Application of lean visual process management tools
Open accessThe DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Abstract
Visual process management tools have been developed by lean practitioners as communication aids and are used to help drive operations and processes in real time. Three case studies from aerospace companies describe the physical visual tools that have been implemented to facilitate performance measurement and communication in different engineering processes. Rolls Royce presents an example of how ERP outputs are communicated and controlled in a lean manufacturing process. At Airbus UK (Filton) visual process boards are used to manage a complex knowledge and people based process bringing together multiple supplier inputs in the production of aircraft maintenance manuals. Senior management at Weston Aerospace are using visual process control to run and report on work packages, resources and processes throughout their organisation. These systems act as an extension to metrics, and in themselves may be considered as a dynamic measurement system as they provide instant feedback and can be used to predict a probable outcome if no action is taken. The learning and themes that have made these implementations successful is presented and collated into a set of guidelines for consideration when implementing visual process management tools.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1994) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(94)92216-0 · Cited by 45,910
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)91697-o · Cited by 18,154
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717 · cited 1×
“After the publication of The Machine that Changed the World (Womack et al. 1990) principles such as the Toyota Production System (TPS) (Ohno 1988) have driven the change from mass production to lean production in the Western world.”
MethodToyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality
Wheelwright, S. C., & Clark, K. B. (1992) · Cited by 3,342
Restoring Our Competitive Edge: Competing through Manufacturing.
Thomas, L. J., Hayes, R. H., & Wheelwright, S. C. (1985) · Administrative Science Quarterly · doi:10.2307/2393118 · Cited by 2,212
Ziegel, E. R., Kaplan, R., & Norton, D. (1998) · Technometrics · doi:10.2307/1271199 · Cited by 2,187
Slack, N., Chambers, S., & Johnston, R. B. (2010) · doi:10.82444/warw.33661327 · Cited by 1,792
The performance measurement revolution: why now and what next?
Neely, A. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247437 · Cited by 1,154 · cited 1×
“( 1999 ) and O’Donnell ( 2002 ) link metrics to the measurement of efficiency and effectiveness of an action, with Slack et al.”
BackgroundRevolutionizing product development
Wheelwright, S. C. (1992) · Cited by 1,061
Manufacturing Strategy : Text and Cases
Hill, T. E., & Hill, A. (1994) · Cited by 1,031
Restoring our Competitive Edge: Competing through Manufacturing
Feldman, H. D. (1985) · American Journal of Small Business · doi:10.1177/104225878501000108 · Cited by 935 · cited 2×
“However, financial accounting measures can give misleading signals, and they cannot drive activities like continuous improvement or innovation for a company to gain a competitive edge (Kaplan and Norton 1992 ); not to mention that these measures implicitly assume that the lessons learned from studying the past outcome…”
BackgroundMethodOperations Management for Competitive Advantage
Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2000) · Cited by 697
Managing in a Time of Great Change
Drucker, P. (2012) · Routledge eBooks · doi:10.4324/9780080938752 · Cited by 686
(2009) · Cited by 671
Toyota Production System: Practical Approach to Production Management
Monden, Y. (1983) · Cited by 612
Squaring lean supply with supply chain management
Lamming, R. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109910 · Cited by 481 · cited 1×
“Lamming (1996) suggests that a truly lean system may lack the flexibility necessary for it to function in a competitive business world, for instance, providing no extra time and space to think and experiment respectively.”
BackgroundMetrics and performance measurement in operations management: dealing with the metrics maze
Melnyk, S. A., Stewart, D. M., & Swink, M. (2004) · Journal of Operations Management · doi:10.1016/j.jom.2004.01.004 · Cited by 452 · cited 1×
“Generally, financial accounting measures are regarded as ‘outcome oriented’ or ‘results focused’, which define the significant elements in terms of monetary resource equivalents (Melnyk et al. 2004).”
BackgroundMoody, K. (1997) · Cited by 422
How the right measures help teams excel
Meyer, C. (1994) · Harvard business review · Cited by 311
Rethinking performance measurement: beyond the balanced scorecard
(2003) · Choice Reviews Online · doi:10.5860/choice.41-0409 · Cited by 209
Performance Measurement for World Class Manufacturing: A Model for American Companies
Maskell, B. H. (2013) · Productivity Press eBooks · doi:10.1201/b16424 · Cited by 154 · cited 3×
“Maskell (1991) studied the performance measures of world class manufacturing (WCM) companies, and summarised key characteristics as: . a direct relationship to manufacturing strategy; . non-financial measures are incorporated; . different measurements for different areas of a company; . simple,…”
DeBusk, G. K., Brown, R. M., & Killough, L. N. (2003) · The British Accounting Review · doi:10.1016/s0890-8389(03)00026-x · Cited by 145 · cited 1×
“…report the current state of their production, service provision and/or processes, usually a computer displayed set of graphical outputs of metrics, financial ratios or key performance indicators (KPIs), perhaps from an ERP system (Kaplan and Norton 1992, DeBusk et al. 2003, McGovern et al. 2004).”
BackgroundBringing customers into the boardroom.
McGovern, G., Court, D., Quelch, J. A., & Crawford, B. (2004) · PubMed · Cited by 104
Modelling design development performance
O’Donnell, F. J., & Duffy, A. H. B. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450301 · Cited by 88 · cited 2×
“Neely et al. (1999) and O’Donnell (2002) link metrics to the measurement of efficiency and effectiveness of an action, with Slack et al. (1995) providing the simplest definition of performance measurement: to assess the degree of improvement.”
BackgroundVisual factory: Basic principles and the 'zoning' approach
Bilalis, N., Scroubelos, G., Antoniadis, A., Emiris, D. M., & Koulouriotis, D. E. (2002) · International Journal of Production Research · doi:10.1080/00207540210140031 · Cited by 57 · cited 3×
“Information availability is usually not the problem; it is the communication of this information which seems to be ineffective (Bilalis et al. 2002).”
BackgroundMethodInfluentialThe appropriate use of performance measurement in non‐production activity
Busby, J. S., & Williamson, A. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010308103 · Cited by 28 · cited 2×
“…control systems enable companies to move towards the world class characteristics of performance measurement proposed by Maskell (1991), fulfil the guiding principles of Meyer (1994) and in doing so address the limitations identified by Dimancescu and Dwenger (1996) and Busby and Williamson (2000).”
Background
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Blockchain: case studies in food supply chain visibility
Rogerson, M., & Parry, G. C. (2020) · Supply Chain Management: An International Journal · doi:10.1108/scm-08-2019-0300 · Cited by 411
Self-citationFullerton, R. R., Kennedy, F. A., & Widener, S. K. (2014) · Journal of Operations Management · doi:10.1016/j.jom.2014.09.002 · Cited by 407
Núñez-Merino, M., Maqueira-Marín, J. M., Moyano-Fuentes, J., & Martínez-Jurado, P. J. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1743896 · Cited by 382
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Metadata
- Authors
- Parry, G. C., & Turner, C. E.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2006-01
- Volume
- 17
- Issue
- 1
- Pages
- 77-86
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W2099314076
- Cited by
- 219
- References
- 29
- FWCI
- 9.37
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.