Dealing with construction cost overruns using data mining

Open access
Ahiaga-Dagbui, Dominic D., Smith, Simon D. · 2014 · Construction Management and Economics
Cited by 90

The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.

Abstract

One of the main aims of any construction client is to procure a project within the limits of a predefined budget. However, most construction projects routinely overrun their cost estimates. Existing theories on construction cost overrun suggest a number of causes ranging from technical difficulties, optimism bias, managerial incompetence and strategic misrepresentation. However, much of the budgetary decision-making process in the early stages of a project is carried out in an environment of high uncertainty with little available information for accurate estimation. Using non-parametric bootstrapping and ensemble modelling in artificial neural networks, final project cost-forecasting models were developed with 1600 completed projects. This helped to extract information embedded in data on completed construction projects, in an attempt to address the problem of the dearth of information in the early stages of a project. It was found that 92% of the 100 validation predictions were within ±10% of the actual final cost of the project while 77% were within ±5% of actual final cost. This indicates the model’s ability to generalize satisfactorily when validated with new data. The models are being deployed within the operations of the industry partner involved in this research to help increase the reliability and accuracy of initial cost estimates.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/01446193.2014.933854

Cites

6 of 6 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 6 references

Cited by

See all 90

Metadata

Authors
Ahiaga-Dagbui, D. D., & Smith, S. D.
Venue
Construction Management and Economics
Published
2014-07-24
Volume
32
Issue
7-8
Pages
682-694
ISSN
  • 0144-6193 (ISSN-L)
  • 1466-433X
OpenAlex
W1992699707
Cited by
90
References
6
FWCI
6.57
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Dealing with construction cost overruns using data mining. https://app.cochat.ai/papers/10.1080/01446193.2014.933854
The paper
Ahiaga-Dagbui, D. D., & Smith, S. D. (2014). Dealing with construction cost overruns using data mining. Construction Management and Economics. https://doi.org/10.1080/01446193.2014.933854

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.