Demystifying the cost barriers to offsite construction in the UK
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
Offsite construction has long been reported as an effective alternative to conventional construction, with wide-ranging benefits. However, a wider take-up has been inhibited by perceived cost barriers which are insufficiently studied. Such cost barriers are addressed, drawing on an examination of the cost performance of four types of construction method: pre-cast concrete cross-wall panel, in-situ reinforced concrete (RC) frame, steel frame and timber frame. Data were collected for 20 medium to high rise residential buildings of eight projects by a leading UK housebuilder over a five-year period (2004–08). In all cases, detailed cost comparisons were completed for build method selection. Cross-wall was found to be consistently cheaper than RC frame or steel frame by 11% to 32% in the projects. The process of developing and innovating cross-wall technology led to sustained cost savings up to 25% from its first use. Cross-wall construction also improved cost effectiveness of 20-storey high rise buildings over other solutions. Cost engineering means for achieving cost reduction and effectiveness are identified, which included efficiency learning, technological innovation, multinational partnering, and ‘in-house’ build management. The results prove the logic of the experience curve in improving the cost efficiency of offsite construction, and should encourage offsite construction in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Case study research: design and methods
Phelan, S. (2011) · Evaluation & Research in Education · doi:10.1080/09500790.2011.582317 · Cited by 21,763
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)92196-5 · Cited by 11,976
van de Ven, & Haines, A. (1999) · Medical Entomology and Zoology · Cited by 1,421
Reading Ethnographic Research: A Critical Guide
Hammersley, M. (2016) · Routledge eBooks · doi:10.4324/9781315538457 · Cited by 816
Research Methods and Organization Studies
Bryman, A. (2003) · Routledge eBooks · doi:10.4324/9780203359648 · Cited by 671
Research Methods and Organization Studies
Turner, B. A., & Bryman, A. (1991) · The British Journal of Sociology · doi:10.2307/590376 · Cited by 653 · cited 2×
“Case studies more often take a qualitative perspective, concerned with exploring, describing and explaining a phenomenon, while they sometimes make substantial use of quantitative research methods (Bryman, 1989).”
BackgroundTowards adoption of prefabrication in construction
Tam, V. W. Y., Tam, C. M., Zeng, S. X., & Ng, W. C. Y. (2007) · Building and Environment · doi:10.1016/j.buildenv.2006.10.003 · Cited by 628 · cited 2×
“The benefits of offsite construction have been widely studied and include reductions in time, defects, health and safety risks, environmental impact, and whole-life cost with a consequent increase in predictability, productivity, whole-life performance and profitability (see e.g. Gibb and Isack, 2003; Venables et al.,…”
BackgroundSustainable performance criteria for construction method selection in concrete buildings
Chen, Y., Okudan, G. E., & Riley, D. R. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.10.004 · Cited by 550 · cited 1×
“Previous studies (e.g. Pasquire and Gibb, 2002; Blismas et al., 2006; Chen et al., 2010) have advocated value-based performance measurement, by which to attempt to shape the industry’s technology decision thinking.”
BackgroundRe-engineering through pre-assembly: client expectations and drivers
Gibb, A., & Isack, F. (2003) · Building Research & Information · doi:10.1080/09613210302000 · Cited by 397
Perspectives of UK housebuilders on the use of offsite modern methods of construction
Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007) · Construction Management and Economics · doi:10.1080/01446190600827058 · Cited by 357 · cited 8×
“This knowledge gap has been verified in a number of industry surveys, e.g. by Pan et al. (2007) and Goodier and Gibb (2007), which both advocate better cost data of different offsite systems in comparison with traditional construction and more transparent competitive costing.”
BackgroundInfluentialSelf-citationThe dynamics of sustainable innovation journeys
Geels, F. W., Hekkert, M. P., & Jacobsson, S. (2008) · Technology Analysis & Strategic Management · doi:10.1080/09537320802292982 · Cited by 322
Standardization and pre-assembly- distinguishing myth from reality using case study research
Gibb, A. (2001) · Construction Management and Economics · doi:10.1080/01446190010020435 · Cited by 296 · cited 2×
“This consequence addresses the concern of Gibb ( 2001 ) that many manufacturers and suppliers seek the maximum price that the market will sustain, the tender prices quoted may not reflect the actual costs, and will enable sensible comparisons with conventional construction.”
BackgroundThe Management of Technological Innovation: Strategy and Practice
Dodgson, M., Gann, D., & Salter, A. J. (2008) · Cited by 270
The Management of Technological Innovation: Strategy and Practice
Dodgson, M., Gann, D., & Salter, A. (2008) · doi:10.1093/oso/9780199208524.001.0001 · Cited by 231
Leading UK housebuilders' utilization of offsite construction methods
Pan, W., Gibb, A., & Dainty, A. (2007) · Building Research & Information · doi:10.1080/09613210701204013 · Cited by 221 · cited 5×
“A consequence of the cost barriers is that builders and developers are reluctant to adopt offsite construction methods (Pan et al., 2008a), albeit their widely reported non-cost, or life cycle cost, benefits and value.”
BackgroundInfluentialSelf-citationRelative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities
Eastman, C. M., & Sacks, R. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:7(517 · Cited by 197 · cited 2×
“The benefits of offsite construction have been widely studied and include reductions in time, defects, health and safety risks, environmental impact, and whole-life cost with a consequent increase in predictability, productivity, whole-life performance and profitability (see e.g. Gibb and Isack, 2003; Venables et al.,…”
BackgroundOffsite production in the UK: the way forward? A UK construction industry perspective
Nadim, W., & Goulding, J. S. (2010) · Construction Innovation · doi:10.1108/14714171011037183 · Cited by 161 · cited 3×
“The cost barrier to offsite construction, although widely reported, is seldom clearly defined but often cited as ‘high initial cost’ (Goodier and Gibb, 2007), ‘increased initial cost’ (Nadim and Goulding, 2010), ‘higher immediate costs’ (Parliamentary Office of Science and Technology, 2003), or ‘higher capital cost’ (…”
BackgroundMajor characteristics of constructed products and resulting limitations of construction technology
Nam, C. H., & Tatum, C. B. (1988) · Construction Management and Economics · doi:10.1080/01446198800000012 · Cited by 160 · cited 2×
“Nam and Tatum ( 1988 ) argued that ‘costliness’ is a major characteristic of constructed products and contributes to a general tendency in construction in using well-proven methods and materials rather than developing construction technology.”
BackgroundJournal of Financial Management of Property and Construction
(2008) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc.2008.37613aaa.002 · Cited by 156
An innovative supply chain strategy for customized housing
Naim, M. M., & Barlow, J. G. (2003) · Construction Management and Economics · doi:10.1080/0144619032000134129 · Cited by 140 · cited 2×
“poor communication, lack of supply chain collaboration or integration (see Hong-Minh et al., 2001; Naim and Barlow, 2003), and demonstrates the significance of the commitment of the developer to driving the collaborative journey of pursuing the cost efficiency and effectiveness of offsite construction.”
BackgroundContextualist Research: Iterating between Methods While Following an Empirically Grounded Approach
Green, S. D., Kao, C., & Larsen, G. D. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000027 · Cited by 75 · cited 2×
“The collaboration also encouraged the co-production of new knowledge between the researcher and practitioners (see Green et al , 2010 ).”
BackgroundTailoring Competitive Advantages Derived from Innovation to the Needs of Construction Firms
Lim, J. N., Schultmann, F., & Ofori, G. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000151 · Cited by 71 · cited 2×
“Lim ( 2010 ) also similarly commented that innovation is often classified as a cost-intensive investment in the construction industry with indefinite returns, and that the peculiarities of the industry deem innovation as a poor competitive instrument for direct profits.”
BackgroundConsiderations for assessing the benefits of standardisation and pre-assembly in construction
Pasquire, C., & Gibb, A. (2002) · Loughborough University Institutional Repository (Loughborough University) · Cited by 64
Identifying supply chain solutions in the UK house building sector
Hong‐Minh, S. M., Barker, R., & Naim, M. M. (2001) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00009-5 · Cited by 41 · cited 2×
“…addresses the problems with the parties in the housebuilding sector, e.g. poor communication, lack of supply chain collaboration or integration (see Hong-Minh et al., 2001; Naim and Barlow, 2003), and demonstrates the significance of the commitment of the developer to driving the collaborative…”
Background
Cited by
Barriers to promoting prefabricated construction in China: A cost–benefit analysis
Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.171 · Cited by 503
Major Barriers to Off-Site Construction: The Developer’s Perspective in China
Mao, C., Shen, Q., Pan, W., & Ye, K. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000246 · Cited by 446
Self-citationA holistic review of off-site construction literature published between 2008 and 2018
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.08.195 · Cited by 363
Kamali, M., & Hewage, K. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.108 · Cited by 288
Metadata
- Authors
- Pan, W., & Sidwell, R.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2011-11
- Volume
- 29
- Issue
- 11
- Pages
- 1081-1099
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2063457506
- Cited by
- 196
- References
- 26
- FWCI
- 9.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.