CoChat

Application of value stream mapping for lean operations and cycle time reduction: an Indian case study

Seth *, Dinesh, Gupta, Vaibhav · 2005 · Production Planning & Control
Cited by 348

The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.

Abstract

For the last few years almost every manufacturing industry has been trying to get ‘lean’. A headlong rush to offer value to the customers by becoming lean and responsive has created an urgency for researchers and practitioners to apply new tools and techniques to address various wastes. The process of mapping the material and information flows of all components and sub-assemblies in a value stream that includes manufacturing, suppliers and distribution to the customer is known as value stream mapping (VSM). VSM has proved effective in identifying and eliminating wastes in a facility with similar or identical product routings, such as in assembly facilities. In this paper, an attempt has been made to use VSM as a technique to achieve productivity improvement at supplier end for an auto industry. Both current and future (‘as is’ and ‘to be’) states of supplier shopfloor scenarios are discussed using value stream concepts. This is analysed along with takt time calculations and the application of other gap areas. Finally, gain in production output per person, reduction of work in process and finished goods inventory affecting productivity are also reported.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/09537280512331325281

Cites

26 of 26 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Cited by

See all 348

Metadata

Authors
Seth *, D., & Gupta, V.
Venue
Production Planning & Control
Published
2005-01
Volume
16
Issue
1
Pages
44-59
ISSN
  • 0953-7287 (ISSN-L)
  • 1366-5871
OpenAlex
W2118621402
Cited by
348
References
26
FWCI
7.23
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.