Developing a Digital Twin at Building and City Levels: Case Study of West Cambridge Campus
Open accessThe DOI matches its Crossref record; 56 of the 56 references it cites were found in a registry or an index.
Abstract
A digital twin (DT) refers to a digital replica of physical assets, processes, and systems. DTs integrate artificial intelligence, machine learning, and data analytics to create living digital simulation models that are able to learn and update from multiple sources as well as represent and predict the current and future conditions of physical counterparts. However, current activities related to DTs are still at an early stage with respect to buildings and other infrastructure assets from an architectural and engineering/construction point of view. Less attention has been paid to the operation and maintenance (O&M) phase, which is the longest time span in the asset life cycle. A systematic and clear architecture verified with practical use cases for constructing a DT would be the foremost step for effective operation and maintenance of buildings and cities. According to current research about multitier architectures, this paper presents a system architecture for DTs that is specifically designed at both the building and city levels. Based on this architecture, a DT demonstrator of the West Cambridge site of the University of Cambridge in the UK was developed that integrates heterogeneous data sources, supports effective data querying and analysis, supports decision-making processes in O&M management, and further bridges the gap between human relationships with buildings/cities. This paper aims at going through the whole process of developing DTs in building and city levels from the technical perspective and sharing lessons learned and challenges involved in developing DTs in real practices. Through developing this DT demonstrator, the results provide a clear roadmap and present particular DT research efforts for asset management practitioners, policymakers, and researchers to promote the implementation and development of DT at the building and city levels.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Internet of Things: A Survey on Enabling Technologies, Protocols, and Applications
Al-Fuqaha, A., Guizani, M., Mohammadi, M., Aledhari, M., & Ayyash, M. (2015) · IEEE Communications Surveys & Tutorials · doi:10.1109/comst.2015.2444095 · Cited by 8,630
Wireless sensor network survey
Yick, J., Mukherjee, B., & Ghosal, D. (2008) · Computer Networks · doi:10.1016/j.comnet.2008.04.002 · Cited by 6,255
A Cyber-Physical Systems architecture for Industry 4.0-based manufacturing systems
Lee, J., Bagheri, B., & Kao, H.-A. (2015) · Manufacturing Letters · doi:10.1016/j.mfglet.2014.12.001 · Cited by 5,113
Beyond Accuracy: What Data Quality Means to Data Consumers
Wang, R. Y., & Strong, D. M. (1996) · Journal of Management Information Systems · doi:10.1080/07421222.1996.11518099 · Cited by 4,672
Digital Twin: Mitigating Unpredictable, Undesirable Emergent Behavior in Complex Systems
Grieves, M., & Vickers, J. (2017) · Transdisciplinary Perspectives on Complex Systems · doi:10.1007/978-3-319-38756-7_4 · Cited by 3,727
Cyber Physical Systems: Design Challenges
Lee, E. A. (2008) · 2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC) · doi:10.1109/isorc.2008.25 · Cited by 3,525
The Digital Twin Paradigm for Future NASA and U.S. Air Force Vehicles
Glaessgen, E., & Stargel, D. (2012) · 53rd AIAA/ASME/ASCE/AHS/ASC Structures, Structural Dynamics and Materials Conference 20th AIAA/ASME/AHS Adaptive Structures Conference 14th AIAA · doi:10.2514/6.2012-1818 · Cited by 3,395
Cyber-physical systems: the next computing revolution
Rajkumar, R. (., Lee, I., Sha, L., & Stankovic, J. (2010) · Proceedings of the 47th Design Automation Conference · doi:10.1145/1837274.1837461 · Cited by 1,986
Silva, B. N., Khan, M., & Han, K. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.01.053 · Cited by 1,668
An Introduction to Predictive Maintenance
(2002) · Elsevier eBooks · doi:10.1016/b978-0-7506-7531-4.x5000-3 · Cited by 1,151
5G Ultra-Dense Cellular Networks
Ge, X., Tu, S., Mao, G., Wang, C.-X., & Han, T. (2016) · IEEE Wireless Communications · doi:10.1109/mwc.2016.7422408 · Cited by 1,081
A close examination of performance and power characteristics of 4G LTE networks
Huang, J., Qian, F., Gerber, A., Mao, Z. M., Sen, S., & Spatscheck, O. (2012) · Proceedings of the 10th international conference on Mobile systems, applications, and services · doi:10.1145/2307636.2307658 · Cited by 995
Urban planning and building smart cities based on the Internet of Things using Big Data analytics
Rathore, M. M., Ahmad, A., Paul, A., & Rho, S. (2016) · Computer Networks · doi:10.1016/j.comnet.2015.12.023 · Cited by 932
Lewis, F. L. (2004) · Wiley eBooks · doi:10.1002/047168659x.ch2 · Cited by 619
The building information modelling trajectory in facilities management: A review
Parn, E. A., Edwards, D. J., & Sing, M. C. P. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.12.003 · Cited by 534
Building blocks for a digital twin of additive manufacturing
Knapp, G. L., Mukherjee, T., Zuback, J. S., Wei, H. L., Palmer, T. A., De, A., & DebRoy, T. (2017) · Acta Materialia · doi:10.1016/j.actamat.2017.06.039 · Cited by 414
Building operation and energy performance: Monitoring, analysis and optimisation toolkit
Costa, A., Keane, M. M., Torrens, J. I., & Corry, E. (2013) · Applied Energy · doi:10.1016/j.apenergy.2011.10.037 · Cited by 394
A knowledge-based BIM system for building maintenance
Motawa, I., & Almarshad, A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.008 · Cited by 379
A Survey of Extract-Transform-Load Technology
Vassiliadis, P. (2009) · International Journal of Data Warehousing and Mining · doi:10.4018/jdwm.2009070101 · Cited by 323
A study on software architecture for effective BIM/GIS-based facility management data integration
Kang, T. W., & Hong, C. H. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.03.019 · Cited by 317
Wireless Internet access: 3G vs. WiFi?
Lehr, W., & McKnight, L. W. (2003) · Telecommunications Policy · doi:10.1016/s0308-5961(03)00004-1 · Cited by 267
Mohammadi, N., & Taylor, J. E. (2017) · 2017 IEEE Symposium Series on Computational Intelligence (SSCI) · doi:10.1109/ssci.2017.8285439 · Cited by 260
The Convergence of Digital Twin, IoT, and Machine Learning: Transforming Data into Action
Kaur, M. J., Mishra, V. P., & Maheshwari, P. (2020) · Internet of Things · doi:10.1007/978-3-030-18732-3_1 · Cited by 252
BIM-based framework for automatic scheduling of facility maintenance work orders
Chen, W., Chen, K., Cheng, J. C. P., Wang, Q., & Gan, V. J. L. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.007 · Cited by 245
Designing a Smart City Internet of Things Platform with Microservice Architecture
Krylovskiy, A., Jahn, M., & Patti, E. (2015) · 2015 3rd International Conference on Future Internet of Things and Cloud · doi:10.1109/ficloud.2015.55 · Cited by 232
Model interoperability in building information modelling
Steel, J., Drogemuller, R., & Toth, B. (2012) · Software & Systems Modeling · doi:10.1007/s10270-010-0178-4 · Cited by 230
Hu, Z.-Z., Tian, P.-L., Li, S.-W., & Zhang, J.-P. (2018) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2017.08.007 · Cited by 201
Sociotechnical Systems Approach to BIM Implementation in a Multidisciplinary Construction Context
Sackey, E., Tuuli, M. M., & Dainty, A. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000303 · Cited by 196
Lukyanenko, R., Parsons, J., & Wiersma, Y. F. (2014) · Information Systems Research · doi:10.1287/isre.2014.0537 · Cited by 187
Paradigm Trajectories of Building Information Modeling Practice in Project Networks
Taylor, J. E., & Bernstein, P. G. (2009) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2009)25:2(69 · Cited by 181
Benefits of collaborative ICT adoption for building project management
Ahuja, V., Yang, J., & Shankar, R. (2009) · Construction Innovation · doi:10.1108/14714170910973529 · Cited by 171
(2009) · Elsevier eBooks · doi:10.1016/b978-0-12-374225-4.x0001-x · Cited by 149
Framework for Evaluating the BIM Competencies of Facility Owners
Giel, B. K., & Issa, R. R. A. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000378 · Cited by 148
Conceptual Framework and Roadmap Approach for Integrating BIM into Lifecycle Project Management
Ma, X., Xiong, F., Olawumi, T. O., Dong, N., & Chan, A. P. C. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000647 · Cited by 143
A hybrid data mining approach on BIM-based building operation and maintenance
Yang, P., Lin, J., Zhang, J., & Hu, Z. (2017) · Building and Environment · doi:10.1016/j.buildenv.2017.09.030 · Cited by 139
Inyim, P., Rivera, J., & Zhu, Y. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000308 · Cited by 129
Silva, B. N., Khan, M., & Han, K. (2017) · Future Generation Computer Systems · doi:10.1016/j.future.2017.06.024 · Cited by 124
Activity theory-based analysis of BIM implementation in building O&M and first response
Lu, Q., Chen, L., Lee, S., & Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.10.017 · Cited by 123
Self-citationKleissl, J. P., & Agarwal, Y. (2010) · Proceedings - ACM IEEE Design Automation Conference · doi:10.1145/1837274.1837464 · Cited by 122
Taxonomy for BIM and Asset Management Semantic Interoperability
Farghaly, K., Abanda, F. H., Vidalakis, C., & Wood, G. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000610 · Cited by 121
Entity Resolution and Information Quality
Talburt, J. R. (2011) · Elsevier eBooks · doi:10.1016/c2009-0-63396-1 · Cited by 106
Integrating Big Data: A Semantic Extract-Transform-Load Framework
Bansal, S. K., & Kagemann, S. (2015) · Computer · doi:10.1109/mc.2015.76 · Cited by 100
Cao, D., Li, H., Wang, G., Luo, X., Yang, X., & Tan, D. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000503 · Cited by 100
Automated Schedule Updates Using As-Built Data and a 4D Building Information Model
Son, H., Kim, C., & Cho, Y. K. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000528 · Cited by 99
Technology, Design and Process Innovation in the Built Environment
Cole, I. S., & Corrigan, P. A. (2009) · Spon Press eBooks · doi:10.4324/9780203928325 · Cited by 84
How to design the master data architecture: Findings from a case study at Bosch
Otto, B. (2011) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2011.11.018 · Cited by 82
Song, J., Migliaccio, G. C., Wang, G., & Lü, H. (2017) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000549 · Cited by 79
Fattah, S. M. M., Sung, N.-M., Ahn, I.-Y., Ryu, M.-W., & Yun, J. (2017) · Sensors · doi:10.3390/s17102311 · Cited by 69
Image-Driven Fuzzy-Based System to Construct as-Is IFC BIM Objects
Lu, Q., Lee, S., & Chen, L. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.034 · Cited by 64
Self-citationToward a functional reference model for master data quality management
Otto, B., Hüner, K. M., & Österle, H. (2011) · Information Systems and E-Business Management · doi:10.1007/s10257-011-0178-0 · Cited by 62
BIM-Based Decision-Making Framework for Scaffolding Planning
Kim, K., Cho, Y. K., & Kim, K. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000656 · Cited by 41
Structural Analysis based on the Product Model Standard IFC
Romberg, R., Niggl, A., & van Treeck, C. (2004) · Publication Server of Weimar Bauhaus-University (Weimar Bauhaus-University) · doi:10.25643/bauhaus-universitaet.243 · Cited by 38
A classification of data quality assessment and improvement methods
Woodall, P., Oberhofer, M., & Borek, A. (2014) · International Journal of Information Quality · doi:10.1504/ijiq.2014.068656 · Cited by 37
Self-citationConsolidated cluster systems for data centers in the cloud age: a survey and analysis
Lin, J., Zha, L., & Xu, Z. (2012) · Frontiers of Computer Science · doi:10.1007/s11704-012-2086-y · Cited by 24
CITY PROFILE: USING SMART DATA TO CREATE DIGITAL URBAN SPACES
Ma, Y., Li, G., Xie, H., & Zhang, H. (2018) · ISPRS annals of the photogrammetry, remote sensing and spatial information sciences · doi:10.5194/isprs-annals-iv-4-w7-75-2018 · Cited by 20
Optimize pattern of magnetic sheet attached on NFC/HF-RFID antenna
大村, 直., Takase, E., Ogino, S., Okano, Y., & Arai, S. (2013) · International Symposium on Intelligent Signal Processing and Communication Systems (ISPACS) · doi:10.1109/ispacs.2013.6704625 · Cited by 8
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Digital Twins: A Survey on Enabling Technologies, Challenges, Trends and Future Prospects
Mihai, S., Yaqoob, M., Hung, D. V., Davis, W., Towakel, P., Raza, M., Karamanoglu, M., Barn, B., Shetve, D., Prasad, R. V., et al. (2022) · IEEE Communications Surveys & Tutorials · doi:10.1109/comst.2022.3208773 · Cited by 1,049
Digital twin application in the construction industry: A literature review
Opoku, D.-G. J., Perera, S., Osei-Kyei, R., & Rashidi, M. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.102726 · Cited by 753
A systematic review of a digital twin city: A new pattern of urban governance toward smart cities
Deng, T., Zhang, K., & Shen, Z.-J. (. (2021) · Journal of Management Science and Engineering · doi:10.1016/j.jmse.2021.03.003 · Cited by 532
A BIM-data mining integrated digital twin framework for advanced project management
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103564 · Cited by 518
Metadata
- Authors
- Lu, Q., Parlikad, A. K., Woodall, P., Don Ranasinghe, G., Xie, X., Liang, Z., Konstantinou, E., Heaton, J., & Schooling, J.
- Venue
- Journal of Management in Engineering
- Published
- 2020-05
- Volume
- 36
- Issue
- 3
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W3007058815
- Cited by
- 531
- References
- 56
- FWCI
- 34.36
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.