) designed an integrated digital twin and blockchain system for traceable data transmission.”
Influential
Cited by
Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., & Roshdi Laleh, S. (2022) · Buildings · doi:10.3390/buildings12101503 · Cited by 242
BIM and Digital Twin for Developing Convergence Technologies as Future of Digital Construction
Sepasgozar, S., Khan, A., Smith, K., Romero, J., Shen, X., Shirowzhan, S., Li, H., & Tahmasebinia, F. (2023) · Buildings · doi:10.3390/buildings13020441 · Cited by 162
“Li et al. [33] proposed a service-oriented BCT-enabled IoT-BIM platform (BIBP) in modular construction supply chain management.”
BackgroundCivil Infrastructure Digital Twins: Multi-Level Knowledge Map, Research Gaps, and Future Directions
Naderi, H., & Shojaei, A. (2022) · IEEE Access · doi:10.1109/access.2022.3223557 · Cited by 31
“However, with the recent developments in DT applications for supply chain management of modular construction [89], [90] (Cluster 11 with the yellow color), it is not rare to see these two clusters integrated in the near future, as predicted by Boje et al.”
Background
Metadata
- Authors
- Li, X., Lu, W., Xue, F., Wu, L., Zhao, R., Lou, J., & Xu, J.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2022-02
- Volume
- 148
- Issue
- 2
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W3217755724
- Cited by
- 241
- References
- 42
- FWCI
- 17.16
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.