Critical Review of Labor Productivity Research in Construction Journals
Open accessThe DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.
Abstract
A significant body of literature has been dedicated to research studies on construction labor productivity (CLP) and related issues, and many underlying theories and industrial practices on CLP application have been reported. However, research topics about CLP are highly diversified and there is a lack of systematic analysis in CLP-related issues. Through a systematic review of selected papers from well-known academic journals in construction management, major research areas are identified, such as factors affecting CLP, modeling and evaluation of CLP, methods and technology for CLP improvement, trends and comparisons of CLP, effects of change/variation on CLP, and baseline/benchmarking CLP. Critical reviews on these areas are presented by focusing on industry, project, and activity levels to investigate the state of the art and trends in CLP research. Gaps in research and practices are discussed and future research directions are proposed. The outcome of this paper may provide a platform for both researchers and industrial practitioners to appreciate the latest developments and trends in productivity research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Information Technology and Productivity: A Review of the Literature
Brynjolfsson, E., & Yang, S. (1996) · Advances in Computers · doi:10.1016/s0065-2458(08)60644-0 · Cited by 673
Lee, M., Wu, Y., & Tsai, C. (2009) · International Journal of Science Education · doi:10.1080/09500690802314876 · Cited by 378
Research Trend of Public-Private Partnership in Construction Journals
Ke, Y., Wang, S., Chan, A. P., & Cheung, E. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(1076 · Cited by 309
Self-citationTsai, C., & Lydia Wen, M. (2005) · International Journal of Science Education · doi:10.1080/0950069042000243727 · Cited by 307
Howard, G. S., Cole, D. A., & Maxwell, S. E. (1987) · American Psychologist · doi:10.1037//0003-066x.42.11.975 · Cited by 277
Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity
Dai, J., Goodrum, P. M., & Maloney, W. F. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:3(217 · Cited by 232
Factor Model of Construction Productivity
Thomas, H. R., & Yiakoumis, I. (1987) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1987)113:4(623 · Cited by 204
The ranking of construction management journals
Wing, C. K. (1997) · Construction Management and Economics · doi:10.1080/014461997372953 · Cited by 198
Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities
Eastman, C. M., & Sacks, R. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:7(517 · Cited by 197
Neural Networks as Tools in Construction
Moselhi, O., Hegazy, T., & Fazio, P. (1991) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1991)117:4(606 · Cited by 197
Competitiveness in construction: a critical review of research
Flanagan, R., Lu, W., Shen, L., & Jewell, C. (2007) · Construction Management and Economics · doi:10.1080/01446190701258039 · Cited by 190
Climatic Effects on Construction
Koehn, E., & Brown, G. (1985) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1985)111:2(129 · Cited by 175
Impact of Change Orders on Labor Efficiency for Electrical Construction
Hanna, A. S., Russell, J. S., Nordheim, E. V., & Bruggink, M. J. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:4(224 · Cited by 175
Work Flow Variation and Labor Productivity: Case Study
Liu, M., Ballard, G., & Ibbs, W. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000056 · Cited by 171
Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle
Thomas, H. R., Horman, M. J., Minchin, R. E., & Chen, D. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:3(251 · Cited by 170
Construction Labor Productivity Modeling with Neural Networks
Sönmez, R., & Rowings, J. E. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:6(498 · Cited by 170
Loss of Labor Productivity due to Delivery Methods and Weather
Thomas, H. R., Riley, D. R., & Sanvido, V. E. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:1(39 · Cited by 148
Thermal environment and construction workers’ productivity: some evidence from Thailand
Srinavin, K., & Mohamed, S. (2002) · Building and Environment · doi:10.1016/s0360-1323(02)00067-7 · Cited by 143
Quantifying Levels of Wasted Time in Construction with Meta-Analysis
Horman, M. J., & Kenley, R. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(52 · Cited by 143
Drivers of productivity among construction workers: A study in a developing country
Kazaz, A., & Ulubeyli, S. (2006) · Building and Environment · doi:10.1016/j.buildenv.2006.04.020 · Cited by 140
Productivity model in hot and humid environment based on heat tolerance time analysis
Zhao, J. B., Zhu, N., & Lu, S. (2009) · Building and Environment · doi:10.1016/j.buildenv.2009.01.003 · Cited by 136
Impact of Shift Work on Labor Productivity for Labor Intensive Contractor
Hanna, A. S., Chang, C.-K., Sullivan, K. T., & Lackney, J. A. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:3(197 · Cited by 129
Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems
Fayek, A. R., & Oduba, A. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:8(938 · Cited by 119
Investigating the relationship between planning reliability and project performance
González, V. A., Alarcón, L. F., & Mundaca, F. (2008) · Production Planning & Control · doi:10.1080/09537280802059023 · Cited by 105
Learning to see work flow: an application of lean concepts to precast concrete fabrication
Ballard, G., Harper, N., & Zabelle, T. R. (2003) · Engineering Construction & Architectural Management · doi:10.1108/09699980310466505 · Cited by 101
Estimating Labor Production Rates for Industrial Construction Activities
AbouRizk, S., Knowles, P., & Hermann, U. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:6(502 · Cited by 94
Hewage, K., & Ruwanpura, J. Y. (2006) · Canadian Journal of Civil Engineering · doi:10.1139/l06-050 · Cited by 93
Role of Inventory Buffers in Construction Labor Performance
Horman, M. J., & Thomas, H. R. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:7(834 · Cited by 91
Developing a Benchmarking Model for Construction Projects in Hong Kong
Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Chiang, Y. H., & Yang, H. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000622 · Cited by 91
Self-citationJarkas, A. M. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000236 · Cited by 91
An Introduction to Neural Networks and a Comparison with Artificial Intelligence and Expert Systems
Zahedi, F. M. (1991) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.21.2.25 · Cited by 81
Revisiting the applicability of learning curve theory to formwork labour productivity
Jarkas, A. M., & Horner, M. W. (2011) · Construction Management and Economics · doi:10.1080/01446193.2011.562911 · Cited by 59
Impact of Change Orders on Small Labor-Intensive Projects
Hanna, A. S., & Gündüz, M. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:5(726 · Cited by 56
Framework for Analysis of Performance
Maloney, W. F. (1990) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1990)116:3(399 · Cited by 53
Statistical-Fuzzy Approach to Quantify Cumulative Impact of Change Orders
Hanna, A. S., Lotfallah, W. B., & Lee, M.-J. (2002) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2002)16:4(252 · Cited by 51
Coping with structural change in construction: experiences gained from advanced economies
Ng, S. T., Fan, R. Y. C., Wong, J. M. W., Chan, A. P. C., Chiang, Y. H., Lam, P. T. I., & Kumaraswamy, M. M. (2009) · Construction Management and Economics · doi:10.1080/01446190802699040 · Cited by 41
Self-citationImproved Baseline Productivity Analysis Technique
Lin, C., & Huang, H.-M. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000129 · Cited by 34
Cited by
A critical review of virtual and augmented reality (VR/AR) applications in construction safety
Li, X., Yi, W., Chi, H.-L., Wang, X., & Chan, A. P. C. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.11.003 · Cited by 1,055
Self-citationA scientometric review of global research on sustainability and sustainable development
Olawumi, T. O., & Chan, D. W. M. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.02.162 · Cited by 816
Critical evaluation of off-site construction research: A Scientometric analysis
Hosseini, M. R., Martek, I., Zavadskas, E. K., Aibinu, A. A., Arashpour, M., & Chileshe, N. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.002 · Cited by 647
García de Soto, B., Agustí-Juan, I., Hunhevicz, J., Joss, S., Graser, K., Habert, G., & Adey, B. T. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.04.004 · Cited by 474
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Metadata
- Authors
- Yi, W., & Chan, A. P. C.
- Venue
- Journal of Management in Engineering
- Published
- 2014-03
- Volume
- 30
- Issue
- 2
- Pages
- 214-225
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2151694695
- Cited by
- 366
- References
- 37
- FWCI
- 26.75
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.