Abstract
Advocates of software risk management claim that by identifying and analyzing threats to success (i.e., risks) action can be taken to reduce the chance of failure of a project. The first step in the risk management process is to identify the risk itself, so that appropriate countermeasures can be taken. One problem in this task, however, is that no validated lists are available to help the project manager understand the nature and types of risks typically faced in a software project. This paper represents a first step toward alleviating this problem by developing an authoritative list of common risk factors. We deploy a rigorous data collection method called a "ranking-type" Delphi survey to produce a rank-order list of risk factors. This data collection method is designed to elicit and organize opinions of a panel of experts through iterative, controlled feedback. Three simultaneous surveys were conducted in three different settings: Hong Kong, Finland, and the United States. This was done to broaden our view of the types of risks, rather than relying on the view of a single culture-an aspect that has been ignored in past risk management research. In forming the three panels, we recruited experienced project managers in each country. The paper presents the obtained risk factor list, compares it with other published risk factor lists for completeness and variation, and analyzes common features and differences in risk factor rankings in the three countries. We conclude by discussing implications of our findings for both research and improving risk management practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“a recognized limitation of any study utilizing a Delphi procedure is the selection of participants identified to lend their experience and expertise to the research (Linstone & Turoff, 2002;Schmidt, Lyytinen, Keil, & Cule, 2001;Welty, 1972).”
From A Delphi Study to Operationalize Evidence-Based Predictors in Secondary Transition (2015) · cites this paper as Schmidt, Lyytinen, Keil, & Cule, 2001
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Nonparametric Statistics for the Behavioral Sciences
Guitton, H., & Siegel, S. (1958) · Revue économique · doi:10.2307/3498751 · Cited by 35,245
Cultures and Organizations: Software of the Mind.
Triandis, H. C., & Hofstede, G. (1993) · Administrative Science Quarterly · doi:10.2307/2393257 · Cited by 17,696
Culture's Consequences: International Differences in Work-Related Values.
Sorge, A., & Hofstede, G. (1983) · Administrative Science Quarterly · doi:10.2307/2393017 · Cited by 15,062
Managerial Perspectives on Risk and Risk Taking
March, J. G., & Shapira, Z. (1987) · Management Science · doi:10.1287/mnsc.33.11.1404 · Cited by 3,183
Humphrey, W. S. (1989) · CERN Document Server (European Organization for Nuclear Research) · Cited by 2,005
Decision support systems : an organizational perspective
Keen, P., & Morton, M. S. S. (1978) · Addison-Wesley Longman Publishing Co., Inc. eBooks · Cited by 1,673
Software risk management: principles and practices
Boehm, B. W. (1991) · IEEE Software · doi:10.1109/52.62930 · Cited by 1,578
Unifying the fragmented models of information systems implementation
Kwon, T.-H., & Zmud, R. W. (1987) · John Wiley & Sons, Inc. eBooks · Cited by 1,463
Managing Delphi Surveys Using Nonparametric Statistical Techniques*
Schmidt, R. C. (1997) · Decision Sciences · doi:10.1111/j.1540-5915.1997.tb01330.x · Cited by 1,141
Self-citationIndividual Differences and MIS Success: A Review of the Empirical Literature
Zmud, R. W. (1979) · Management Science · doi:10.1287/mnsc.25.10.966 · Cited by 836
Cited by
Items 801–900 of 1,001
Toward a better integration of requirements and model‐based specifications
Lebeaupin, B., & Rauzy, A. B. (2020) · Systems Engineering · doi:10.1002/sys.21560 · Cited by 6
Integrating Project Management and Change Management in an IS Curriculum
Jurison, J. (2002) · Communications of the Association for Information Systems · doi:10.17705/1cais.00802 · Cited by 6
Service-Oriented Software Development
Keith, M. J., Demirkan, H., & Goul, M. (2009) · AIS Electronic Library (AISeL) · Cited by 6
Key Success Factors in Software Development ProjectsPreprint
Dubey, S. J. (2011) · SSRN Electronic Journal · doi:10.2139/ssrn.1952935 · Cited by 6
Theorizing outliers: explaining variation in IT project performance
Budzier, A. (2014) · Oxford University Research Archive (ORA) (University of Oxford) · doi:10.5287/ora-2rxrqbwew · Cited by 6
ERP Diffusion and Mimetic BehaviorsPreprint
Leroux, E., Pupion, P.-C., & Sahut, J. (2011) · RePEc: Research Papers in Economics · Cited by 6
Human Factors and the Systems Development Process
Fisher, J. (2003) · IGI Global eBooks · doi:10.4018/978-1-59140-104-9.ch010 · Cited by 6
(2011) · RUCforsk (Roskilde University) · Cited by 5
Risk management and tacit knowledge in IT projects: making the implicit explicit
Taylor, H. (2004) · Cited by 5
A Six-stage Instructional Design Model for Collaborative Implementation of Integrated STEM Education
Ku, C., Lin, K., Kwon, H., & Kelley, T. R. (2025) · Journal of Technology Education · doi:10.21061/jte.v36i2.a.3 · Cited by 5
The Organizational Culture’s Influence on Risks in IT Projects – a Structuration Perspective
Prifling, M. (2010) · Americas Conference on Information Systems · Cited by 5
Manda, T. D., & Sanner, T. A. (2014) · International Journal of User-Driven Healthcare · doi:10.4018/ijudh.2014010101 · Cited by 5
Nazari, A. M., Abbaszadeh, A., Kazemi, R., Nasiri, M., & Zandi, M. (2025) · BMC Medical Education · doi:10.1186/s12909-025-07623-8 · Cited by 5
The management of risk awareness in relation to information technology (MERIT)
Alseiari, K. B. I. (2015) · Research Repository (University of Gloucestershire) · Cited by 5
Specifying the Software Project Risk Construct
El-Masri, M., & Rivard, S. (2010) · AIS Electronic Library (AISeL) · Cited by 5
Uyei, J., Li, L., & Braithwaite, R. S. (2015) · American Journal of Public Health · doi:10.2105/ajph.2015.302799 · Cited by 5
Bello, A. S., Abdullahi, M., & Ahmadu, H. A. (2022) · Malaysian journal of real estate/International journal of real estate studies · doi:10.11113/intrest.v16n2.167 · Cited by 5
Critical risk factors of electric road uptake on motorways: a Swedish Delphi study
Sällberg, H., & Numminen, E. (2023) · Transportation Planning and Technology · doi:10.1080/03081060.2023.2294339 · Cited by 5
Poon, S. K.-S., Young, R., Irandoost, S., & Land, L. P. W. (2011) · University of Canberra Research Portal · Cited by 5
Information infrastructure risk : perspectives, practices a technologies
Öbrand, L. (2015) · Cited by 5
Maes, K., Haes, S. D., & Grembergen, W. V. (2016) · Advances in business information systems and analytics book series · doi:10.4018/978-1-5225-0861-8.ch001 · Cited by 5
Energy-led refurbishment of non-domestic buildings: ranking measures by attributes
Strachan, M. E., & Banfill, P. F. G. (2017) · Facilities · doi:10.1108/f-04-2016-0036 · Cited by 5
Exploring Win-Win Contracts: An Appreciative Inquiry into IT Project Management
Mathiassen, L., & Napier, N. P. (2014) · The Journal of Information Technology Theory and Application · Cited by 5
All Roads Lead to Burning Rome: Towards a Conceptual Model of IT Project Success
Jöhnk, J., Hartmann, M., & Urbach, N. (2020) · doi:10.30844/wi_2020_m6-joehnk · Cited by 5
NEGOTIATING RESPONSE-ABILITY AND REPEAT- ABILITY IN REQUIREMENTS ENGINEERING
Napier, N. P., Mathiassen, L., & Johnson, R. (2006) · AIS Electronic Library (AISeL) · Cited by 5
Ramly, M. K. A., Mohamad, M. F., & Noor, S. N. A. M. (2023) · AIP conference proceedings · doi:10.1063/5.0109977 · Cited by 5
Key factors in e-government information system security
Jamieson, R., & Smith, S. (2005) · AIS Electronic Library (AISeL) · Cited by 5
Hertzum, M., & Pries‐Heje, J. (2009) · RUCforsk (Roskilde University) · Cited by 5
An empirical study of information systems security, understanding and awareness in E-government
Smith, S. J. C. (2005) · UNSWorks (UNSW Sydney) · doi:10.26190/unsworks/23471 · Cited by 5
AN EXAMINATION OF DECISION -MAKING IN IT PROJECTS FROM RATIONAL AND NATURALISTIC PERSPECTIVES
Taylor, H. (2007) · AIS Electronic Library (AISeL) · Cited by 5
An Information-Entropy-based Risk Measurement Method of Software Development Project
Jiang, R. (2014) · Journal of information science and engineering · doi:10.6688/jise.2014.30.5.1 · Cited by 5
Lerro, A., & Schiuma, G. (2015) · Measuring Business Excellence · doi:10.1108/mbe-04-2015-0023 · Cited by 5
Karimi, T., Fathi, M., & Yahyazade, Y. (2020) · DOAJ (DOAJ: Directory of Open Access Journals) · doi:10.22094/joie.2020.1883892.1700 · Cited by 5
Poba‐Nzaou, P. (2016) · Journal of Healthcare Communications · doi:10.4172/2472-1654.10008 · Cited by 5
Towards a Stakeholder Analysis of Information Systems Development Project Abandonment
Pan, G., & Flynn, D. J. (2003) · Singapore Management University Institutional Knowledge (InK) (Singapore Management University) · Cited by 5
Warren, A. M. (2014) · CERES (Cranfield University) · Cited by 5
Introducing innovations into Open Source projects
Özbek, S. C. (2011) · Universitätsbibliothek der FU Berlin Hochschulschriftenstelle u. Dokumentenserver · doi:10.17169/refubium-17161 · Cited by 5
Poba‐Nzaou, P. (2008) · Le dépôt institutionnel (Université du Québec à Trois-Rivières) · Cited by 5
Risk Factors in Vendor-Driven IT Projects
Taylor, H. (2004) · AIS Electronic Library (AISeL) · Cited by 5
Sociología de las instituciones digitales: el estudio de la economía colaborativa
de Rivera, J. (2019) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · Cited by 5
Hatefi, M., & Fasanghari, M. (2016) · The International Arab Journal of Information Technology · Cited by 5
THE SHAPING OF MANAGERS' SECURITY OBJECTIVES THROUGH INFORMATION SECURITY AWARENESS TRAINING
Harris, M. A. (2010) · VCU Scholars Compass (Virginia Commonwealth University) · doi:10.25772/ywxf-6b47 · Cited by 5
Electronic Medical Records Application Development: Perspectives of the Service Provider
Palvia, P., & Thambusamy, R. (2013) · Journal of Information Technology Case and Application Research · doi:10.1080/15228053.2013.11082801 · Cited by 5
Testing Software Development Project Productivity Model
Lipkin, I. (2011) · OhioLink ETD Center (Ohio Library and Information Network) · Cited by 5
Management Information Systems
Laudon, K. C. L. J. P. (2012) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.5028201 · Cited by 5
A multi-criteria project assessment framework for R&D organizations in the IT sector
Sökmen, N. (2014) · Portland International Conference on Management of Engineering and Technology (PICMET) · Cited by 5
Profound Learning and Living: An Exploratory Delphi Study
Carr-Chellman, D. J., & Kroth, M. (2018) · New Prairie Press (Kansas State University) · Cited by 5
A Method for Effective IT Project Risk Management
Nayak, M. (2020) · International Journal of Engineering and Advanced Technology · doi:10.35940/ijeat.c5629.029320 · Cited by 5
FET GRUNNMUR FOR MAGER PRODUKSJON: SUKSESSFAKTORER FOR IMPLEMENTERING AV LEAN
Iden, J., Farbu, A., & Serigstad, E. (2015) · Cited by 5
Colmenares, L. E. (2008) · Cited by 5
Kayıkçı, Y., Bartolacci, M. R., & LeBlanc, L. J. (2018) · Advances in logistics, operations, and management science book series · doi:10.4018/978-1-5225-5273-4.ch001 · Cited by 5
Khatavakhotan, A. S., & Ow, S. H. (2012) · International Conference on Intelligent Systems, Modelling and Simulation · doi:10.1109/isms.2012.47 · Cited by 5
CorMod: A CAUSAL MAPPING APPROACH TO IDENTIFYING PROJECT DEVELOPMENT RISK
Alshehab, A., Hughes, R. T., & Winstanley, G. (2006) · University of Brighton Repository (University of Brighton) · Cited by 5
Stavrou, G., Pankratz, O., & Basten, D. (2014) · AIS Electronic Library (AISeL) · Cited by 5
An IT project postmortem: identifying root causes and eliminating rival explanations
Schmidt, J. (2024) · Journal of Information Technology Case and Application Research · doi:10.1080/15228053.2024.2426965 · Cited by 4
An empirical evaluation of the advance pricing agreement process in the UK
Avoseh, O. O. (2014) · Enlighten: Theses (The University of Glasgow) · Cited by 4
Robey, D., & Khoo, H. M. (2006) · Cited by 4
Problems in the Interplay of IS Development and IT Operations: An Alignment Analysis
Iden, J., Tessem, B., & Päivärinta, T. (2013) · Springer eBooks · doi:10.1007/978-1-4614-4951-5_3 · Cited by 4
Rahman, M. H., Yeoh, W., Pal, S., & Nguyen, L. (2026) · Business & Information Systems Engineering · doi:10.1007/s12599-026-00996-0 · Cited by 4
Cruise, D., Jaana, M., Sinden, D., & Garcia, L. (2024) · Journal of Aging & Social Policy · doi:10.1080/08959420.2024.2415172 · Cited by 4
Towards a process selection method for embedded analytics
Bender, T. (2024) · Information Systems and e-Business Management · doi:10.1007/s10257-024-00675-1 · Cited by 4
IS PROJECT RISKS AS EMERGENT PHENOMENA: TOWARDS A MODEL OF RISK ESCALATION AND ITS MANAGEMENT
Lin, A., & Parinyavuttichai, N. (2015) · White Rose Research Online (University of Leeds, The University of Sheffield, University of York) · Cited by 4
Risk assessment models for resource failure in grid computing
Alsoghayer, R. (2011) · White Rose eTheses Online (University of Leeds, The University of Sheffield, University of York) · Cited by 4
Charateristics and Impact of Interpersonal Conflicts on Requirements Risks
Walia, A. (2012) · Scholarship@Western (Western University) · Cited by 4
Pervasive business intelligence: a marketing intelligence framework proposal
Guarda, T. (2015) · Portuguese National Funding Agency for Science, Research and Technology (RCAAP Project by FCT) · Cited by 4
The risk factors affecting to the software quality failures in Sri Lankan Software industryPreprint
Gamage, N. B. J. (2017) · arXiv (Cornell University) · doi:10.48550/arxiv.1705.09822 · Cited by 4
Development of an Agile Requirements Risk Prioritization Method: A Design Science Research Study
Tuunanen, T., Vartiainen, T., Kainulainen, S., & Ebrahim, M. (2023) · Communications of the Association for Information Systems · doi:10.17705/1cais.05226 · Cited by 4
Project Risk Management Incorporating Knight, Ellsberg & Kahneman
Prpić, J. (2016) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2016.700 · Cited by 4
Spil, T. A. M., Katsma, C., Ligt, E., & Wassenaar, A. (2005) · Cited by 4
SYSTEM DEVELOPMENT TEAM FLEXIBILITY: ITS ANTECEDENTS AND PROJECT PERFORMANCE
Chang, K., & Wong, J.-H. (2008) · AIS Electronic Library (AISeL) · Cited by 4
Liu, G. H. W., & Chua, C. E. H. (2019) · Emerald Group Publishing Limited eBooks · doi:10.1108/978-1-78756-983-620191017 · Cited by 4
Impacts of Organizationa; Behavior on IT Project Teams: Leadership's Impact on Social Loafing
Baker, E. W., & Thompson, R. A. (2014) · AIS Electronic Library (AISeL) · Cited by 4
Interchange roles of formal and informal project management on business operational success
Kafaji, M. (2022) · Production Planning & Control · doi:10.1080/09537287.2022.2089265 · Cited by 4
Understanding IS development and acquisition: a process approach
McLeod, L. (2008) · Tuwhera (Auckland University of Technology) · Cited by 4
Fit of Development Methodologies in Software Projects
Rajagopalan, S., Mathew, S. K., & Sugumaran, V. (2016) · Americas Conference on Information Systems · Cited by 4
Musigmann, B., von der Gracht, H. A., & Hartmann, E. (2025) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2023.3264112 · Cited by 4
Multi-step Generation of Bayesian Networks Models for Software Projects Estimations
Fuentetaja, R., Borrajo, D., López, C. L., & Ocón, J. (2013) · International Journal of Computational Intelligence Systems · doi:10.1080/18756891.2013.805583 · Cited by 4
Discovering important source code terms
Rodeghero, P. (2016) · ACM/IEEE International Conference on Software Engineering: Companion Proceedings (ICSE-Companion) · doi:10.1145/2889160.2891037 · Cited by 4
Consensus Definition of Self-Love: A Delphi Study
Underwood, J. (2021) · Cited by 4
Nelms, C. (2012) · cIRcle (University of British Columbia) · doi:10.14288/1.0071855 · Cited by 4
Lin, A., & Chen, S.-H. (2012) · Journal of Global Information Management · doi:10.4018/jgim.2013010101 · Cited by 4
An Analysis of the Components of Project Success
Hughes, D. L., Dwivedi, Y. K., Simintiras, A. C., & Rana, N. P. (2015) · SpringerBriefs in information systems · doi:10.1007/978-3-319-23000-9_3 · Cited by 4
Human Resource Management in Nepal: A Delphi Study
Gurung, A., & Choi, M. (2019) · The East Asian Journal of Business Management · doi:10.13106/eajbm.2019.vol9.no1.5 · Cited by 4
Kusumo, D. S., Staples, M., Zhu, L., & Jeffery, R. (2012) · Proceedings of the ... ACM-IEEE International Symposium on Empirical Software Engineering and Measurement/International Symposium on Empirical Software Engineering and Measurement · doi:10.1145/2372251.2372263 · Cited by 4
The future of organizational change management
Paul, M. L. (2015) · Cited by 5
Nottbrock, C., Looy, A. V., & Haes, S. D. (2024) · Business & Information Systems Engineering · doi:10.1007/s12599-024-00913-3 · Cited by 4
DEFINING KNOWLEDGE MANAGEMENT SYSTEM RISK
Aubert, B. A., Bernard, J.-G., & Caro-Gonzalez, C. (2011) · AIS Electronic Library (AISeL) · Cited by 4
IT Program Goal Interdependence and Team Process Adjustment
Chang, J. Y. T., Jiang, J. J., Wang, E. T. G., & Klein, G. L. (2012) · AIS Electronic Library (AISeL) · Cited by 4
Science des données, réseaux sociaux et politiques publiques
Aubert, B. A., de Marcellis-Warin, N., & Warin, T. (2020) · PolyPublie (École Polytechnique de Montréal) · Cited by 4
Project Effort Estimation using COCOMO-2 Metrics with Fuzzy Logic
Yadav, R. K., & Niranjan, S. (2017) · Indian Journal of Science and Technology · doi:10.17485/ijst/2017/v10i29/115882 · Cited by 4
OVER-REQUIREMENT IN SOFTWARE DEVELOPMENT: AN EMPIRICAL INVESTIGATION OF THE 'IKEA' EFFECT
Shmueli, O., Fink, L., & Pliskin, N. (2012) · AIS Electronic Library (AISeL) · Cited by 4
Condicionantes de sucesso em projetos de software e sua influência nos resultados
de Moura, R. L., Carneiro, T. C. J., & Freitas, E. R. (2018) · Revista Gestão & Tecnologia · doi:10.20397/2177-6652/2018.v18i1.1115 · Cited by 4
Steuerung plattformbasierter Servicemarktplätze
Manner, J. (2014) · mediaTUM (Technical University of Munich) · Cited by 4
Pirhonen, M. (2013) · Jyväskylä University Digital Archive (University of Jyväskylä) · Cited by 4
Perspectives on E-Business Software Project Risk
Stevens, K. J., & Fowell, S. (2003) · AIS Electronic Library (AISeL) · Cited by 4
Trajectory of an IT Project network: Convergence, divergence and adjustement process
Meïer, O., & Missonier, S. (2012) · European Conference on Information Systems · Cited by 4
Zafar, H., Clark, J. G., Ko, M., & Au, Y. A. (2011) · AIS Electronic Library (AISeL) · Cited by 4
Prognosis and Multiobjective Optimization of the Sampling Plan for Cylindricity Evaluation
Mian, S. H., Umer, U., Abdulhameed, O., & Alkhalefah, H. (2020) · Mathematical Problems in Engineering · doi:10.1155/2020/8201312 · Cited by 4
Gerenciamento de riscos em projetos de desenvolvimento de software com Scrum
Rech, P. J. (2013) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · Cited by 4
Empfehlungen für den Umgang mit Heterogenität in IT-Servicewertschöpfungsnetzwerken
Heininger, R. (2018) · mediaTUM (Technical University of Munich) · Cited by 4
Metadata
- Authors
- Schmidt, R., Lyytinen, K., Keil, M., & Cule, P.
- Venue
- Journal of Management Information Systems
- Publisher
- Informa UK Limited
- Published
- 2001-03
- Volume
- 17
- Issue
- 4
- Pages
- 5-36
- ISSN
- 0742-1222 (ISSN-L)
- 1557-928X
- OpenAlex
- W2102044943
- Cited by
- 1,252
- References
- 32
- FWCI
- 64.03
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.