Causes of Delay in Large Building Construction Projects
Abstract
The present paper outlines the main causes of delay in large building projects in Saudi Arabia and their relative importance. A survey of a randomly selected sample of 24 contractors, 15 architectural/engineering firms (A/E), and nine owners from the Eastern Province of Saudi Arabia was undertaken. The survey included 56 causes of delay, and the respondents were asked to indicate their degree of importance. The delay factors were grouped into nine major groups. The level of importance of the causes and the groups were measured and ranked by their importance index for contractors, owners and A/Es. It was found that contractors, A/Es, and owners generally agree on the ranking of the individual delay factors. It was also shown that contractors and A/Es substantially agree on the ranking of the groups of delay factors, whereas contractors and owners, and A/Es and owners do not agree. It was also shown that the financing group of delay factors was ranked the highest by all three parties and that environment was ranked the lowest.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Criteria of project success: an exploratory re-examination
Lim, C. S., & Mohamed, M. Z. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00040-4 · Cited by 731
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698
The significant factors causing delay of building construction projects in Malaysia
Alaghbari, W., Razali A. Kadir, M., Salim, A., & Ernawati (2007) · Engineering, Construction and Architectural Management · doi:10.1108/09699980710731308 · Cited by 489
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
Metadata
- Authors
- Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M.
- Venue
- Journal of Management in Engineering
- Published
- 1995-03
- Volume
- 11
- Issue
- 2
- Pages
- 45-50
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)0742-597x(1995)11:2(45
- OpenAlex
- W2127081806
- Cited by
- 544
- References
- 0
- FWCI
- 9.50
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Causes of Delay in Large Building Construction Projects. https://app.cochat.ai/papers/10.1061/(asce)0742-597x(1995)11:2(45
- The paper
- Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of Delay in Large Building Construction Projects. Journal of Management in Engineering. https://doi.org/10.1061/(asce)0742-597x(1995)11%3A2(45
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.