Identifying Software Project Risks: An International Delphi Study
The DOI matches its Crossref record; 33 of the 33 references it cites were found in a registry or an index.
Abstract
Advocates of software risk management claim that by identifying and analyzing threats to success (i.e., risks) action can be taken to reduce the chance of failure of a project. The first step in the risk management process is to identify the risk itself, so that appropriate countermeasures can be taken. One problem in this task, however, is that no validated lists are available to help the project manager understand the nature and types of risks typically faced in a software project. This paper represents a first step toward alleviating this problem by developing an authoritative list of common risk factors. We deploy a rigorous data collection method called a "ranking-type" Delphi survey to produce a rank-order list of risk factors. This data collection method is designed to elicit and organize opinions of a panel of experts through iterative, controlled feedback. Three simultaneous surveys were conducted in three different settings: Hong Kong, Finland, and the United States. This was done to broaden our view of the types of risks, rather than relying on the view of a single culture-an aspect that has been ignored in past risk management research. In forming the three panels, we recruited experienced project managers in each country. The paper presents the obtained risk factor list, compares it with other published risk factor lists for completeness and variation, and analyzes common features and differences in risk factor rankings in the three countries. We conclude by discussing implications of our findings for both research and improving risk management practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“a recognized limitation of any study utilizing a Delphi procedure is the selection of participants identified to lend their experience and expertise to the research (Linstone & Turoff, 2002;Schmidt, Lyytinen, Keil, & Cule, 2001;Welty, 1972).”
From A Delphi Study to Operationalize Evidence-Based Predictors in Secondary Transition (2015) · cites this paper as Schmidt, Lyytinen, Keil, & Cule, 2001
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Nonparametric Statistics for the Behavioral Sciences
Guitton, H., & Siegel, S. (1958) · Revue économique · doi:10.2307/3498751 · Cited by 35,245
Cultures and Organizations: Software of the Mind.
Triandis, H. C., & Hofstede, G. (1993) · Administrative Science Quarterly · doi:10.2307/2393257 · Cited by 17,696
Culture's Consequences: International Differences in Work-Related Values.
Sorge, A., & Hofstede, G. (1983) · Administrative Science Quarterly · doi:10.2307/2393017 · Cited by 15,062
Managerial Perspectives on Risk and Risk Taking
March, J. G., & Shapira, Z. (1987) · Management Science · doi:10.1287/mnsc.33.11.1404 · Cited by 3,183
Humphrey, W. S. (1989) · CERN Document Server (European Organization for Nuclear Research) · Cited by 2,005
Decision support systems : an organizational perspective
Keen, P., & Morton, M. S. S. (1978) · Addison-Wesley Longman Publishing Co., Inc. eBooks · Cited by 1,673
Software risk management: principles and practices
Boehm, B. W. (1991) · IEEE Software · doi:10.1109/52.62930 · Cited by 1,578
Unifying the fragmented models of information systems implementation
Kwon, T.-H., & Zmud, R. W. (1987) · John Wiley & Sons, Inc. eBooks · Cited by 1,463
Managing Delphi Surveys Using Nonparametric Statistical Techniques*
Schmidt, R. C. (1997) · Decision Sciences · doi:10.1111/j.1540-5915.1997.tb01330.x · Cited by 1,141
Self-citationIndividual Differences and MIS Success: A Review of the Empirical Literature
Zmud, R. W. (1979) · Management Science · doi:10.1287/mnsc.25.10.966 · Cited by 836
Cited by
Items 101–200 of 1,001
The Impact of XBRL: A Delphi Investigation
Baldwin, A. A., & Trinkle, B. S. (2011) · The International Journal of Digital Accounting Research · doi:10.4192/1577-8517-v11_1 · Cited by 123
Demlehner, Q., Schoemer, D., & Laumer, S. (2021) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2021.102317 · Cited by 121
Hughes, D. L., Dwivedi, Y. K., Rana, N. P., & Simintiras, A. C. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1217571 · Cited by 120
Alawneh, R., Ghazali, F. E. M., Ali, H. H., & Sadullah, A. F. M. (2019) · Sustainable Cities and Society · doi:10.1016/j.scs.2019.101612 · Cited by 118
Exploring the relationship between software project duration and risk exposure: A cluster analysis
Huang, S.-J., & Han, W.-M. (2008) · Information & Management · doi:10.1016/j.im.2008.02.001 · Cited by 118
Choquet integral based aggregation approach to software development risk assessment
Büyüközkan, G., & Ruan, D. (2009) · Information Sciences · doi:10.1016/j.ins.2009.09.009 · Cited by 117
Liu, L., & Yetton, P. (2007) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2007.906852 · Cited by 116
de Castro, G. A., Basco, R., Iturralde, T., & Maseda, A. (2017) · Journal of Family Business Strategy · doi:10.1016/j.jfbs.2017.08.002 · Cited by 113
Iden, J., & Langeland, L. (2010) · Information Systems Management · doi:10.1080/10580531003708378 · Cited by 113
A risk management framework for distributed agile projects
Shrivastava, S. V., & Rathod, U. (2017) · Information and Software Technology · doi:10.1016/j.infsof.2016.12.005 · Cited by 112
Zhang, Y., Liu, S., Tan, J., Jiang, G., & Zhu, Q. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.02.002 · Cited by 112
Ekionea, J.-P. B., Bernard, P. M., & Plaisent, M. (2011) · Recherches qualitatives · doi:10.7202/1085878ar · Cited by 112
Developing sustainable building assessment scheme for Saudi Arabia: Delphi consultation approach
Alyami, S. H., Rezgui, Y., & Kwan, A. (2013) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.06.011 · Cited by 111
A Delphi study examining risk and uncertainty management in circular supply chains
de Lima, F. A., & Seuring, S. A. (2023) · International Journal of Production Economics · doi:10.1016/j.ijpe.2023.108810 · Cited by 111
Ameyaw, E. E., & Chan, A. P. C. (2016) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000297 · Cited by 111
Risks in offshore IT outsourcing: A service provider perspective
Aundhe, M. D., & Mathew, S. K. (2009) · European Management Journal · doi:10.1016/j.emj.2009.01.004 · Cited by 110
Haq, S. U., Gu, D., Liang, C., & Abdullah, I. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.02.008 · Cited by 109
Do scaling agile frameworks address global software development risks? An empirical study
Beecham, S., Clear, T., Lal, R., & Noll, J. (2020) · Journal of Systems and Software · doi:10.1016/j.jss.2020.110823 · Cited by 108
Ferreira, S., Collofello, J., Shunk, D. L., & Mackulak, G. T. (2009) · Journal of Systems and Software · doi:10.1016/j.jss.2009.03.014 · Cited by 107
Context-Aware Business Process Management: Method Assessment and Selection
Brocke, J. V., Baier, M.-S., Schmiedel, T., Stelzl, K., Röglinger, M., & Wehking, C. (2021) · Business & Information Systems Engineering · doi:10.1007/s12599-021-00685-0 · Cited by 105
Calzolari, T., Bimpizas-Pinis, M., Genovese, A., & Brint, A. T. (2023) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2023.139686 · Cited by 103
Vendor Related Risks in IT Development: A Chronology of an Outsourced Project Failure
Natovich, J. (2003) · Technology Analysis and Strategic Management · doi:10.1080/095373203000136015 · Cited by 102
Early Warning Signs of it Project Failure: The Dominant Dozen
Kappelman, L. A., McKeeman, R., & Zhang, L. (2007) · EDPACS · doi:10.1080/07366980701238939 · Cited by 102
Liu, S., & Wang, L. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.10.003 · Cited by 101
The development of the field of HRD: a Delphi study
McGuire, D., & Cseh, M. (2006) · Journal of European Industrial Training · doi:10.1108/03090590610712304 · Cited by 101
Project failureen masse: a study of loose budgetary control in ISD projects
Conboy, K. (2010) · European Journal of Information Systems · doi:10.1057/ejis.2010.7 · Cited by 100
Rethinking IT governance for SMEs
Devos, J., Landeghem, H. V., & Deschoolmeester, D. (2012) · Industrial Management & Data Systems · doi:10.1108/02635571211204263 · Cited by 100
Windeler, J. B., Maruping, L. M., & Venkatesh, V. (2017) · Information Systems Research · doi:10.1287/isre.2017.0716 · Cited by 99
Hann, I.-H., Roberts, J. A., & Slaughter, S. A. (2013) · Information Systems Research · doi:10.1287/isre.2013.0474 · Cited by 97
“project management (Schmidt et al. 2001).”
Managing Erp System Risk in SMEs: A Multiple Case Study
Poba‐Nzaou, P., & Raymond, L. (2011) · Journal of Information Technology · doi:10.1057/jit.2010.34 · Cited by 97
Review of the Delphi method in library and information science research
Lund, B. D. (2020) · Journal of Documentation · doi:10.1108/jd-09-2019-0178 · Cited by 96
Determining Key Factors in E-Government Information System Security
Smith, S., & Jamieson, R. (2006) · Information Systems Management · doi:10.1201/1078.10580530/45925.23.2.20060301/92671.4 · Cited by 96
Information Technology Project Risk Management: Bridging the Gap between Research and Practice
Taylor, H., Artman, E., & Woelfer, J. P. (2012) · Journal of Information Technology · doi:10.1057/jit.2011.29 · Cited by 96
Critical success factors for public-private partnership in water supply projects
Ameyaw, E. E., & Chan, A. P. C. (2016) · Facilities · doi:10.1108/f-04-2014-0034 · Cited by 96
Hussein, B. (2015) · Education Sciences · doi:10.3390/educsci5020104 · Cited by 95
Critical risks in outsourced IT projects: the intractable and the unforeseen
Taylor, H. (2006) · Communications of the ACM · doi:10.1145/1167838.1167840 · Cited by 95
Sicotte, C., Jaana, M., Girouard, D., & Paré, G. (2008) · Methods of Information in Medicine · doi:10.3414/me0512 · Cited by 94
The Effects of Information Overload on Software Project Risk Assessment*
Pennington, R. R., & Tuttle, B. M. (2007) · Decision Sciences · doi:10.1111/j.1540-5915.2007.00167.x · Cited by 93
IS/IT Project Failures: A Review of the Extant Literature for Deriving a Taxonomy of Failure Factors
Dwivedi, Y. K., Ravichandran, K., Williams, M. D., Miller, S., Lal, B., Antony, G. V., & Kartik, M. (2013) · IFIP advances in information and communication technology · doi:10.1007/978-3-642-38862-0_5 · Cited by 93
Dhillon, G. S., Syed, R., & de Sá-Soares, F. (2016) · Information & Management · doi:10.1016/j.im.2016.10.002 · Cited by 93
Jiang, J. J., Klein, G. L., Wu, S. P. J., & Liang, T. (2008) · Journal of Systems and Software · doi:10.1016/j.jss.2008.11.833 · Cited by 93
Elucidation of IS project success factors: an interpretive structural modelling approach
Hughes, D. L., Rana, N. P., & Dwivedi, Y. K. (2020) · Annals of Operations Research · doi:10.1007/s10479-019-03146-w · Cited by 92
Factors Affecting On-Time Delivery in Large-Scale Agile Software Development
Kula, E., Greuter, E., van Deursen, A., & Gousios, G. (2021) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2021.3101192 · Cited by 92
Contextualized Relationship Between Knowledge Sharing and Performance in Software Development
Ozer, M., & Vogel, D. (2015) · Journal of Management Information Systems · doi:10.1080/07421222.2015.1063287 · Cited by 92
A survey on the characteristics of projects with success in delivering client benefits
Jørgensen, M. (2016) · Information and Software Technology · doi:10.1016/j.infsof.2016.05.008 · Cited by 92
Egfjord, K. F.-H., & Sund, K. J. (2019) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2019.119787 · Cited by 92
Neves, S. M., da Silva, C. E. S., Salomon, V. A. P., da Silva, A. F., & Sotomonte, B. E. P. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.007 · Cited by 91
Strategic scanning project failure and abandonment factors: lessons learned
Lesca, N., & Caron-Fasan, M.-L. (2008) · European Journal of Information Systems · doi:10.1057/ejis.2008.21 · Cited by 91
Ethical Issues in Big Data Analytics: A Stakeholder Perspective
Someh, I., Davern, M., Breidbach, C. F., & Shanks, G. (2019) · Communications of the Association for Information Systems · doi:10.17705/1cais.04434 · Cited by 90
Diagnosing organizational risks in software projects: Stakeholder resistance
Vrhovec, S. L. R., Hovelja, T., Vavpotič, D., & Krisper, M. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.03.007 · Cited by 90
Butler, C. W., Vijayasarathy, L. R., & Roberts, N. (2019) · Project Management Journal · doi:10.1177/8756972819848251 · Cited by 89
Information Technology Portfolio Management: Literature Review, Framework, and Research Issues
Kumar, R. L., Ajjan, H., & Niu, Y. (2008) · Information Resources Management Journal · doi:10.4018/irmj.2008070104 · Cited by 88
Norris, S. A., Anuar, H. M., Matzen, P., Cheah, J., Jensen, B. B., & Hanson, M. A. (2014) · BMC Public Health · doi:10.1186/1471-2458-14-s2-s6 · Cited by 87
Sato, S., Kang, T., Daigo, E., Matsuoka, H., & Harada, M. (2021) · Journal of Hospitality Leisure Sport & Tourism Education · doi:10.1016/j.jhlste.2021.100306 · Cited by 85
Sobaih, A. E. E., Ritchie, C., & Jones, E. (2012) · International Journal of Contemporary Hospitality Management · doi:10.1108/09596111211247227 · Cited by 85
The Risks of Agile Software Development: Learning from Adopters
Elbanna, A. R., & Sarker, S. (2015) · IEEE Software · doi:10.1109/ms.2015.150 · Cited by 85
Strategies for Improving Safety and Health of Ethnic Minority Construction Workers
Chan, A. P. C., Javed, A. A., Lyu, S., Hon, C. K. H., & Wong, F. K. W. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001148 · Cited by 85
Managing user expectations on software projects: Lessons from the trenches
Petter, S. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.05.014 · Cited by 84
Liu, A. Z., & Seddon, P. B. (2009) · Business Process Management Journal · doi:10.1108/14637150910987928 · Cited by 83
Participatory design: the will to succeed
Shapiro, D. (2005) · Proceedings of the 4th decennial conference on Critical computing: between sense and sensibility · doi:10.1145/1094562.1094567 · Cited by 83
Patnayakuni, R., & Ruppel, C. P. (2006) · Journal of the Association for Information Systems · doi:10.17705/1jais.00097 · Cited by 83
The influence of checklists and roles on software practitioner risk perception and decision-making
Keil, M., Li, L., Mathiassen, L., & Zheng, G. (2007) · Journal of Systems and Software · doi:10.1016/j.jss.2007.07.035 · Cited by 83
Self-citationCriteria for Selecting Cloud Service Providers: A Delphi Study of Quality-of-Service Attributes
Lang, M., Wiesche, M., & Krcmar, H. (2018) · Information & Management · doi:10.1016/j.im.2018.03.004 · Cited by 83
Evaluating key risk factors for PPP water projects in Ghana: a Delphi study
Ameyaw, E. E., & Chan, A. P. C. (2015) · Journal of Facilities Management · doi:10.1108/jfm-10-2013-0051 · Cited by 82
Grafting: Balancing Control and Cultivation in Information Infrastructure Innovation
Sanner, T. A., Manda, T. D., & Nielsen, P. (2014) · Journal of the Association for Information Systems · doi:10.17705/1jais.00356 · Cited by 81
Critical Factors that Lead to Projects’ Success/Failure in Global Marketplace
Taherdoost, H., & Keshavarzsaleh, A. (2016) · Procedia Technology · doi:10.1016/j.protcy.2016.01.151 · Cited by 81
Success in health information exchange projects: Solving the implementation puzzle
Sicotte, C., & Paré, G. (2010) · Social Science & Medicine · doi:10.1016/j.socscimed.2009.11.041 · Cited by 79
The Effects of Information Technology Project Complexity on Group Interaction
Roberts, T., Cheney, P. H., Sweeney, P. D., & Hightower, R. (2004) · Journal of Management Information Systems · doi:10.1080/07421222.2004.11045814 · Cited by 78
Attention-shaping tools, expertise, and perceived control in IT project risk assessment
Du, S., Keil, M., Mathiassen, L., Shen, Y., & Tiwana, A. (2006) · Decision Support Systems · doi:10.1016/j.dss.2006.10.002 · Cited by 78
Self-citationBagheri, M., Ibrahim, Z. Z., Mansor, S. B., Manaf, L. A., Akhir, M. F., Talaat, W. I. A. W., & Pour, A. B. (2021) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi10090621 · Cited by 76
Poba‐Nzaou, P., Lemieux, N., Beaupré, D., & Uwizeyemungu, S. (2016) · Journal of Business Research · doi:10.1016/j.jbusres.2016.06.006 · Cited by 75
Markmann, C., Spickermann, A., von der Gracht, H. A., & Brem, A. (2021) · FUTURES & FORESIGHT SCIENCE · doi:10.1002/ffo2.56 · Cited by 75
Review of the approaches for assessing protected areas' effectiveness
Chen, H., Zhang, T., Costanza, R., & Kubiszewski, I. (2022) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2022.106929 · Cited by 74
Measuring Payoff of Information Technology Investments: Research Issues and Guidelines
Kohli, R., & Sherer, S. A. (2002) · Communications of the Association for Information Systems · doi:10.17705/1cais.00914 · Cited by 74
Richardson, D. A., de Leeuw, S., & Dullaert, W. E. H. (2016) · Journal of Business Logistics · doi:10.1111/jbl.12112 · Cited by 73
Road safety issues for bus transport management
Cafiso, S. D., Graziano, A. D., & Pappalardo, G. (2013) · Accident Analysis & Prevention · doi:10.1016/j.aap.2013.06.010 · Cited by 73
Havelka, D., & Merhout, J. W. (2013) · International Journal of Accounting Information Systems · doi:10.1016/j.accinf.2012.12.001 · Cited by 70
Luthra, S., Mangla, S. K., Chan, F. T. S., & Venkatesh, V. G. (2018) · International Journal of Information Technology & Decision Making · doi:10.1142/s0219622017500419 · Cited by 70
Functionality Risk in Information Systems Development: An Empirical Investigation
Tiwana, A., & Keil, M. (2006) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2006.878099 · Cited by 70
Self-citationLeveraging Social Capital to Obtain Top Management Support in Complex, Cross-Functional IT Projects
Liu, G. H. W., Wang, E., & Chua, C. E. H. (2015) · Journal of the Association for Information Systems · doi:10.17705/1jais.00404 · Cited by 69
The Contribution of the Project Management Office: A Balanced Scorecard Perspective
Kutsch, E., Ward, J. M., Hall, M., & Algar, J. (2015) · Information Systems Management · doi:10.1080/10580530.2015.1018768 · Cited by 69
Electronic prescription system: do the professionals use it?
Spil, T. A. M., Schuring, R. W., & Michel-Verkerke, M. B. (2004) · International Journal of Healthcare Technology and Management · doi:10.1504/ijhtm.2004.004824 · Cited by 68
A Risk Mitigation Framework for Information Technology Projects: A Cultural Contingency Perspective
Maruping, L. M., Venkatesh, V., Thong, J. Y. L., & Zhang, X. (2019) · Journal of Management Information Systems · doi:10.1080/07421222.2018.1550555 · Cited by 68
Elucidation of big data analytics in banking: a four-stage Delphi study
Delgosha, M. S., Hajiheydari, N., & Fahimi, S. M. (2020) · Journal of Enterprise Information Management · doi:10.1108/jeim-03-2019-0097 · Cited by 68
Hirth, S., Kreinin, H., Fuchs, D. A., Blossey, N., Mamut, P., Philipp, J., & Radovan, I. (2023) · Frontiers in Sustainability · doi:10.3389/frsus.2023.1014662 · Cited by 68
Analysis and application of an outsourcing risk framework
Abdullah, L. M., & Verner, J. M. (2012) · Journal of Systems and Software · doi:10.1016/j.jss.2012.02.040 · Cited by 68
An economic–probabilistic model for risk analysis in technological innovation projects
Miorando, R., Ribeiro, J. L. D., & Cortimiglia, M. N. (2014) · Technovation · doi:10.1016/j.technovation.2014.01.002 · Cited by 67
Kramer, B. S., Walker, A. E., & Brill, J. M. (2007) · Educational Technology Research and Development · doi:10.1007/s11423-007-9048-3 · Cited by 66
Gotterbarn, D., & Rogerson, S. (2005) · Communications of the Association for Information Systems · doi:10.17705/1cais.01540 · Cited by 66
Venkatesh, V., Rai, A., & Maruping, L. M. (2017) · Information Systems Research · doi:10.1287/isre.2017.0723 · Cited by 66
Petter, S., & Randolph, A. B. (2009) · Project Management Journal · doi:10.1002/pmj.20130 · Cited by 66
Fit, failure, and the house of horrors: toward a configurational theory of IS project failure
Sauer, C., Southon, G., & Dampney, C. N. G. (1997) · AIS Electronic Library (AISeL) · doi:10.5555/353071.353141 · Cited by 65
Impact of incorrect and new requirements on waterfall software project outcomes
Chari, K., & Agrawal, M. (2017) · Empirical Software Engineering · doi:10.1007/s10664-017-9506-4 · Cited by 65
Goh, J. C.-L., Pan, S. L., & Zuo, M. (2013) · Journal of the Association for Information Systems · doi:10.17705/1jais.00348 · Cited by 64
Wehrle, M., Lechler, S., von der Gracht, H. A., & Hartmann, E. (2020) · Journal of Business Logistics · doi:10.1111/jbl.12259 · Cited by 64
Aritua, B., Smith, N. J., & Bower, D. A. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.04.004 · Cited by 64
Wu, D., Li, J., Xia, T., Bao, C., Zhao, Y., & Dai, Q. (2018) · Information Sciences · doi:10.1016/j.ins.2018.07.013 · Cited by 64
Campbell‐Johnston, K., de Munck, M., Vermeulen, W. J. V., & Backes, C. W. (2021) · Business Strategy and the Environment · doi:10.1002/bse.2856 · Cited by 63
Chiravuri, A., Nazareth, D., & Ramamurthy, K. (2011) · Journal of Management Information Systems · doi:10.2753/mis0742-1222280110 · Cited by 62
Expert assessment of the top platform independent cybersecurity skills for non-IT professionals
Carlton, M., & Levy, Y. M. (2015) · IEEE SoutheastCon · doi:10.1109/secon.2015.7132932 · Cited by 62
Metadata
- Authors
- Schmidt, R., Lyytinen, K., Keil, M., & Cule, P.
- Venue
- Journal of Management Information Systems
- Publisher
- Informa UK Limited
- Published
- 2001-03
- Volume
- 17
- Issue
- 4
- Pages
- 5-36
- ISSN
- 0742-1222 (ISSN-L)
- 1557-928X
- OpenAlex
- W2102044943
- Cited by
- 1,252
- References
- 32
- FWCI
- 64.03
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.