Demystifying the cost barriers to offsite construction in the UK
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
Offsite construction has long been reported as an effective alternative to conventional construction, with wide-ranging benefits. However, a wider take-up has been inhibited by perceived cost barriers which are insufficiently studied. Such cost barriers are addressed, drawing on an examination of the cost performance of four types of construction method: pre-cast concrete cross-wall panel, in-situ reinforced concrete (RC) frame, steel frame and timber frame. Data were collected for 20 medium to high rise residential buildings of eight projects by a leading UK housebuilder over a five-year period (2004–08). In all cases, detailed cost comparisons were completed for build method selection. Cross-wall was found to be consistently cheaper than RC frame or steel frame by 11% to 32% in the projects. The process of developing and innovating cross-wall technology led to sustained cost savings up to 25% from its first use. Cross-wall construction also improved cost effectiveness of 20-storey high rise buildings over other solutions. Cost engineering means for achieving cost reduction and effectiveness are identified, which included efficiency learning, technological innovation, multinational partnering, and ‘in-house’ build management. The results prove the logic of the experience curve in improving the cost efficiency of offsite construction, and should encourage offsite construction in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Case study research: design and methods
Phelan, S. (2011) · Evaluation & Research in Education · doi:10.1080/09500790.2011.582317 · Cited by 21,763
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)92196-5 · Cited by 11,976
van de Ven, & Haines, A. (1999) · Medical Entomology and Zoology · Cited by 1,421
Reading Ethnographic Research: A Critical Guide
Hammersley, M. (2016) · Routledge eBooks · doi:10.4324/9781315538457 · Cited by 816
Research Methods and Organization Studies
Bryman, A. (2003) · Routledge eBooks · doi:10.4324/9780203359648 · Cited by 671
Research Methods and Organization Studies
Turner, B. A., & Bryman, A. (1991) · The British Journal of Sociology · doi:10.2307/590376 · Cited by 653 · cited 2×
“Case studies more often take a qualitative perspective, concerned with exploring, describing and explaining a phenomenon, while they sometimes make substantial use of quantitative research methods (Bryman, 1989).”
BackgroundTowards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628 · cited 2×
“The benefits of offsite construction have been widely studied and include reductions in time, defects, health and safety risks, environmental impact, and whole-life cost with a consequent increase in predictability, productivity, whole-life performance and profitability (see e.g. Gibb and Isack, 2003; Venables et al.,…”
BackgroundSustainable performance criteria for construction method selection in concrete buildings
Chen, Y., Okudan, G. E., & Riley, D. R. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.10.004 · Cited by 550 · cited 1×
“Previous studies (e.g. Pasquire and Gibb, 2002; Blismas et al., 2006; Chen et al., 2010) have advocated value-based performance measurement, by which to attempt to shape the industry’s technology decision thinking.”
Background
Cited by
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.171 · Cited by 503
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
Self-citationA holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Kamali, M., & Hewage, K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.108 · Cited by 288
Wu, G., Yang, R., Li, L., Bi, X., Liu, B., Li, S., & Zhou, S. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.02.110 · Cited by 194
Zhai, X., Reed, R., & Mills, A. (2014) · Construction Management and Economics · doi:10.1080/01446193.2013.787491 · Cited by 184
“…UK plays a leading role in the global use of offsite production where the market value is estimated at approximately £6.5 billion (Taylor, 2010a), there is a strong argument that the use of offsite production in the construction industry still remains lower than it could be (Pan and Sidwell, 2011).”
BackgroundInfluential
Metadata
- Authors
- Pan, W., & Sidwell, R.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2011-11
- Volume
- 29
- Issue
- 11
- Pages
- 1081-1099
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2063457506
- Cited by
- 196
- References
- 26
- FWCI
- 9.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.