Identifying Software Project Risks: An International Delphi Study
The DOI matches its Crossref record; 33 of the 33 references it cites were found in a registry or an index.
Abstract
Advocates of software risk management claim that by identifying and analyzing threats to success (i.e., risks) action can be taken to reduce the chance of failure of a project. The first step in the risk management process is to identify the risk itself, so that appropriate countermeasures can be taken. One problem in this task, however, is that no validated lists are available to help the project manager understand the nature and types of risks typically faced in a software project. This paper represents a first step toward alleviating this problem by developing an authoritative list of common risk factors. We deploy a rigorous data collection method called a "ranking-type" Delphi survey to produce a rank-order list of risk factors. This data collection method is designed to elicit and organize opinions of a panel of experts through iterative, controlled feedback. Three simultaneous surveys were conducted in three different settings: Hong Kong, Finland, and the United States. This was done to broaden our view of the types of risks, rather than relying on the view of a single culture-an aspect that has been ignored in past risk management research. In forming the three panels, we recruited experienced project managers in each country. The paper presents the obtained risk factor list, compares it with other published risk factor lists for completeness and variation, and analyzes common features and differences in risk factor rankings in the three countries. We conclude by discussing implications of our findings for both research and improving risk management practice.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“a recognized limitation of any study utilizing a Delphi procedure is the selection of participants identified to lend their experience and expertise to the research (Linstone & Turoff, 2002;Schmidt, Lyytinen, Keil, & Cule, 2001;Welty, 1972).”
From A Delphi Study to Operationalize Evidence-Based Predictors in Secondary Transition (2015) · cites this paper as Schmidt, Lyytinen, Keil, & Cule, 2001
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Nonparametric Statistics for the Behavioral Sciences
Guitton, H., & Siegel, S. (1958) · Revue économique · doi:10.2307/3498751 · Cited by 35,245
Cultures and Organizations: Software of the Mind.
Triandis, H. C., & Hofstede, G. (1993) · Administrative Science Quarterly · doi:10.2307/2393257 · Cited by 17,696
Culture's Consequences: International Differences in Work-Related Values.
Sorge, A., & Hofstede, G. (1983) · Administrative Science Quarterly · doi:10.2307/2393017 · Cited by 15,062
Managerial Perspectives on Risk and Risk Taking
March, J. G., & Shapira, Z. (1987) · Management Science · doi:10.1287/mnsc.33.11.1404 · Cited by 3,183
Humphrey, W. S. (1989) · CERN Document Server (European Organization for Nuclear Research) · Cited by 2,005
Decision support systems : an organizational perspective
Keen, P., & Morton, M. S. S. (1978) · Addison-Wesley Longman Publishing Co., Inc. eBooks · Cited by 1,673
Software risk management: principles and practices
Boehm, B. W. (1991) · IEEE Software · doi:10.1109/52.62930 · Cited by 1,578
Unifying the fragmented models of information systems implementation
Kwon, T.-H., & Zmud, R. W. (1987) · John Wiley & Sons, Inc. eBooks · Cited by 1,463
Managing Delphi Surveys Using Nonparametric Statistical Techniques*
Schmidt, R. C. (1997) · Decision Sciences · doi:10.1111/j.1540-5915.1997.tb01330.x · Cited by 1,141
Self-citationIndividual Differences and MIS Success: A Review of the Empirical Literature
Zmud, R. W. (1979) · Management Science · doi:10.1287/mnsc.25.10.966 · Cited by 836
Cited by
Items 601–700 of 1,001
Gamification risks in collaborative information systems: identification and management method.
Algashami, A. M. (2019) · Bournemouth University Research Online (Bournemouth University) · Cited by 11
Sahasrabudhe, S., Shaikh, N., & Kasat, K. (2020) · Journal of Statistics and Management Systems · doi:10.1080/09720510.2020.1736328 · Cited by 11
IMPLEMENTING PPP WATER SUPPLY PROJECTS IN GHANA: A MODEL OF CSFs
Ameyaw, E. E., & Chan, A. P. C. (2015) · African Journal Of Applied Research · Cited by 11
WHAT SCIENTIFIC CONCEPTS ARE REQUIRED TO UNDERSTAND CLIMATE CHANGE
Jarrett, L. E., Takacs, G. J., & Ferry, B. (2011) · Proceedings of The Australian Conference on Science and Mathematics Education (formerly UniServe Science Conference) · Cited by 11
Systems dynamics model for decision support in risk assessment in software projects
Lopes, J. D. S., Braga, J. L., & Filho, M. D. A. R. (2015) · Journal of Software Evolution and Process · doi:10.1002/smr.1754 · Cited by 11
Adolfsson, M., Björck‐Åkesson, E., & Lim, C.-I. (2013) · British Journal of Occupational Therapy · doi:10.4276/030802213x13627524435144 · Cited by 11
The Role of Perceived Control, Attention-Shaping, and Expertise in IT Project Risk Assessment
Du, S., Keil, M., Mathiassen, L., Shen, Y., & Tiwana, A. (2006) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2006.483 · Cited by 11
Self-citationOn the Provisioning of Mission Critical Information Systems based on Public Tenders
Koski, A. (2019) · Helda - University of Helsinki Institutional Repository · Cited by 10
López, Á. J. G., de Rivera, J., & Cassidy, P. R. (2020) · Empiria Revista de metodología de ciencias sociales · doi:10.5944/empiria.49.2021.29233 · Cited by 10
Forth Industrial Revolution (4 IR) : digital disruption of cyber-physical systems
Kasza, J. (2018) · Jagiellonian University Repository (Jagiellonian University) · Cited by 10
Sundén, S., & Wicander, G. (2006) · Cited by 10
Ortiz‐Marcos, I., Rodrigo, L., Palacios, M., & Rodríguez‐Rivero, R. (2025) · Journal of Innovation & Knowledge · doi:10.1016/j.jik.2025.100908 · Cited by 10
Mum Effect as an Offshore Outsourcing Risk: A Study of Differences in Perceptions
Sajeev, A. S. M., & Ramingwong, S. (2009) · The Computer Journal · doi:10.1093/comjnl/bxn077 · Cited by 10
Toward An Integrated Framework of Software Project Threats
Bannerman, P. L. (2008) · Australasian Software Engineering Conference (ASWEC) · doi:10.1109/aswec.2008.4483202 · Cited by 10
Navigating Rumsfeld's quadrants: A performative perspective on IT risk management
Öbrand, L., Holmström, J., & Newman, M. (2017) · Technology in Society · doi:10.1016/j.techsoc.2017.09.009 · Cited by 10
Nuijten, A. L. P., Keil, M., & Zwiers, B. (2023) · Journal of Information Systems · doi:10.2308/isys-2020-040 · Cited by 10
Self-citationSudusinghe, J. I., & Seuring, S. A. (2025) · Production Planning & Control · doi:10.1080/09537287.2025.2484556 · Cited by 10
Challenges in an inter-organisational information system implementation : participatory view
Halonen, R. (2007) · Cited by 10
PEMBINAAN KERANGKA STANDARD KOMPETENSI LITERASI ICT KEBANGSAAN: KAJIAN DELPHI
Sani, R. M. (2016) · Proceedings of the ICECRS · doi:10.21070/picecrs.v1i1.585 · Cited by 10
Zainuddin, E., Bassellier, G., & Benbasat, I. (2010) · ACM SIGCPR Conference on Computer Personnel Research (SIGCPR) · doi:10.1145/1796900.1796933 · Cited by 10
ERP and functional fit: how integrated systems fail to provide improved control.
Carton, F., & Adam, F. (2008) · Arrow@dit (Dublin Institute of Technology) · Cited by 10
Risks of Data Science Projects - A Delphi Study
Varela, C. M., & Domingues, L. (2022) · Procedia Computer Science · doi:10.1016/j.procs.2021.12.100 · Cited by 10
Swar, B., Moon, J., & Khan, G. F. (2012) · International Journal of Services Technology and Management · doi:10.1504/ijstm.2012.048032 · Cited by 10
Fuzzy Logic Driven Expert System for the Assessment of Software Projects Risk
Ibraigheeth, M. A., & Abdullah, S. (2019) · International Journal of Advanced Computer Science and Applications · doi:10.14569/ijacsa.2019.0100220 · Cited by 10
Bouaynaya, W., Lyu, H., & Zhang, Z. (2018) · Sensors · doi:10.3390/s18103488 · Cited by 10
Alawneh, R., Jannoud, I., Rabayah, H. S., Imam, R., & Almasaeid, H. (2024) · Infrastructures · doi:10.3390/infrastructures9070117 · Cited by 10
Identification and Quantitative Analysis of Project Success Factors for Large Scale Projects
Shahzad, B., & Said, A. M. (2014) · International Journal of Knowledge Society Research · doi:10.4018/ijksr.2014010107 · Cited by 10
Analysis of project management issues in information technology industry: an overview of literature
Oak, V., & Laghate, K. (2016) · International Journal of Systems Assurance Engineering and Management · doi:10.1007/s13198-016-0469-4 · Cited by 10
Lehman, D. W. (2016) · Journal of Information Systems Applied Research and Analytics · Cited by 10
Resource Optimization-Based Software Risk Reduction Model for Large-Scale Application Development
Shahzad, B., Amin, F.-E., Abro, A., Imran, M. A., & Shoaib, M. (2021) · Sustainability · doi:10.3390/su13052602 · Cited by 10
IS development practice in New Zealand organisations
McLeod, L., MacDonell, S. G., & Doolin, B. (2009) · Tuwhera (Auckland University of Technology) · Cited by 10
Project Management: IS/IT Research Challenges
Tesch, D., Ireland, L. R., & Liu, J. Y.-C. (2008) · Journal of international technology and information management · doi:10.58729/1941-6679.1107 · Cited by 10
The Implications of E-Commerce for Software Project Risk: A Preliminary Investigation
Stevens, K. J., & Timbrell, G. (2003) · IFIP advances in information and communication technology · doi:10.1007/978-0-387-35692-1_19 · Cited by 10
The Missing Framework for Adaptation of Agile Software Development Projects
Suryaatmaja, K., Wibisono, D., & Ghazali, A. (2019) · Eurasian studies in business and economics · doi:10.1007/978-3-030-18652-4_9 · Cited by 9
Nazir, M. (2020) · Lahore Garrison University Research Journal of Computer Science and Information Technology · doi:10.54692/lgurjcsit.2020.0404105 · Cited by 9
Understanding the Enabling Design of IT Risk Management Processes
Wiesche, M., Schermann, M., & Krcmar, H. (2015) · AIS Electronic Library (AISeL) · Cited by 9
Firm Size and Different Behaviors in IT Investment Decisions
Shim, S., & Lee, B. (2010) · Management Science and Financial Engineering · Cited by 9
Liu, L. (2009) · Management Research News · doi:10.1108/01409170910943101 · Cited by 9
OPTIMISM BIAS IN MANAGING IT PROJECT RISKS: A CONSTRUAL LEVEL THEORY PERSPECTIVE
Shalev, E., Keil, M., Lee, J. S., & Ganzach, Y. (2014) · AIS Electronic Library (AISeL) · Cited by 9
Self-citationBao, C., Cai, M., Li, J., Zheng, Q., Wu, D., & Meng, Q. (2023) · Risk Analysis · doi:10.1111/risa.14253 · Cited by 9
Reducing User-Related Risks with User-Developer Partnering
Liu, J. Y.-C., Yang, M., Klein, G. L., & Chen, H. (2013) · Journal of Computer Information Systems · doi:10.1080/08874417.2013.11645672 · Cited by 9
Silva, P. A. L. D. S., Pires, S. M., Teles, F., Polido, A., & Rodrigues, C. (2022) · Urban Research & Practice · doi:10.1080/17535069.2022.2103447 · Cited by 9
Surprise and Suspense: How the Intelligence Community Forgot the Future
Alessa, L., Moon, S., Valentine, J., Marks, M., Hepburn, D., & Kliskey, A. D. (2021) · The International Journal of Intelligence Security and Public Affairs · doi:10.1080/23800992.2021.2006954 · Cited by 9
Costa, C. C., & da Cunha, P. R. (2009) · Lecture notes in business information processing · doi:10.1007/978-3-642-03132-8_5 · Cited by 9
Strachan, M. E. (2013) · Cited by 9
Information asymmetry in four IT projects : the client’s perspective a multiple case study
Wachnik, B. (2015) · Information Systems Management · Cited by 9
The Effectiveness of E-Learning: Academic And Business Comparison
Fayyoumi, A. (2009) · Turkish Online Journal of Distance Education · Cited by 9
Differences in Organizational Cultures - A Challenge for IT Projects
Lilja, K. (2013) · Tampere University Institutional Repository (Tampere University) · Cited by 9
An Empirical Study of Industry Practice in Software Development Risk Management
Sundararajan, S., Bhasi, M., & Pramod, K. V. (2013) · Cited by 9
Multicriteria Prioritization of Research Needs in Urban Green Stormwater Infrastructure
Ebrahimian, A., & Wadzuk, B. (2022) · Journal of Sustainable Water in the Built Environment · doi:10.1061/jswbay.0001001 · Cited by 9
Implementing and improving the SEI Risk Management method in a university software project
Esteves, J., Pastor, J., Rodriguez, N., & Roy, R. (2005) · IEEE Latin America Transactions · doi:10.1109/tla.2005.1468667 · Cited by 9
Bhusari, V., Monalisa, M., Khamis, R., Mirani, F., & Dash, P. (2007) · Portland International Conference on Management of Engineering and Technology (PICMET) · doi:10.1109/picmet.2007.4349458 · Cited by 9
A risk identification architecture pattern based on Bayesian network
Al-Rousan, T., Sulaiman, S., & Salam, R. A. (2008) · International Symposium on Information Technology · doi:10.1109/itsim.2008.4631857 · Cited by 9
IT Risks in Measure and Number
Kulk, G. P. (2009) · Digital Academic REpository of VU University Amsterdam (Vrije Universiteit Amsterdam) · Cited by 9
PERFORMANCE UNDER REQUIREMENTS UNCERTAINTY: A PERSONALITY PERSPECTIVE
Srinivasan, S. S. (2009) · AIS Electronic Library (AISeL) · Cited by 9
A new approach for software risk estimation
Bista, R., Karki, S., & Dongol, D. (2017) · International Conference on Software, Knowledge, Information Management and Applications (SKIMA) · doi:10.1109/skima.2017.8294099 · Cited by 9
Identifikasi Risiko Supply Chain dengan Mempertimbangkan Kepentingan Stakeholder pada Industri Gula
Rizqiah, E., & Karningsih, P. D. (2017) · PROZIMA (Productivity Optimization and Manufacturing System Engineering) · doi:10.21070/prozima.v1i2.1287 · Cited by 9
I.T. Project Success: Practical Frameworks Based on Key Project Control Variables
Koi-Akrofi, G. Y., Afful, E., & Matey, H. A. (2019) · International Journal of Software Engineering & Applications · doi:10.5121/ijsea.2019.10504 · Cited by 9
Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman
Zadjali, Z. A. A., Bashir, H. A., & Maqrashi, A. A. (2014) · International Journal of Information Technology Project Management · doi:10.4018/ijitpm.2014070105 · Cited by 9
A language proposition for system requirements
Lebeaupin, B., Rauzy, A. B., & Roussel, J.-M. (2017) · IEEE International Systems Conference (SysCon) · doi:10.1109/syscon.2017.7934808 · Cited by 9
Culturally Competent Common Core Practices: A Delphi Study
Sprott, K. (2014) · Journal of research initiatives · Cited by 9
Barriers to Mission-Critical Open Source Software Adoption by Organizations: A Provider Perspective
Poba‐Nzaou, P., & Uwizeyemungu, S. (2013) · Americas Conference on Information Systems · Cited by 9
Liu, D., Wang, Q., Xiao, J., Li, J., & Li, H. (2008) · Springer eBooks · doi:10.1007/978-3-540-79588-9_27 · Cited by 9
A framework for applying real options analysis to information technology investments
Chan, C. W. N., Cheng, C. H., Gunasekaran, A., & Wong, K. (2012) · International Journal of Industrial and Systems Engineering · doi:10.1504/ijise.2012.045181 · Cited by 9
Yavari, A., Golbaghi, M., & Momeni, H. (2013) · International Journal of Information Engineering and Electronic Business · doi:10.5815/ijieeb.2013.04.08 · Cited by 9
Evaristo, R., Audy, J. L. N., Prikladnicki, R., Pilatti, L., & Lopes, L. T. (2005) · Communications of the Association for Information Systems · doi:10.17705/1cais.01521 · Cited by 9
Addy, M. N., Akunyumu, S., & Simons, B. (2019) · Journal of Engineering Design and Technology · doi:10.1108/jedt-03-2019-0072 · Cited by 9
Ifinedo, P. (2005) · Journal of Information & Knowledge Management · doi:10.1142/s0219649205000979 · Cited by 9
DELPHI STRUCTURE AND GROUP SIZE IN ASYNCHRONOUS COMPUTER-MEDIATED COMMUNICATIONS
Cho, H.-K., & Turoff, M. (2003) · AIS Electronic Library (AISeL) · Cited by 9
Factors Influencing ERP Implementation in Australia
Dagher, J., & Kuzic, J. (2011) · Communications in computer and information science · doi:10.1007/978-3-642-22603-8_18 · Cited by 8
An empirical analysis of ERP implementation in a developing country: toward a generic framework
Aboelmaged, M. G. S. (2009) · International Journal of Enterprise Network Management · doi:10.1504/ijenm.2009.032482 · Cited by 8
Gierlich-Joas, M. (2021) · Lecture notes in information systems and organisation · doi:10.1007/978-3-030-86800-0_38 · Cited by 8
Manda, T. D., & Sanner, T. A. (2012) · Cited by 8
Continuous Requirements Risk Profiling in Information Systems Development
Tuunanen, T., Vartiainen, T., Ebrahim, M., & Liang, M. (2015) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2015.483 · Cited by 8
Costa, C. J. D. C. (2019) · doi:10.21428/544e68e8.e4468a76 · Cited by 8
Modeling Team Dynamics for the Characterization and Prediction of Delays in User Stories
Kula, E., van Deursen, A., & Gousios, G. (2021) · IEEE/ACM International Conference on Automated Software Engineering (ASE) · doi:10.1109/ase51524.2021.9678939 · Cited by 8
Doherty, M. J. (2011) · ScholarWorks (Walden University) · Cited by 8
Sponsorship and it Vendor Management of Projects
Liu, L., & Yetton, P. (2009) · Journal of Information Technology · doi:10.1057/jit.2009.2 · Cited by 8
Unraveling the airline value creation network with fuzzy cognitive maps
Navarro-Meneses, F. J. (2022) · International Journal of Engineering Business Management · doi:10.1177/18479790221124641 · Cited by 8
Purvis, R. L., Henry, R. M., Tams, S., Grover, V., McGregor, J. D., & Davis, S. (2016) · Project Management Journal · doi:10.1177/875697281604700405 · Cited by 8
Adriani, Z. A., Raharjo, T., & Trisnawaty, N. W. (2024) · Indonesian Journal of Computer Science · doi:10.33022/ijcs.v13i3.4016 · Cited by 8
Antecedents of project managers turnover intention: Psychological distress as mediator
Chughtai, R., & Islam, S. U. (2019) · Journal of administrative and business studies · doi:10.20474/jabs-5.6.1 · Cited by 8
Influential Factors on IS Project Quality: A Total Quality Management Perspective
Glowalla, P., & Sunyaev, A. (2015) · International Conference on Information Systems · Cited by 8
The Emergence of Information Infrastructure Risk Management in IT Services
Öbrand, L., Augustsson, N., Holmström, J., & Mathiassen, L. (2012) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2012.565 · Cited by 8
Information Systems Flexibility in Organizations: Conceptual Models and Research Issues
Palanisamy, R. (2013) · Flexible systems management · doi:10.1007/978-81-322-1560-8_16 · Cited by 8
Bernard, J.-G., Rivard, S., & Aubert, B. A. (2016) · Systèmes d information & management · doi:10.3917/sim.162.0089 · Cited by 8
Holtkamp, P. (2015) · Jyväskylä University Digital Archive (University of Jyväskylä) · Cited by 8
An Example of Relevant IS Research for Top Managers on IT Project Failure
Young, R. (2005) · AIS Electronic Library (AISeL) · Cited by 8
A risk assessment model for collaborative support in software management
Anthony, B., Pa, N. C., Nor, R. N. H., & Jusoh, Y. Y. (2015) · Malaysian Software Engineering Conference (MySEC) · doi:10.1109/mysec.2015.7475224 · Cited by 8
The Underlying Complexities Impacting Accelerator Decision Making—A Combined Methodological Analysis
Donne, K., Hughes, D. L., Williams, M. D., & Davies, G. H. (2021) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2020.3041558 · Cited by 8
Frameworks for risk management in GSD projects: A survey
Chadli, S. Y., Idri, A., Fernández‐Alemán, J. L., & Nicolás, J. (2015) · International Conference on Intelligent Systems: Theories and Applications · doi:10.1109/sita.2015.7358381 · Cited by 8
Fowler, J. J. (2009) · Advances in end user computing series/Advances in end user computing (AEUC) book series · doi:10.4018/978-1-60566-136-0.ch001 · Cited by 8
Mitigating Software Maintenance Project Risks with Stepwise Regression Analysis Techniques
Elzamly, A., & Hussin, B. (2014) · Journal of modern mathematics frontier · doi:10.14355/jmmf.2014.0302.02 · Cited by 8
Elzamly (2014) · Journal of Computer Science · doi:10.3844/jcssp.2014.1725.1742 · Cited by 8
Emergency Medical Services Core Competencies: A Delphi Study
Alshammari, T., Jennings, P., & Williams, B. A. (2019) · Australasian Journal of Paramedicine · doi:10.33151/ajp.16.688 · Cited by 8
Systematic Review of Risks in Domestic and Global IT Projects
Silveira, F. F., Russo, R. D. F. S. M., Júnior, I. G., & Sbragia, R. (2017) · Journal of Global Information Management · doi:10.4018/jgim.2018010102 · Cited by 8
Identifying Vendor Risks In Remote Infrastructure Management Services
Mathew, S. K., & Aundhe, M. D. (2011) · Journal of Information Technology Case and Application Research · doi:10.1080/15228053.2011.10856216 · Cited by 8
IT Operating Models in Practice and Research: An Analysis of the State of Knowledge
Thorogood, A., Gewald, H., & Brüne, P. (2012) · Pacific Asia Conference on Information Systems · Cited by 8
Kirk, D., Luxton-Reilly, A., & Tempero, E. D. (2022) · Australasian Computing Education Conference · doi:10.1145/3511861.3511877 · Cited by 8
DEVELOPING USABLE SOFTWARE PRODUCT USING USABILITY RISK ASSESSMENT MODEL
Moorthy, J. T. S., & The Society of Digital Information and Wireless Communication (2014) · International Journal of Digital Information and Wireless Communications · doi:10.17781/p001088 · Cited by 8
Metadata
- Authors
- Schmidt, R., Lyytinen, K., Keil, M., & Cule, P.
- Venue
- Journal of Management Information Systems
- Publisher
- Informa UK Limited
- Published
- 2001-03
- Volume
- 17
- Issue
- 4
- Pages
- 5-36
- ISSN
- 0742-1222 (ISSN-L)
- 1557-928X
- OpenAlex
- W2102044943
- Cited by
- 1,252
- References
- 32
- FWCI
- 64.03
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.