Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Abstract
Over the past decade, research studies on benefits, critical success factors, difficulties, process, conceptual and theoretical models of construction partnering have been ubiquitous in the construction management discipline. In fact, there is adequate evidence that an increasing number of client organizations are adopting a partnering approach to undertake their building and construction projects both locally and worldwide during the last decade. With the perceived benefits that partnering brings about, research into Key Performance Indicators (KPIs) to evaluate the success of partnering projects in construction becomes vital as it can help set a benchmark for measuring the performance level of partnering projects. However, although there are some related studies and papers on this research area, few, if any, comprehensive and systematic studies focus on developing a comprehensive, objective, reliable and practical performance evaluation model for partnering projects. A model has been developed using the Delphi survey technique to objectively measure the performance of partnering projects in Hong Kong based on a consolidated KPIs' conceptual framework previously developed for partnering projects. Four rounds of Delphi questionnaire survey were conducted with 31 construction experts in Hong Kong. The results reveal that the top seven weighted KPIs to evaluate the success of partnering projects in Hong Kong were: (1) time performance; (2) cost performance; (3) top management commitment; (4) trust and respect; (5) quality performance; (6) effective communications; and (7) innovation and improvement. A statistically significant consensus on the top seven weighted KPIs was also obtained. Finally, a composite Partnering Performance Index (PPI) for partnering projects in Hong Kong was derived to provide an all‐round assessment of partnering performance. Different partnering projects can now be assessed on the same basis for benchmarking purposes. Construction senior executives and project managers can thus use the Index to measure, evaluate and improve the performance of their partnering projects to strive for construction excellence. Although the PPI was developed locally in Hong Kong, the research method could be replicated in other parts of the world to produce similar indices for international comparison. Such an extension would aid the understanding of managing partnering projects across different geographic locations.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Applied Linear Statistical Models
Ziegel, E. R., Neter, J., Wasserman, W., & Kutner, M. (1992) · Technometrics · doi:10.2307/1269588 · Cited by 9,907
Applied Linear Statistical Models.
Lorenz, F., Neter, J., Wasserman, W., & Kutner, M. H. (1986) · Journal of the American Statistical Association · doi:10.2307/2289108 · Cited by 5,565
Mohr, J., & Spekman, R. (1994) · Strategic Management Journal · doi:10.1002/smj.4250150205 · Cited by 3,475 · cited 1×
“…have mutual trust towards the other partners and it is essential to ‘open’ the boundaries of the relationship because it could relieve tension and enhance adaptability, information exchange and joint problem solving and promise better outcomes (Mohr and Spekman, 1994; Cheng et al., 2000).”
BackgroundBeckman, R. J. (1987) · Technometrics · doi:10.1080/00401706.1987.10488195 · Cited by 2,835
The Delphi Method: Techniques and Applications
J., J. E., Linstone, H. A., & Turoff, M. (1976) · Technometrics · doi:10.2307/1268751 · Cited by 2,228 · cited 1×
“Delphi is primarily a communication device that is applied when the consensus of experts on an uncertain issue, often intangible, is desired (Linstone and Turoff, 1975).”
BackgroundQuantity and Quality in Social Research.
True, J. A., & Bryman, A. (1990) · Contemporary Sociology · doi:10.2307/2072662 · Cited by 1,966
The Delphi technique as a forecasting tool: issues and analysis
Rowe, G., & Wright, G. (1999) · International Journal of Forecasting · doi:10.1016/s0169-2070(99)00018-7 · Cited by 1,789 · cited 1×
“Generally, the number of rounds ranges from two to seven and the number of participants varies between 3 and 15 (Rowe and Wright, 1999; Adnan and Morledge, 2003).”
BackgroundMorgan, D. (1998) · Sage eBooks · doi:10.4135/9781483328164 · Cited by 1,691 · cited 2×
“As the information solicited requires in‐depth knowledge and sound experience about KPIs for partnering projects, a purposive approach was adopted to select this group of experts (Bryman, 1996 ; Morgan, 1998 ; Edmunds, 1999 ; Chan et al.”
MethodWeisberg, S. (2005) · Wiley Series in Probability and Statistics · doi:10.1002/0471704091 · Cited by 1,446 · cited 1×
“Though it seems more sophisticated to use a non-linear model to fit the data obtained, overfitting is a common problem with non-linear models especially when the sample size is not sufficiently large (Neter et al., 2005; Weisberg, 2005).”
MethodQuantity and Quality in Social Research
Bryman, A. (2003) · Routledge eBooks · doi:10.4324/9780203410028 · Cited by 1,172
Cited by
Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach
Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., & Ke, Y. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.006 · Cited by 428
Self-citationAMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Self-citationPartnering relationships in construction: A literature review
Bygballe, L. E., Jahre, M., & Swärd, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.08.002 · Cited by 278
EXPLORING CRITICAL SUCCESS FACTORS FOR STAKEHOLDER MANAGEMENT IN CONSTRUCTION PROJECTS
Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Chan, A. P. C. (2009) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/1392-3730.2009.15.337-348 · Cited by 264
Self-citationOlawumi, T. O., Chan, D. W. M., Wong, J. K. W., & Chan, A. P. C. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.06.017 · Cited by 233
Self-citationCritical review on PPP Research – A search from the Chinese and International Journals
Zhang, S., Chan, A. P. C., Feng, Y., Duan, H., & Ke, Y. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.008 · Cited by 220
Self-citationPartnering in the construction industry—Problems and opportunities
Gadde, L.-E., & Dubois, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.09.002 · Cited by 208
Developing a Fuzzy Risk Allocation Model for PPP Projects in China
Xu, Y., Chan, A. P. C., & Yeung, J. F. Y. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000189 · Cited by 195
Self-citationOlawumi, T. O., & Chan, D. W. M. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.03.033 · Cited by 189
Self-citationProposal of a Sustainable Circular Index for Manufacturing Companies
Azevedo, S., Godina, R., & Matias, J. (2017) · Resources · doi:10.3390/resources6040063 · Cited by 165
Valipour, A., Yahaya, N., Md Noor, N., Kildienė, S., Sarvari, H., & Mardani, A. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2015.1051104 · Cited by 111
“50, so, the result confirmed that the model is considered to be comprehensive, clear, objective, practical and reliable by the experts in the validation exercise (Yeung et al. 2007).”
BackgroundInfluential
Metadata
- Authors
- Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., & Li, L. K.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2007-12
- Volume
- 25
- Issue
- 12
- Pages
- 1219-1237
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2033710611
- Cited by
- 194
- References
- 25
- FWCI
- 8.11
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.