Application of value stream mapping for lean operations and cycle time reduction: an Indian case study
The DOI matches its Crossref record; 26 of the 26 references it cites were found in a registry or an index.
Abstract
For the last few years almost every manufacturing industry has been trying to get ‘lean’. A headlong rush to offer value to the customers by becoming lean and responsive has created an urgency for researchers and practitioners to apply new tools and techniques to address various wastes. The process of mapping the material and information flows of all components and sub-assemblies in a value stream that includes manufacturing, suppliers and distribution to the customer is known as value stream mapping (VSM). VSM has proved effective in identifying and eliminating wastes in a facility with similar or identical product routings, such as in assembly facilities. In this paper, an attempt has been made to use VSM as a technique to achieve productivity improvement at supplier end for an auto industry. Both current and future (‘as is’ and ‘to be’) states of supplier shopfloor scenarios are discussed using value stream concepts. This is analysed along with takt time calculations and the application of other gap areas. Finally, gain in production output per person, reduction of work in process and finished goods inventory affecting productivity are also reported.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)91697-o · Cited by 18,154
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Stalk, G., & Hout, T. M. (1990) · Research-Technology Management · doi:10.1080/08956308.1990.11670646 · Cited by 1,269
Supply Chain Management: Relationships, Chains and Networks
Harland, C. M. (1996) · British Journal of Management · doi:10.1111/j.1467-8551.1996.tb00148.x · Cited by 1,065
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
Prices, quality and trust: Inter—firm relations in Britain and Japan
Sako, M. (1992) · Cambridge University Press eBooks · doi:10.1017/cbo9780511520723 · Cited by 1,030
Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity
Mitchell, P. S., & Schonberger, R. J. (1983) · The Academy of Management Review · doi:10.2307/257841 · Cited by 976
The seven value stream mapping tools
Hines, P., & Rich, N. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710157989 · Cited by 944
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
The impact of lean methods and tools on the operational performance of manufacturing organisations
Belekoukias, I., Garza-Reyes, J. A., & Kumar, V. (2014) · International Journal of Production Research · doi:10.1080/00207543.2014.903348 · Cited by 474
“Various studies have highlighted the positive effects of VSM in different operational areas (Seth and Gupta, 2005; Abdulmalek and Rajgopal, 2007; Sahoo et al., 2008; Singh and Sharma, 2009; Chen et al., 2010).”
BackgroundInfluentialTortorella, G. L., Giglio, R., & van Dun, D. H. (2019) · International Journal of Operations & Production Management · doi:10.1108/ijopm-01-2019-0005 · Cited by 444
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Implementing lean production systems: research areas and opportunities for future studies
Marodin, G. A., & Saurin, T. A. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.826831 · Cited by 328
Chiarini, A., & Kumar, M. (2021) · Production Planning & Control · doi:10.1080/09537287.2020.1784485 · Cited by 315
Industry 4.0 and lean management: a proposed integration model and research propositions
Sony, M. (2018) · Production & Manufacturing Research · doi:10.1080/21693277.2018.1540949 · Cited by 310
Value stream mapping to reduce the lead-time of a product development process
Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.11.002 · Cited by 296
Helleno, A. L., de Moraes, A. J. I., & Simon, A. T. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.12.072 · Cited by 273
Chiarini, A., Belvedere, V., & Grando, A. (2020) · Production Planning & Control · doi:10.1080/09537287.2019.1710304 · Cited by 239
A literature review of lean manufacturing
Gupta, S., & Jain, S. K. (2013) · International Journal of Management Science and Engineering Management · doi:10.1080/17509653.2013.825074 · Cited by 228
“Lean manufacturing when implemented successfully results in an increase in production output per person and a reduction in the finished goods inventory and work in process (Seth & Gupta, 2005).”
BackgroundLean implementation and its benefits to production industry
Singh, B., Garg, S. K., Sharma, S. K., & Grewal, C. (2010) · International Journal of Lean Six Sigma · doi:10.1108/20401461011049520 · Cited by 223
Tools and techniques for enabling sustainability through lean initiatives
Vinodh, S., Arvind, K. R., & Somanaathan, M. (2011) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-010-0329-x · Cited by 219
“Some of the examples of waste reduction include the reduction of process defects, low inventory, and less scrap (McDonald et al. 2002; Seth and Gupta 2005 ).”
BackgroundAdapting lean manufacturing principles to the textile industry
Hodge, G. L., Goforth Ross, K., Joines, J. A., & Thoney, K. (2011) · Production Planning & Control · doi:10.1080/09537287.2010.498577 · Cited by 218
“Seth and Gupta ( 2005 ) present a case study of VSM as applied to an Indian automotive manufacturer showing both current-state and future-state maps.”
BackgroundChoudhary, S., Nayak, R., Dora, M., Mishra, N., & Ghadge, A. (2019) · Production Planning & Control · doi:10.1080/09537287.2018.1501811 · Cited by 215
Lean manufacturing performance in Indian manufacturing plants
Ghosh, M. (2012) · Journal of Manufacturing Technology Management · doi:10.1108/17410381311287517 · Cited by 201
Value stream mapping: literature review and implications for Indian industry
Singh, B., Garg, S. K., & Sharma, S. K. (2011) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-010-2860-7 · Cited by 194
“Current state map is prepared keeping in view of the lean manufacturing principles as discussed by [33, 38 ].”
MethodRehman, M. A., Seth, D., & Shrivastava, R. L. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.07.106 · Cited by 192
Self-citationSeth, D., Seth, N., & Dhariwal, P. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1300352 · Cited by 185
“Thus it offers ‘reflection of systemic vision maintaining local details of process’ by diagrammatically linking material-flow, information-flow and timeline (Seth and Gupta 2005).”
BackgroundSelf-citationStructural Equation Modelling of lean manufacturing practices
Vinodh, S., & Joy, D. (2012) · International Journal of Production Research · doi:10.1080/00207543.2011.560203 · Cited by 182
“Lean manufacturing has its focus on cost reduction, waste minimisation and better material management (Seth and Gupta 2005 ).”
BackgroundDesign of lean manufacturing systems using value stream mapping with simulation: A case study
Gurumurthy, A., & Kodali, R. (2011) · Journal of Manufacturing Technology Management · doi:10.1108/17410381111126409 · Cited by 181
A literature review of empirical research methodology in lean manufacturing
Vamsi Krishna Jasti, N., & Kodali, R. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-04-2012-0169 · Cited by 178
Critical success factors for Lean Six Sigma in SMEs (small and medium enterprises)
Lande, M., Shrivastava, R. L., & Seth, D. (2016) · The TQM Journal · doi:10.1108/tqm-12-2014-0107 · Cited by 170
Self-citationLean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
Selection of lean manufacturing systems using the PROMETHEE
Anand, G., & Kodali, R. (2008) · Journal of Modelling in Management · doi:10.1108/17465660810860372 · Cited by 163
Lacerda, A. P., Xambre, A. R., & Alvelos, H. M. (2016) · International Journal of Production Research · doi:10.1080/00207543.2015.1055349 · Cited by 162
“Recent studies and relevant literature suggests the use of lean metrics like Lead Time, Value Added Time, Cycle Time and Takt Time when applying the VSM tool (Rother and Shook 2003; Seth and Gupta 2005; Abdulmalek and Rajgopal 2007; Duggan 2013; Surekha, Praveena Gowda, and Kulkarni 2013).”
MethodSeth, D., Seth, N., & Goel, D. (2008) · Journal of Manufacturing Technology Management · doi:10.1108/17410380810869950 · Cited by 159
“Recently, there exists a plethora of different tools and techniques developed for different purposes and waste reduction or elimination ( Seth and Gupta, 2005”
MethodSelf-citationA new value stream mapping approach for healthcare environments
Henrique, D. B., Rentes, A. F., Godinho Filho, M., & Esposto, K. F. (2016) · Production Planning & Control · doi:10.1080/09537287.2015.1051159 · Cited by 148
“Seth and Gupta (2005) define VSM as the process of mapping the material and information flows of all components and sub-assemblies in a value stream that include manufacturing, suppliers and distribution to the customers.”
BackgroundSingh, B., & Sharma, S. K. (2009) · Measuring Business Excellence · doi:10.1108/13683040910984338 · Cited by 133
Goshime, Y., Kitaw, D., & Jilcha, K. (2019) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-06-2017-0063 · Cited by 112
Parthanadee, P., & Buddhakulsomsiri, J. (2014) · Production Planning & Control · doi:10.1080/09537287.2012.702866 · Cited by 61
“Benefits gained from using VSM to promote the lean implementation are well supported in Seth and Gupta ( 2005 ), Serrano Lasa et al.”
Redesigning an assembly line through Lean-Kaizen: an Indian case
Prashar, A. (2014) · The TQM Journal · doi:10.1108/tqm-04-2013-0054 · Cited by 40
Khaba, S., & Bhar, C. (2018) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-02-2017-0024 · Cited by 33
El-Khalil, R. (2022) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-10-2017-0118 · Cited by 29
Metadata
- Authors
- Seth *, D., & Gupta, V.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2005-01
- Volume
- 16
- Issue
- 1
- Pages
- 44-59
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W2118621402
- Cited by
- 348
- References
- 26
- FWCI
- 7.23
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.