The ranking of construction management journals
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
The quality of construction management journals is assessed using a questionnaire survey approach. Construction management is broadly defined to include studies of the human aspects of the construction process. Twenty-two journals related to construction management are identified. Questionnaires were sent to potential respondents by e-mail. Respondents were asked to assess the quality of the journals that they are familiar with. Although there is some evidence showing that respondents who are editorial board members or authors of a journal tend to give a slightly higher score to that journal, the relative ranking of the journals is not affected substantially by such tendency. Some statistically significant results on the ranking of the journals are obtained irrespective of the relatively small sample size compared with some surveys of other main stream journals.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Individual Comparisons by Ranking Methods
Wilcoxon, F. (1945) · Biometrics Bulletin · doi:10.2307/3001968 · Cited by 15,354
Cited by
Osei-Kyei, R., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.02.008 · Cited by 803
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Overview and analysis of safety management studies in the construction industry
Zhou, Z., Goh, Y. M., & Li, Q. (2015) · Safety Science · doi:10.1016/j.ssci.2014.10.006 · Cited by 601
Trend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
Critical Review of Labor Productivity Research in Construction Journals
Yi, W., & Chan, A. P. C. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000194 · Cited by 366
Critical analysis of green building research trend in construction journals
Darko, A., & Chan, A. P. C. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.07.001 · Cited by 342
Zheng, X., Le, Y., Chan, A. P. C., Hu, Y., & Li, Y. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.005 · Cited by 329
Rating tourism and hospitality journals
McKercher, B., Law, R., & Lam, T. (2006) · Tourism Management · doi:10.1016/j.tourman.2005.06.008 · Cited by 325
Research Trend of Public-Private Partnership in Construction Journals
Ke, Y., Wang, S., Chan, A. P., & Cheung, E. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:10(1076 · Cited by 309
AMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Zeng, N., Liu, Y., Gong, P., Hertogh, M., & König, M. (2021) · Frontiers of Engineering Management · doi:10.1007/s42524-021-0153-5 · Cited by 300
Ranking the International Business Journals
DuBois, F. L., & Reeb, D. (2000) · Journal of International Business Studies · doi:10.1057/palgrave.jibs.8490929 · Cited by 278
Partnering relationships in construction: A literature review
Bygballe, L. E., Jahre, M., & Swärd, A. (2010) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2010.08.002 · Cited by 278
Ghosh, A., Edwards, D. J., & Hosseini, M. R. (2020) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-04-2020-0271 · Cited by 275
Causes of delays on construction projects: a comprehensive list
Durdyev, S., & Hosseini, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2018-0178 · Cited by 245
Xia, N., Zou, P. X. W., Griffin, M. A., Wang, X., & Zhong, R. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.03.006 · Cited by 229
Antwi-Afari, M. F., Li, H., Pärn, E. A., & Edwards, D. J. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.010 · Cited by 210
Xue, X., Shen, Q., & Ren, Z. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000025 · Cited by 191
Naoum, S. G. (2016) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-03-2015-0045 · Cited by 167
Metadata
- Authors
- Wing, C. K.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 1997-07
- Volume
- 15
- Issue
- 4
- Pages
- 387-398
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2076569890
- Cited by
- 198
- References
- 1
- FWCI
- 2.26
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.