Blockchain-Enabled IoT-BIM Platform for Supply Chain Management in Modular Construction
The DOI matches its Crossref record; 42 of the 42 references it cites were found in a registry or an index.
Abstract
Configuring a trustworthy Internet of Things (IoT)–enabled building information modeling (BIM) platform (IBP) is significant for modular construction to ensure transparency, traceability, and immutability throughout its fragmented supply chain management. However, most current IBPs are designed adopting a centralized system architecture, which fails to achieve a decentralized and effective one to ensure a single point of truth in BIM and prevent a single point of failure in IoT networks. To address this challenge, this study introduces permissioned blockchain with IBP and proposes a novel service-oriented system architecture of blockchain-enabled IoT-BIM platform (BIBP) for the data-information-knowledge (DIK)–driven supply chain management in modular construction. First, infrastructure as a service (IaaS) is designed with hardware, core technologies, and protocols to offer accurate data from daily practice to blockchain BIM. Blockchain BIM as a service (BaaS) is then developed within the permissioned blockchain to ease the interoperability of the information, semantics, and meaningful inferences. Furthermore, software as a service (SaaS) is configured with decentralized applications to achieve knowledgeable operations or processes with a crash fault-tolerant consensus mechanism. The demonstrative case study in a modular student residence project evaluates the proposed BIBP system prototype with the performance analysis of storage cost, throughput, latency, privacy, and feedback from stakeholders. The results indicate that BIBP has an effective system architecture with acceptable throughput and latency, can save storage costs to achieve a single point of truth in BIM, and avoid a single point of failure for IoT networks with privacy and security-preserving mechanisms.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Bitcoin: A Peer-to-Peer Electronic Cash System
Wright, C. S. (2008) · SSRN Electronic Journal · doi:10.2139/ssrn.3440802 · Cited by 13,922
Bitcoin: A Peer-to-Peer Electronic Cash System
Squarepants, S. (2008) · SSRN Electronic Journal · doi:10.2139/ssrn.3977007 · Cited by 11,148
DEFINING SUPPLY CHAIN MANAGEMENT
Mentzer, J. T., DeWitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., & Zacharia, Z. G. (2001) · Journal of Business Logistics · doi:10.1002/j.2158-1592.2001.tb00001.x · Cited by 5,121 · cited 1×
“According to Mentzer et al. (2001), a supply chain is a network of actors (e.g., organizations or individuals) engaged in the flows of goods, services, finances, and information from a supplier to a customer.”
An Overview of Blockchain Technology: Architecture, Consensus, and Future Trends
Zheng, Z., Xie, S., Dai, H., Chen, X., & Wang, H. (2017) · 2017 IEEE International Congress on Big Data (BigData Congress) · doi:10.1109/bigdatacongress.2017.85 · Cited by 4,515 · cited 1×
“Four components support a blockchain to function: cryptography, a distributed database, consensus mechanism, and smart contracts (Zheng et al., 2017).”
5G Internet of Things: A survey
Li, S., Xu, L. D., & Zhao, S. (2018) · Journal of Industrial Information Integration · doi:10.1016/j.jii.2018.01.005 · Cited by 1,293 · cited 1×
“…to realize the concept of IoT, such as radio-frequency identification, near-field communication for short-range wireless (Xue et al., 2018), 5G for medium-range wireless (Li et al., 2018b), and low-power wide-area networking (e.g., LoraWan, NB-IoT) for long-range wireless (Mekki et al., 2018).”
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853 · cited 1×
“Tang et al. (2019) also summarized five mainstream approaches for integrating time-series IoT data with contextual BIM data.”
Conceptual approaches for defining data, information, and knowledge
Zins, C. (2007) · Journal of the American Society for Information Science and Technology · doi:10.1002/asi.20508 · Cited by 820 · cited 1×
“The DIK paradigm has been a successful framework for combining and elevating the multimodal data into the models of information and knowledge (Zins, 2007; Zhang et al., 2020a).”
Cheng, J. C. P., Chen, W., Chen, K., & Wang, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103087 · Cited by 520 · cited 1×
“These applications have been widely utilized in monitoring construction resource and progress (Li et al., 2018a), occupational health and safety management (Kanan et al., 2018), construction logistics and supply chain management (Zhong et al., 2017), and facility management (Cheng et al., 2020).”
Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2019.103063 · Cited by 481 · cited 1×
“For example, Wang et al. (2020) established a blockchain-based information management system for a precast supply chain to improve traceability and information communication.”
Lee, D., Lee, S. H., Masoud, N., Krishnan, M. S., & Li, V. C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103688 · Cited by 428 · cited 18×
“Moreover, Lu et al. (2021) proved that blockchain could build trust in the distributed IoT network via a sidechain and provide confidence in such massive IoT-oriented data sources for construction SCM. Lee et al. (2021) designed an integrated digital twin and blockchain system for traceable data transmission.”
InfluentialBuilding information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420 · cited 1×
“Modular construction is a revolutionary construction method whereby 3D-volumetric fully finished modules are prefabricated in off-site factories and then shipped to the construction site for installation (Yin et al., 2019).”
Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.01.001 · Cited by 420 · cited 4×
“These applications have been widely utilized in monitoring construction resource and progress (Li et al., 2018a), occupational health and safety management (Kanan et al., 2018), construction logistics and supply chain management (Zhong et al., 2017), and facility management (Cheng et al., 2020).”
InfluentialSelf-citationPerformance Analysis of Private Blockchain Platforms in Varying Workloads
Pongnumkul, S., Siripanpornchana, C., & Thajchayapong, S. (2017) · 2017 26th International Conference on Computer Communication and Networks (ICCCN) · doi:10.1109/icccn.2017.8038517 · Cited by 398 · cited 2×
“A permissionless blockchain is entirely decentralized, allowing anybody to access the data contained in blocks, such as Bitcoin and Ethereum (Buterin, 2014).”
Prefabricated construction enabled by the Internet-of-Things
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.01.006 · Cited by 395 · cited 2×
“These applications have been widely utilized in monitoring construction resource and progress (Li et al., 2018a), occupational health and safety management (Kanan et al., 2018), construction logistics and supply chain management (Zhong et al., 2017), and facility management (Cheng et al., 2020).”
Self-citationBlockchain - the Gateway to Trust-Free Cryptographic Transactions.
Beck, R., Czepluch, J. S., Lollike, N., & Malone, S. (2016) · IT University Of Copenhagen (IT University of Copenhagen) · Cited by 363
Overview of Cellular LPWAN Technologies for IoT Deployment: Sigfox, LoRaWAN, and NB-IoT
Mekki, K., Bajic, E., Chaxel, F., & Meyer, F. (2018) · 2018 IEEE International Conference on Pervasive Computing and Communications Workshops (PerCom Workshops) · doi:10.1109/percomw.2018.8480255 · Cited by 351 · cited 1×
“…to realize the concept of IoT, such as radio-frequency identification, near-field communication for short-range wireless (Xue et al., 2018), 5G for medium-range wireless (Li et al., 2018b), and low-power wide-area networking (e.g., LoraWan, NB-IoT) for long-range wireless (Mekki et al., 2018).”
Kanan, R., Elhassan, O., & Bensalem, R. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.033 · Cited by 288 · cited 1×
“These applications have been widely utilized in monitoring construction resource and progress (Li et al., 2018a), occupational health and safety management (Kanan et al., 2018), construction logistics and supply chain management (Zhong et al., 2017), and facility management (Cheng et al., 2020).”
A framework for integrating BIM and IoT through open standards
Dave, B., Buda, A., Nurminen, A., & Främling, K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.07.022 · Cited by 284 · cited 1×
“The Internet of Things (IoT) is a growing concept that can help provide BIM with real-time data to link the physical resources with virtual BIM objects (Dave et al., 2018).”
Shifting trust in construction supply chains through blockchain technology
Qian, X. (., & Papadonikolaki, E. (2020) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-12-2019-0676 · Cited by 263 · cited 1×
“This renders permissioned blockchains more accessible to projects at a time-sensitive level regarding transparency, traceability, immutability, decentralization, privacy, and smartness (Qian and Papadonikolaki, 2020).”
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253 · cited 1×
“…industry is infamous for its lacking trust and prevalent adversarial relationship with one-off organizational settings, resulting in widespread claims, opportunism, risk aversion, less flexibility, mediocre quality, high cost, and poor value for money (MacLeamy, 2004; Bankvall et al., 2010).”
Li, C. Z., Chen, Z., Xue, F., Kong, X. T. R., Xiao, B., Lai, X., & Zhao, Y. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125391 · Cited by 222
Self-citationZhai, Y., Chen, K., Zhou, J. X., Cao, J. L., Lyu, Z., Jin, X., Shen, Q., Lu, W., & Huang, G. Q. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.100997 · Cited by 212 · cited 2×
“For example, product data collected from the factory to the construction site is still mainly dependent on manual operations and paperwork (Zhai et al., 2019).”
Self-citationPermissionless and permissioned blockchain diffusion
Helliar, C. V., Crawford, L., Rocca, L., Teodori, C., & Veneziani, M. (2020) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2020.102136 · Cited by 211 · cited 1×
“(Helliar et al., 2020).”
Integrating Building Information Modeling and Prefabrication Housing Production
Li, X., Shen, G. Q., Wu, P., & Yue, T. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.024 · Cited by 209 · cited 3×
“Building Information Modeling (BIM) has been widely used to improve the fragmentation and discontinuity in the construction SCM (Li et al. 2019a; Hijazi et al. 2021; Deng et al. 2019).”
Self-citationCloud asset-enabled integrated IoT platform for lean prefabricated construction
Xu, G., Li, M., Chen, C.-H., & Wei, Y. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.012 · Cited by 192 · cited 2×
“To achieve these applications, it needs numerous building blocks, such as system architecture, open BIM standards for interoperability, and protocols of information integration and management (Xu et al., 2018).”
Xue, F., & Lu, W. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103270 · Cited by 183 · cited 5×
“One transaction’s average size can be reduced to 1 KB (Xue and Lu, 2020), and all of the detailed information is kept in a local database.”
InfluentialSelf-citationLean Methodologies and Techniques for Modular Construction: Chronological and Critical Review
Innella, F., Arashpour, M., & Bai, Y. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001712 · Cited by 180 · cited 1×
“To improve these issues, modular construction has been adopted worldwide, such as in Singapore (Hwang et al., 2018), UK (Innella et al., 2019), Canada (Liu et al., 2019), United States (Ramaji and Ali, 2016), Australia (Thai et al., 2020), and China (Liu et al., 2017).”
Niu, Y., Lu, W., Chen, K., Huang, G. G., & Anumba, C. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000550 · Cited by 180
Self-citationSupply Chain Management for Prefabricated Building Projects in Hong Kong
Luo, L., Jin, X., Shen, Q., Wang, Y., Liang, X., Li, X., & Li, C. Z. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000739 · Cited by 173 · cited 2×
“Trust is commonly understood as the positive expectations one party has about another party’s intentions, and trust is fundamental for a transparent and secured supply chain (Luo et al., 2020).”
Self-citationExploring smart construction objects as blockchain oracles in construction supply chain management
Lu, W., Li, X., Xue, F., Zhao, R., Wu, L., & Yeh, A. G. O. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103816 · Cited by 166 · cited 3×
“…affecting the trustworthiness of IoT-BIM (Lee et al., 2021); (3) an open IoT-BIM platform can boost construction companies' competitiveness as more and more stakeholders (e.g., customers) under industry 4.0 prefer to be involved in the transparent construction processes (Lu et al., 2021).”
InfluentialSelf-citationbcBIM: A Blockchain‐Based Big Data Model for BIM Modification Audit and Provenance in Mobile Cloud
Zheng, R., Jiang, J., Hao, X., Ren, W., Xiong, F., & Ren, Y. (2019) · Mathematical Problems in Engineering · doi:10.1155/2019/5349538 · Cited by 152 · cited 2×
“For example, Zheng et al. (2019) proposed a blockchain-based BIM data audit mechanism to record the BIM modification history and ensure the integrity and provenance of BIM data.”
Zhang, C., Zhou, G., Li, H., & Cao, Y. (2020) · IEEE Internet of Things Journal · doi:10.1109/jiot.2020.3005729 · Cited by 137 · cited 2×
“Zhang et al. (2020b) further investigated an integrated framework of the quality traceability system for prefabricated components.”
Two-layer Adaptive Blockchain-based Supervision model for off-site modular housing production
Li, X., Wu, L., Zhao, R., Lu, W., & Xue, F. (2021) · Computers in Industry · doi:10.1016/j.compind.2021.103437 · Cited by 134 · cited 1×
“…much more attention from stakeholders for efficient collaboration, visibility, accountability, and traceability, especially as more expensive assets such as prefabricated modules and units are produced and shipped off-site with the travel restrictions during coronavirus pandemic (Li et al., 2021).”
Self-citationLiu, H., Sydora, C., Altaf, M. S., Han, S., & Al‐Hussein, M. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.07.055 · Cited by 120 · cited 1×
“To improve these issues, modular construction has been adopted worldwide, such as in Singapore (Hwang et al., 2018), UK (Innella et al., 2019), Canada (Liu et al., 2019), United States (Ramaji and Ali, 2016), Australia (Thai et al., 2020), and China (Liu et al., 2017).”
Hijazi, A. A., Perera, S., Calheiros, R. N., & Alashwal, A. M. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002142 · Cited by 112 · cited 1×
“Building Information Modeling (BIM) has been widely used to improve the fragmentation and discontinuity in the construction SCM (Li et al. 2019a; Hijazi et al. 2021; Deng et al. 2019).”
Liu, G., Li, K., Zhao, D. F., & Mao, C. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000501 · Cited by 99 · cited 1×
“To improve these issues, modular construction has been adopted worldwide, such as in Singapore (Hwang et al., 2018), UK (Innella et al., 2019), Canada (Liu et al., 2019), United States (Ramaji and Ali, 2016), Australia (Thai et al., 2020), and China (Liu et al., 2017).”
Dabbagh, M., Kakavand, M., Tahir, M., & Amphawan, A. (2020) · IEEE International Conference on Artificial Intelligence in Engineering and Technology (IICAIET) · doi:10.1109/iicaiet49801.2020.9257811 · Cited by 98 · cited 1×
“Moreover, the performance of Hyperledger Fabric in throughput and latency has also been validated in other studies to indicate it outperforms Ethereum (Pongnumkul et al. 2017; Dabbagh et al. 2020).”
Zhang, Z.-Y., Yuan, Z., Ni, G., Lin, H., & Lu, Y.-J. (2020) · Frontiers of Engineering Management · doi:10.1007/s42524-020-0127-z · Cited by 86 · cited 2×
“Zhang et al. (2020b) further investigated an integrated framework of the quality traceability system for prefabricated components.”
Li, X., Chi, H.-L., Lu, W., Xue, F., Zeng, J., & Li, C. Z. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103738 · Cited by 75 · cited 1×
“…much more attention from stakeholders for efficient collaboration, visibility, accountability, and traceability, especially as more expensive assets such as prefabricated modules and units are produced and shipped off-site with the travel restrictions during coronavirus pandemic (Li et al., 2021).”
Self-citationXue, F., Chen, K., Lu, W., Niu, Y., & Huang, G. Q. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.023 · Cited by 55 · cited 1×
“…many enabling technologies to realize the concept of IoT, such as radio-frequency identification, near-field communication for short-range wireless (Xue et al., 2018), 5G for medium-range wireless (Li et al., 2018b), and low-power wide-area networking (e.g., LoraWan, NB-IoT) for long-range…”
Self-citationBuilding high throughput permissioned blockchain fabrics: challenges and opportunities
Gupta, S., Hellings, J., Rahnama, S., & Sadoghi, M. (2020) · Proceedings of the VLDB Endowment · doi:10.14778/3415478.3415565 · Cited by 35 · cited 1×
“(Gupta et al., 2020).”
SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
Li, X., Wu, C., Wu, P., et al. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.117991 · Cited by 33 · cited 3×
“Building Information Modeling (BIM) has been widely used to improve the fragmentation and discontinuity in the construction SCM (Li et al. 2019a; Hijazi et al. 2021; Deng et al. 2019).”
Self-citation
Cited by
Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., & Roshdi Laleh, S. (2022) · Buildings · doi:10.3390/buildings12101503 · Cited by 242
BIM and Digital Twin for Developing Convergence Technologies as Future of Digital Construction
Sepasgozar, S., Khan, A., Smith, K., Romero, J., Shen, X., Shirowzhan, S., Li, H., & Tahmasebinia, F. (2023) · Buildings · doi:10.3390/buildings13020441 · Cited by 162
“Li et al. [33] proposed a service-oriented BCT-enabled IoT-BIM platform (BIBP) in modular construction supply chain management.”
BackgroundCivil Infrastructure Digital Twins: Multi-Level Knowledge Map, Research Gaps, and Future Directions
Naderi, H., & Shojaei, A. (2022) · IEEE Access · doi:10.1109/access.2022.3223557 · Cited by 31
“However, with the recent developments in DT applications for supply chain management of modular construction [89], [90] (Cluster 11 with the yellow color), it is not rare to see these two clusters integrated in the near future, as predicted by Boje et al.”
Background
Metadata
- Authors
- Li, X., Lu, W., Xue, F., Wu, L., Zhao, R., Lou, J., & Xu, J.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2022-02
- Volume
- 148
- Issue
- 2
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W3217755724
- Cited by
- 241
- References
- 42
- FWCI
- 17.16
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.