Identifying Software Project Risks: An International Delphi Study
The DOI matches its Crossref record; 33 of the 33 references it cites were found in a registry or an index.
Abstract
Advocates of software risk management claim that by identifying and analyzing threats to success (i.e., risks) action can be taken to reduce the chance of failure of a project. The first step in the risk management process is to identify the risk itself, so that appropriate countermeasures can be taken. One problem in this task, however, is that no validated lists are available to help the project manager understand the nature and types of risks typically faced in a software project. This paper represents a first step toward alleviating this problem by developing an authoritative list of common risk factors. We deploy a rigorous data collection method called a "ranking-type" Delphi survey to produce a rank-order list of risk factors. This data collection method is designed to elicit and organize opinions of a panel of experts through iterative, controlled feedback. Three simultaneous surveys were conducted in three different settings: Hong Kong, Finland, and the United States. This was done to broaden our view of the types of risks, rather than relying on the view of a single culture-an aspect that has been ignored in past risk management research. In forming the three panels, we recruited experienced project managers in each country. The paper presents the obtained risk factor list, compares it with other published risk factor lists for completeness and variation, and analyzes common features and differences in risk factor rankings in the three countries. We conclude by discussing implications of our findings for both research and improving risk management practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“a recognized limitation of any study utilizing a Delphi procedure is the selection of participants identified to lend their experience and expertise to the research (Linstone & Turoff, 2002;Schmidt, Lyytinen, Keil, & Cule, 2001;Welty, 1972).”
From A Delphi Study to Operationalize Evidence-Based Predictors in Secondary Transition (2015) · cites this paper as Schmidt, Lyytinen, Keil, & Cule, 2001
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Nonparametric Statistics for the Behavioral Sciences
Guitton, H., & Siegel, S. (1958) · Revue économique · doi:10.2307/3498751 · Cited by 35,245
Cultures and Organizations: Software of the Mind.
Triandis, H. C., & Hofstede, G. (1993) · Administrative Science Quarterly · doi:10.2307/2393257 · Cited by 17,696
Culture's Consequences: International Differences in Work-Related Values.
Sorge, A., & Hofstede, G. (1983) · Administrative Science Quarterly · doi:10.2307/2393017 · Cited by 15,062
Managerial Perspectives on Risk and Risk Taking
March, J. G., & Shapira, Z. (1987) · Management Science · doi:10.1287/mnsc.33.11.1404 · Cited by 3,183
Humphrey, W. S. (1989) · CERN Document Server (European Organization for Nuclear Research) · Cited by 2,005
Decision support systems : an organizational perspective
Keen, P., & Morton, M. S. S. (1978) · Addison-Wesley Longman Publishing Co., Inc. eBooks · Cited by 1,673
Software risk management: principles and practices
Boehm, B. W. (1991) · IEEE Software · doi:10.1109/52.62930 · Cited by 1,578
Unifying the fragmented models of information systems implementation
Kwon, T.-H., & Zmud, R. W. (1987) · John Wiley & Sons, Inc. eBooks · Cited by 1,463
Managing Delphi Surveys Using Nonparametric Statistical Techniques*
Schmidt, R. C. (1997) · Decision Sciences · doi:10.1111/j.1540-5915.1997.tb01330.x · Cited by 1,141
Self-citationIndividual Differences and MIS Success: A Review of the Empirical Literature
Zmud, R. W. (1979) · Management Science · doi:10.1287/mnsc.25.10.966 · Cited by 836
Cited by
Items 301–400 of 1,001
Shmueli, O., Pliskin, N., & Fink, L. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.003 · Cited by 39
Rukundo, R., Bergeron, S., Bocoum, I., Pelletier, N. L., & Doyon, M. (2021) · Sustainability · doi:10.3390/su13158656 · Cited by 39
Identification and ranking of the risk factors involved in PLM implementation
Singh, S., Misra, S. C., & Kumar, S. (2019) · International Journal of Production Economics · doi:10.1016/j.ijpe.2019.09.017 · Cited by 39
Han, Q., Zhu, Y., Ke, G. Y., & Hipel, K. W. (2019) · Land Use Policy · doi:10.1016/j.landusepol.2019.01.034 · Cited by 38
Oliveira, R. R., Boldorini, P. S. A. T., Martins, H. C., & Dias, A. T. (2016) · Revista de Gestão e Projetos · doi:10.5585/gep.v7i1.377 · Cited by 38
RISK IN INFORMATION TECHNOLOGY PROJECT PORTFOLIO MANAGEMENT
Drake, J. R., & Byrd, T. A. (2006) · The Journal of Information Technology Theory and Application · Cited by 38
A Theoretical Review on IT Project Success/Failure Factors and Evaluating the Associated Risks
Taherdoost, H., & Keshavarzsaleh, A. (2015) · doi:10.13140/rg.2.1.3214.9206 · Cited by 38
Asif, M., & Ahmed, J. (2020) · IEEE Access · doi:10.1109/access.2020.2999036 · Cited by 37
Procaccino, J. D., Verner, J. M., Darter, M. E., & Amadio, W. J. (2005) · Journal of Information Technology · doi:10.1057/palgrave.jit.2000044 · Cited by 37
Liu, J. Y.-C., & Yuliani, A. R. (2016) · Project Management Journal · doi:10.1002/pmj.21559 · Cited by 37
Assessment of Barriers to Knowledge and Experience Transfer in Major Maintenance Activities
Iheukwumere-Esotu, L. O., & Yunusa‐Kaltungo, A. (2020) · Energies · doi:10.3390/en13071721 · Cited by 37
WHAT ARE THE MOST IMPORTANT CRITERIA FOR CLOUD SERVICE PROVIDER SELECTION? A DELPHI STUDY
Lang, M., Wiesche, M., & Krcmar, H. (2016) · mediaTUM (Technical University of Munich) · Cited by 37
Loukis, E., & Charalabidis, Y. (2011) · International Journal of Electronic Government Research · doi:10.4018/jegr.2011040104 · Cited by 36
Meïer, O., Missonier, A., & Missonier, S. (2026) · Systèmes d information & management · doi:10.3917/sim.121.0007 · Cited by 36
Integrating Social Media into Business Practice, Applications, Management, and Models
Scupola, A., & Westh Nicolajsen, H. (2014) · Advances in e-business research series · doi:10.4018/978-1-4666-6182-0 · Cited by 36
The effects of perceived value and stakeholder satisfaction on software project impact
Huijgens, H., van Deursen, A., & van Solingen, R. (2017) · Information and Software Technology · doi:10.1016/j.infsof.2017.04.008 · Cited by 36
Software Project Failure Process Definition
Nizam, A. (2022) · IEEE Access · doi:10.1109/access.2022.3162878 · Cited by 35
Vreys, K., Lizin, S., Dael, M. V., Tharakan, J., & Malina, R. M. (2019) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2019.01.027 · Cited by 35
Lakhiwal, A., & Kar, A. K. (2016) · Lecture notes in computer science · doi:10.1007/978-3-319-45234-0_47 · Cited by 35
Lee, J. S., Keil, M., & Shalev, E. (2019) · Information Systems Research · doi:10.1287/isre.2019.0853 · Cited by 35
Self-citationKey Competences of Information Systems Project Managers
Varajão, J. E., Silva, H., & Bach, M. P. (2019) · International Journal of Information Technology Project Management · doi:10.4018/ijitpm.2019070105 · Cited by 35
Bagheri, M., Ibrahim, Z. Z., Akhir, M. F., Talaat, W. I. A. W., Oryani, B., Rezania, S., Wolf, I. D., & Pour, A. B. (2021) · Land · doi:10.3390/land10111271 · Cited by 35
A modified Delphi method to elicit and compare perceptions of industry trends
Egfjord, K. F.-H., & Sund, K. J. (2020) · MethodsX · doi:10.1016/j.mex.2020.101081 · Cited by 35
A framework for Science Shop processes: Results of a modified Delphi study
Urias, E., Vogels, F., Yalçın, S., Malagrida, R., Steinhaus, N., & Zweekhorst, M. B. M. (2020) · Futures · doi:10.1016/j.futures.2020.102613 · Cited by 35
An Assessment of risk response strategies practiced in software projects
Bhoola, V., Hiremath, S. B., & Mallik, D. (2014) · AJIS. Australasian journal of information systems/AJIS. Australian journal of information systems/Australian journal of information systems · doi:10.3127/ajis.v18i3.923 · Cited by 35
Risk Management in Video Game Development Projects
Schmalz, M. L., Finn, A., & Taylor, H. (2014) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2014.534 · Cited by 35
Project Management Courses in IS Graduate Programs: What is Being Taught?
Du, S., Johnson, R., & Keil, M. (2004) · AIS Electronic Library (AISeL) · Cited by 35
Self-citationInternational Projects Proposal Analysis: Risk Assessment Using Radial Maps
Steffey, R. W., & Anantatmula, V. S. (2011) · Project Management Journal · doi:10.1002/pmj.20237 · Cited by 34
A Meta-Model for Information Systems Quality: A Mixed Study of the Financial Sector
Russo, D., Ciancarini, P., Falasconi, T., & Tomasi, M. (2018) · ACM Transactions on Management Information Systems · doi:10.1145/3230713 · Cited by 34
Lech, P. (2016) · SpringerPlus · doi:10.1186/s40064-016-1862-9 · Cited by 34
Security Requirements Engineering: A Framework for Cyber-Physical Systems
Réhman, S. U., Allgaier, C., & Gruhn, V. (2018) · International Conference on Frontiers of Information Technology (FIT) · doi:10.1109/fit.2018.00062 · Cited by 34
Franzò, S., & Urbinati, A. (2023) · Industrial Marketing Management · doi:10.1016/j.indmarman.2023.09.016 · Cited by 33
What could possibly go wrong? A multi-panel Delphi study of organizational social media risk
Gangi, P. M. D., Johnston, A. C., Worrell, J. L. “., & Thompson, S. C. (2016) · Information Systems Frontiers · doi:10.1007/s10796-016-9714-2 · Cited by 33
Examining the coalition dynamics affecting IS project abandonment decision-making
Pan, G., & Pan, S. L. (2005) · Decision Support Systems · doi:10.1016/j.dss.2005.03.001 · Cited by 33
VUCA environment on project success: The effect of project management methods
de Moura, R. L., Carneiro, T. C. J., & Dias, T. D. L. (2023) · Brazilian Business Review · doi:10.15728/bbr.2023.20.3.1.en · Cited by 33
Involving top management in IT projects
Simonsen, J. (2007) · Communications of the ACM · doi:10.1145/1278201.1278206 · Cited by 33
Johnson, A. M. (2009) · Journal of Information Privacy and Security · doi:10.1080/15536548.2009.10855855 · Cited by 32
Developing a wireless reference model for interpreting complexity in wireless projects
Olla, P., & Atkinson, C. (2004) · Industrial Management & Data Systems · doi:10.1108/02635570410525807 · Cited by 32
A Study of the Impact of Global Software Development in Packaged Software Release Planning
García‐Peñalvo, F. J., Soto‐Acosta, P., Colomo‐Palacios, R., & García-Crespo, Á. (2012) · JUCS - Journal of Universal Computer Science · doi:10.3217/jucs-018-19-2646 · Cited by 32
“Let the Marketplace be the Judge”: The Founders Reflect on the Origins and Trajectory of NASSM
Bowers, M. T., Green, B. C., & Seifried, C. S. (2014) · Journal of Sport Management · doi:10.1123/jsm.2012-0335 · Cited by 32
Decisions in software development projects management. An exploratory study
Colomo‐Palacios, R., Lumbreras, C. C., Soto‐Acosta, P., & García-Crespo, Á. (2011) · Behaviour and Information Technology · doi:10.1080/0144929x.2011.630414 · Cited by 32
Calculating completeness of software project scope definition
Hassan, I. U., Ahmad, N., & Zuhaira, B. (2017) · Information and Software Technology · doi:10.1016/j.infsof.2017.10.010 · Cited by 32
Tesch, D., Miller, R., Jiang, J. J., & Klein, G. L. (2005) · Information Systems Journal · doi:10.1111/j.1365-2575.2005.00201.x · Cited by 32
Kendall, R. P., Post, D. E., Carver, J. C., Henderson, D. B., & Fisher, D. A. (2007) · Defense Technical Information Center (DTIC) · doi:10.21236/ada468594 · Cited by 32
Context of Use: The Final Frontier in the Practice of User-Centered Design?
Eshet, E., & Bouwman, H. (2016) · Interacting with Computers · doi:10.1093/iwc/iww030 · Cited by 31
Aysolmaz, B., İren, D., & Dau, N. (2020) · Hawaii International Conference on System Sciences (HICSS) · doi:10.24251/hicss.2020.648 · Cited by 31
The Value of Exact Analysis in Requirements Selection
Li, L., Harman, M., Wu, F., & Zhang, Y. (2016) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2016.2615100 · Cited by 31
Characterization of the Practice of Project Management in 30 Portuguese Metalworking Companies
Pinto, R., & Dominguez, C. E. (2012) · Procedia Technology · doi:10.1016/j.protcy.2012.09.010 · Cited by 31
Alqahtany, A., Rezgui, Y., & Li, H. (2014) · International Journal of Environmental Science and Development · doi:10.7763/ijesd.2014.v5.463 · Cited by 31
Selection of risk response actions considering risk dependency
Zhang, Y., & Zuo, F. (2016) · Kybernetes · doi:10.1108/k-05-2016-0096 · Cited by 31
Löbbers, J., Lins, S., Kromat, T., Benlian, A., & Sunyaev, A. (2020) · Electronic Commerce Research · doi:10.1007/s10660-020-09415-2 · Cited by 30
Should the EFQM Excellence Model be Adapted for Specific Industries? A Restaurant Sector Example
Liu, Y.-L., Ko, P.-F., Chiang, J.-T., & Shyr, W. (2020) · International Journal of Hospitality Management · doi:10.1016/j.ijhm.2020.102694 · Cited by 30
Wang, E. T. G., Wei, H., Jiang, J. J., & Klein, G. L. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.01.004 · Cited by 30
A framework for ex ante project risk assessment based on absorptive capacity
Cuellar, M. J., & Gallivan, M. J. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.07.008 · Cited by 30
Key Competencies of Filipino Teachers for Inclusive Education: Insights from a Delphi Study
Raguindin, P. Z. J., & Ping, L. Y. (2025) · SAGE Open · doi:10.1177/21582440251351731 · Cited by 30
Predicting the Impact of Multiple Risks on Project Performance: A Scenario-Based Approach
Bañuls, V. A., López, C., Turoff, M., & Tejedor, F. (2017) · Project Management Journal · doi:10.1177/875697281704800507 · Cited by 30
Cybersecurity service level agreements: understanding government data confidentiality requirements
Nugraha, Y., & Martin, A. (2022) · Journal of Cybersecurity · doi:10.1093/cybsec/tyac004 · Cited by 30
An alternative efficient representation for the project portfolio selection problem
Li, X., Huang, Y., Fang, S., & Zhang, Y. (2019) · European Journal of Operational Research · doi:10.1016/j.ejor.2019.08.022 · Cited by 30
Determining Optimal Proportion of Design in Design-Build Request for Proposals
Xia, B., Molenaar, K. R., Chan, A. P. C., Skitmore, M., & Zuo, J. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000643 · Cited by 30
Rival precedence and open platform adoption: An empirical analysis
Shim, S., Lee, B., & Kim, S. L. (2017) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2017.10.001 · Cited by 29
French, S. (2021) · Journal of the Operational Research Society · doi:10.1080/01605682.2021.1907244 · Cited by 29
The interstitiality of IT risk: An inquiry into information systems development practices
Öbrand, L., Augustsson, N., Mathiassen, L., & Holmström, J. (2018) · Information Systems Journal · doi:10.1111/isj.12178 · Cited by 29
An Adaptive Wideband Delphi Method to Study State Cyber-Defence Requirements
Nugraha, Y., Brown, I., & Sastrosubroto, A. S. (2015) · IEEE Transactions on Emerging Topics in Computing · doi:10.1109/tetc.2015.2389661 · Cited by 29
Wang, J., Keil, M., Oh, L., & Shen, Y. (2016) · Journal of Systems and Software · doi:10.1016/j.jss.2016.12.004 · Cited by 29
Self-citationKrishnan, S., Ganesh, L. S., & Rajendran, C. (2021) · Journal of Indian Business Research · doi:10.1108/jibr-02-2021-0060 · Cited by 29
Velasco, V., Celata, C., Griffin, K. W., & Estensione LST group (2021) · Frontiers in Public Health · doi:10.3389/fpubh.2021.716399 · Cited by 28
Partnering effects on user–developer conflict and role ambiguity in information system projects
Liu, J. Y.-C., Chiang, J. C., Yang, M., & Klein, G. L. (2011) · Information and Software Technology · doi:10.1016/j.infsof.2011.01.002 · Cited by 28
A novel methodology for evaluating the risk of CRM projects in fuzzy environment
Keramati, A., Nazari-Shirkouhi, S., Moshki, H., Afshari-Mofrad, M., & Berneti, E. M. (2012) · Neural Computing and Applications · doi:10.1007/s00521-012-1216-7 · Cited by 28
User advocacy and information system project performance
Wang, E. T. G., Chang, J. Y. T., Jiang, J.-Y. J., & Klein, G. L. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.011 · Cited by 28
Project risk analysis based on project characteristics
Shishodia, A., Dixit, V., & Verma, P. (2018) · Benchmarking An International Journal · doi:10.1108/bij-06-2017-0151 · Cited by 28
Building Information Systems Flexibility in SAP–LAP Framework: A Case Study Evidence from SME Sector
Palanisamy, R. (2012) · Global Journal of Flexible Systems Management · doi:10.1007/s40171-012-0005-6 · Cited by 28
Hu, Y., Mo, X., Zhang, X., Zeng, Y., Du, J., & Xie, K. (2012) · Journal of Software · doi:10.4304/jsw.7.2.440-449 · Cited by 28
Alqahtany, A., & Mohanna, A. B. (2019) · Housing Care and Support · doi:10.1108/hcs-01-2019-0002 · Cited by 28
G-RAM framework for software risk assessment and mitigation strategies in organisations
Biswas, B. N., & Mukhopadhyay, A. (2018) · Journal of Enterprise Information Management · doi:10.1108/jeim-05-2017-0069 · Cited by 28
Lee, H. K., Lee, J. S., & Keil, M. (2018) · Journal of Management Information Systems · doi:10.1080/07421222.2018.1523604 · Cited by 27
Self-citationOdusanya, S., Ochoa, J. J., Chileshe, N., & Ahn, S. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2020-0354 · Cited by 27
Schmidt, C. (2015) · Progress in IS · doi:10.1007/978-3-319-26057-0_2 · Cited by 27
Impact of Project Success Factors in Managing Software Projects in India: An Empirical Analysis
Bhoola, V. (2015) · Business Perspectives and Research · doi:10.1177/2278533715578555 · Cited by 27
Managing risk beyond the control of IS managers: the role of business management
Sherer, S. A. (2004) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2004.1265509 · Cited by 27
Developing a consensus-based measures for housing delivery in Dammam Metropolitan Area, Saudi Arabia
Alqahtany, A. (2019) · International Journal of Housing Markets and Analysis · doi:10.1108/ijhma-08-2018-0059 · Cited by 27
Addressing a critical success factor for software projects: A multi-round Delphi study of TSP
Nasir, M. H. N. M., & Sahibuddin, S. (2011) · International Journal of the Physical Sciences · doi:10.5897/ijps11.092 · Cited by 27
Risk assessment across life cycle phases for small and medium software
Bilal, M., Gani, A., Haseeb, M., Bashir, N., & Malik, N. (2020) · UMS Institutional Repository (Universiti Malaysia Sabah) · Cited by 27
Making a Method Work for a Project Situation in the Context of CMM
Aydın, M. N., & Harmsen, F. (2002) · Lecture notes in computer science · doi:10.1007/3-540-36209-6_15 · Cited by 27
Charalabidis, Y. K., Lampathaki, F., & Psarras, J. E. (2009) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2009.115 · Cited by 27
Assar, S., Boughzala, I., & Isckia, T. (2011) · Lecture notes in computer science · doi:10.1007/978-3-642-22878-0_18 · Cited by 26
Gap analysis of water governance in Northern Iran: A closer look into the water reservoirs
Mirzaei, A., Knierim, A., Nahavand, S. F., & Mahmoudi, H. (2017) · Environmental Science & Policy · doi:10.1016/j.envsci.2017.08.004 · Cited by 26
Mousavi, A., Ardalan, A., Takian, A., Ostadtaghizadeh, A., Naddafi, K., & Bavani, A. R. M. (2020) · BMC Public Health · doi:10.1186/s12889-020-09503-w · Cited by 26
User Participation in Contemporary IS Development: an IS management perspective
McLeod, L., MacDonell, S. G., & Doolin, B. (2007) · AJIS. Australasian journal of information systems/AJIS. Australian journal of information systems/Australian journal of information systems · doi:10.3127/ajis.v15i1.29 · Cited by 26
Risk factors in software development projects
Arshad, N. H., Mohamed, A., & Nor, Z. M. (2007) · Cited by 26
Thakurta, R., & Ahlemann, F. (2010) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2010.420 · Cited by 26
Conventional versus alternative pig production assessed by multicriteria decision analysis
Degré, A., Debouche, C., & Verhève, D. (2007) · Agronomy for Sustainable Development · doi:10.1051/agro:2007004 · Cited by 26
Mixed methods and the Delphi method
Taghipoorreyneh, M. (2022) · Elsevier eBooks · doi:10.1016/b978-0-12-818630-5.11078-4 · Cited by 25
A Delphi study to recognize and assess systems of systems vulnerabilities
Olivero, M. Á., Bertolino, A., Mayo, F. J. D., Matteucci, I., & Escalona, M. J. (2022) · Information and Software Technology · doi:10.1016/j.infsof.2022.106874 · Cited by 25
Reducing the risk of requirements volatility: findings from an empirical survey
Ferreira, S., Shunk, D. L., Collofello, J., Mackulak, G. T., & Dueck, A. C. (2010) · Journal of Software Maintenance and Evolution Research and Practice · doi:10.1002/smr.515 · Cited by 25
Risk Factors in Distributed Projects
Erickson, J. M., & Evaristo, R. (2006) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2006.424 · Cited by 25
Béjar, Y. (2006) · HAL · Cited by 25
Towards A Balanced Approach In Risk Identification
Letens, G., Nuffel, L. V., Heene, A., & Leysen, J. (2008) · Engineering Management Journal · doi:10.1080/10429247.2008.11431771 · Cited by 25
Project Management Learning: What the Literature Has to Say
Tesch, D., Kloppenborg, T. J., & Stemmer, J. K. (2003) · Project Management Journal · doi:10.1177/875697280303400405 · Cited by 25
Kim, J. U., & Kishore, R. (2018) · Information Systems Frontiers · doi:10.1007/s10796-018-9838-7 · Cited by 24
Boughzala, I. (2016) · Journal of Organizational and End User Computing · doi:10.4018/joeuc.2016040107 · Cited by 24
Metadata
- Authors
- Schmidt, R., Lyytinen, K., Keil, M., & Cule, P.
- Venue
- Journal of Management Information Systems
- Publisher
- Informa UK Limited
- Published
- 2001-03
- Volume
- 17
- Issue
- 4
- Pages
- 5-36
- ISSN
- 0742-1222 (ISSN-L)
- 1557-928X
- OpenAlex
- W2102044943
- Cited by
- 1,252
- References
- 32
- FWCI
- 64.03
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.