Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan
The DOI matches its Crossref record; 12 of the 12 references it cites were found in a registry or an index.
Abstract
In Japan, similar management practices in product development, design, supply-chain coordination, marketing and sales have been used to produce very different products: industrialized housing and automobiles. Manufacturing principles derived from the car industry have been successfully used to produce attractive, customized and affordable homes. But there are limits to which such techniques can be applied to manage the assembly of wide varieties of component parts needed to produce complex customized products. Managers must trade off the need to achieve economies of scale in the production of standardized factory parts with economies of scope in various stages of assembly in order to provide flexibility to satisfy consumer choices. The housing industries can benefit by learning more about the use of advanced manufacturing techniques developed in car production. At the same time, automobile makers may learn more about the management of customization from the way in which housing firms organize sales, design and final assembly. The paper suggests that wider ranges of choice can be delivered through managing the whole production system, balancing the use of standard components with flexibility in assembly, rather than by solely attempting to optimize control in discrete parts of the system.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Sectoral patterns of technical change: Towards a taxonomy and a theory
Pavitt, K. (1984) · Research Policy · doi:10.1016/0048-7333(84)90018-0 · Cited by 6,102
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Product development performance: strategy, organization, and management in the world auto industry
(1991) · Choice Reviews Online · doi:10.5860/choice.29-1591 · Cited by 2,389
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Pegels, C. C. (1984) · Japan vs. the West · doi:10.1007/978-94-017-5271-8_8 · Cited by 802
Japanese manufacturing techniques
(1983) · Business Horizons · doi:10.1016/0007-6813(83)90111-8 · Cited by 782
Strategic Industrial Sourcing: The Japanese Advantage
Harrigan, K. R., & Nishiguchi, T. (1996) · The Academy of Management Review · doi:10.2307/258637 · Cited by 519
Strategic Industrial Sourcing: The Japanese Advantage
Nishiguchi, T. (1994) · doi:10.1093/oso/9780195071092.001.0001 · Cited by 518
Innovation in Complex Systems Industries: the Case of Flight Simulation
MILLER, R., HOBDAY, M., LEROUX-DEMERS, T., & OLLEROS, X. (1995) · Industrial and Corporate Change · doi:10.1093/icc/4.2.363 · Cited by 295
Cited by
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041
“Gidado (1996) further emphasized this view by stating that there is a continuous increase in the complexity of construction projects.”
BackgroundInfluentialA critical review of the use of 3-D printing in the construction industry
Wu, P., Wang, J., & Wang, X. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.04.005 · Cited by 1,002
Re-engineering through pre-assembly: client expectations and drivers
Gibb, A., & Isack, F. (2003) · Building Research & Information · doi:10.1080/09613210302000 · Cited by 397
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Supply strategy and network effects — purchasing behaviour in the construction industry
Dubois, A., & Gadde, L.-E. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00016-2 · Cited by 313
Innovation in construction: a sociology of technology approach
Harty, C. (2005) · Building Research & Information · doi:10.1080/09613210500288605 · Cited by 297
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000675 · Cited by 236
Supply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223
“Factory (prefabrication) processes and lean production concepts have successfully been adopted in Japan ( Gann, 1996”
BackgroundPartnering in the construction industry—Problems and opportunities
Gadde, L.-E., & Dubois, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.09.002 · Cited by 208
Goulding, J. S., Pour Rahimian, F., Arif, M., & Sharp, M. D. (2015) · Architectural Engineering and Design Management · doi:10.1080/17452007.2014.891501 · Cited by 202
“For example, Japan is considered the world’s largest practitioner of offsite construction, with companies such as Sekisui Homes producing 70,000 homes a year (Gann, 1996).”
BackgroundWhyte, J., Bouchlaghem, N., Thorpe, A., & McCaffer, R. (2000) · Automation in Construction · doi:10.1016/s0926-5805(99)00012-6 · Cited by 193
Using Mixed Reality for electrical construction design communication
Chalhoub, J., & Ayer, S. K. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.028 · Cited by 189
Models of manufacturing and the construction process: the genesis of re-engineering construction
Winch, G. (2003) · Building Research & Information · doi:10.1080/09613210301995 · Cited by 175
“However, where development gain can be separated from housing production, as in Japan, impressively high volumes (circa 50 000 per year) can be achieved (Gann, 1996).”
BackgroundDevelopment of Lean Model for House Construction Using Value Stream Mapping
Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:8(782 · Cited by 165
Kedir, F., Hall, D. M., Brantvall, S., Lessing, J., Hollberg, A., & Soman, R. K. (2024) · Construction Innovation · doi:10.1108/ci-08-2022-0199 · Cited by 37
Metadata
- Authors
- Gann, D. M.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 1996-09
- Volume
- 14
- Issue
- 5
- Pages
- 437-450
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2038069919
- Cited by
- 385
- References
- 12
- FWCI
- 11.26
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.