Understanding Construction Supply Chain Management
The DOI matches its Crossref record; 50 of the 50 references it cites were found in a registry or an index.
Abstract
The purpose of this study was to understand some of the many perplexing questions eluding managers of overwhelmingly complex construction supply chain management (CSCM) based on review of some important research issues pertaining to construction supply chains. This study has illustrated understanding on CSCM using qualitative approach of triangulation applying foundational research methodology and soft system methodology in a coal-based thermal power plant project to validate its complex CSCM systems. The study highlights that a typical CSCM eco-system for the coal-based thermal power plant construction as unit can be considered to operate as a system with sub-systems as concept phase, procurement phase, production phase, installation phase and winding up phase. This study suffers from methodological limitations associated with qualitative research. Finally, this study provides practical insights for research opportunities in the area of interdisciplinary construction projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1994) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(94)92216-0 · Cited by 45,910
Basics of Qualitative Research: Grounded Theory Procedures and Techniques.
Ellis, C., Strauss, A., & Corbin, J. (1992) · Contemporary Sociology · doi:10.2307/2074814 · Cited by 29,249
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)91697-o · Cited by 18,154
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
Understanding Reliability and Validity in Qualitative Research
Golafshani, N. (2015) · The Qualitative Report · doi:10.46743/2160-3715/2003.1870 · Cited by 5,157
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Two Decades of Developments in Qualitative Inquiry: A Personal, Experiential Perspective
Patton, M. Q. (2002) · Qualitative Social Work · doi:10.1177/1473325002001003636 · Cited by 2,564
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Designing and managing the supply chain : concepts, strategies, and case studies
Simchi‐Levi, D., Kaminsky, P., & Simchi‐Levi, E. (2000) · Cited by 2,204
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180 · cited 1×
“Kaplan and Norton (1992, 1993) introduced the concept of a balanced scorecard (BSC) that received broad attention not only in scientific literature but also in practical applications.”
BackgroundInternational Journal of Physical Sciences
(2025) · International Journal of the Physical Sciences · doi:10.5897/ijps · Cited by 1,932
Designing and Managing the Supply Chain Concepts, Strategies, and Case Studies
(2000) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm.2000.17.7.812.1 · Cited by 1,298
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 3×
“…Ng 2003), temporary multiple organisation (Aloini et al. 2012), change inertia (Palaneeswaran, Kumaraswamy, and Ng 2003), make-to-order supply chain (Vrijhoef and Koskela 2000), collaborative opportunities (Akintoye, McIntosh, and Fitzgerald 2000) and cyclical demand (Akintoye, McIntosh, and…”
BackgroundA review and analysis of supply chain operations reference (SCOR) model
Huan, S. H., Sheoran, S. K., & Wang, G. (2004) · Supply Chain Management An International Journal · doi:10.1108/13598540410517557 · Cited by 798 · cited 1×
“…analysing and configuring supply chains with standardised terminology for the purpose of benchmarking of processes and the extraction of best practices from certain processes, but it does not provide methodology for optimisation (Huan, Sheoran, and Wang 2004; Thunberg and Persson 2013).”
BackgroundCheckland, P. B., & Poulter, J. (2007) · Lancaster EPrints (Lancaster University) · Cited by 731
Checkland, P., & Poulter, J. (2010) · Systems Approaches to Managing Change: A Practical Guide · doi:10.1007/978-1-84882-809-4_5 · Cited by 722
The Supply Chain Management Processes
Croxton, K. L., García-Dastugue, S. J., Lambert, D. M., & Rogers, D. S. (2001) · The International Journal of Logistics Management · doi:10.1108/09574090110806271 · Cited by 702 · cited 1×
“Each process runs cross-functionally, cutting through functional silos within each organisation (Croxton et al. 2001).”
BackgroundSupply-Chain Management: Logistics Catches up with Strategy
Oliver, R. K., & Webber, M. D. (2012) · Springer eBooks · doi:10.1007/978-3-642-27922-5_15 · Cited by 699 · cited 1×
“Research into integration and coordination of different functional units in an organisation started much earlier than the creation of phrase ‘Supply Chain Management (SCM)’ in 1982 (Oliver and Webber 1982).”
BackgroundA survey of supply chain collaboration and management in the UK construction industry
Akintoye, A., McIntosh, G., & Fitzgerald, E. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00012-5 · Cited by 549 · cited 1×
“…multiple organisation (Aloini et al. 2012), change inertia (Palaneeswaran, Kumaraswamy, and Ng 2003), make-to-order supply chain (Vrijhoef and Koskela 2000), collaborative opportunities (Akintoye, McIntosh, and Fitzgerald 2000) and cyclical demand (Akintoye, McIntosh, and Fitzgerald 2000).”
BackgroundKey influences on construction innovation
Blayse, A. M., & Manley, K. (2004) · Construction Innovation · doi:10.1108/14714170410815060 · Cited by 527
Risk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468 · cited 1×
“…(CSC 08) Green, Fernie, and Weller 2005; (CSC 09) Karim, Marosszeky, and Davis 2006; (CSC 10) Xue et al. 2007; (CSC 11) Harty et al. 2007; (CSC 12) El-Sayegh 2008; (CSC 13) Albaloushi and Skitmore 2008; (CSC 14) Arif et al. 2009; (CSC 15) Delgado-Hernandez and Aspinwall 2010; (CSC 16) Meng, Sun,…”
Performance Measurement in Construction
Bassioni, H. A., Price, A. D. F., & Hassan, T. M. (2004) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2004)20:2(42 · Cited by 383 · cited 2×
“Little attention has been paid to supply chain economics and developing positive models, which are inductive and aim to describe what currently exists (Ali et al. 2010; Bassioni, Price, and Hassan 2004).”
BackgroundSupply chain management 1982–2015: a review
Asgari, N., Nikbakhsh, E., Hill, A., & Farahani, R. Z. (2016) · IMA Journal of Management Mathematics · doi:10.1093/imaman/dpw004 · Cited by 378
New perspectives on construction supply chain integration
Dainty, A. R. J., Millett, S. J., & Briscoe, G. H. (2001) · Supply Chain Management: An International Journal · doi:10.1108/13598540110402700 · Cited by 343 · cited 1×
“…scenario and analyse them for suitability/need for modification in the current context, namely, (CSC 01) Vrijhoef and Koskela 2000; (CSC 02) Dainty, Millett, and Briscoe 2001; (CSC 03) London and Kenley 2001; (CSC 04) Cox and Ireland 2002; (CSC 05) Barlow et al. 2003; (CSC 06)…”
BackgroundPutting supply chain learning into practice
Bessant, J., Kaplinsky, R., & Lamming, R. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310458438 · Cited by 327
Subcontractor perspectives on supply chain alliances
Dainty, A. R. J., Briscoe, G. H., & Millett, S. J. (2001) · Construction Management and Economics · doi:10.1080/01446190110089727 · Cited by 291 · cited 1×
“The CSC has been seen to be characterised by customer influence (Vrijhoef and Koskela 2000), fragmentation (Albaloushi and Skitmore 2008; Dainty, Briscoe, and Millett 2001; O’Brien 1999), number and type of stakeholders (Xue et al. 2007), buyer–supplier relationship (Cox and Ireland 2002;…”
BackgroundCheckland, P. B. (1989) · Human Systems Management · doi:10.3233/hsm-1989-8405 · Cited by 258
A service oriented framework for construction supply chain integration
Cheng, J. C. P., Law, K. H., Bjornsson, H., Jones, A., & Sriram, R. (2010) · Automation in Construction · doi:10.1016/j.autcon.2009.10.003 · Cited by 227
Supply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223
Questioning and Teaching: A Manual of Practice
Dillon, J. T. (1988) · Medical Entomology and Zoology · Cited by 222
Greening the construction supply chain in Singapore
Ofori, G. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00015-0 · Cited by 222
Kazaz, A., Manisali, E., & Ulubeyli, S. (2008) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/1392-3730.2008.14.4 · Cited by 221
Enhancing integration and innovation in construction
Dulaimi, M. F., Y.Ling, F. Y., Ofori, G., & Silva, N. D. (2002) · Building Research & Information · doi:10.1080/09613210110115207 · Cited by 215
Managing construction supply chains: the common sense approach
Cox, A., & Ireland, P. (2002) · Engineering Construction and Architectural Management · doi:10.1046/j.1365-232x.2002.00273.x · Cited by 199
A framework to improve construction processes: Integrating Lean, Green and Six Sigma
Banawi, A., & Bilec, M. M. (2014) · International Journal of Construction Management · doi:10.1080/15623599.2013.875266 · Cited by 184 · cited 1×
“…2008; (CSC 13) Albaloushi and Skitmore 2008; (CSC 14) Arif et al. 2009; (CSC 15) Delgado-Hernandez and Aspinwall 2010; (CSC 16) Meng, Sun, and Jones 2011; (CSC 17) Mokhlesian and Holmén 2012; (CSC 18) Doloi, Sawhney, and Iyer 2012; (CSC 19) Larsen and Whyte 2013; and (CSC 20) Banawi and Bilec 2014.”
BackgroundAnalysing supply chain performance using a balanced measurement method
Bullinger, H., Kühner, M., & van Hoof, A. (2002) · International Journal of Production Research · doi:10.1080/00207540210161669 · Cited by 177
An industrial organization economic supply chain approach for the construction industry: a review
London, K. A., & Kenley, R. (2001) · Construction Management and Economics · doi:10.1080/01446190110081699 · Cited by 174 · cited 2×
“The literature on SCM indicates that the research tends to fall within four main streams, namely, distribution, production, strategic procurement and industrial organisational economics (London and Kenley 2001).”
BackgroundStructural equation model for investigating factors affecting delay in Indian construction projects
Doloi, H. K., Sawhney, A., & Iyer, K. C. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.717705 · Cited by 170 · cited 1×
“…2008; (CSC 13) Albaloushi and Skitmore 2008; (CSC 14) Arif et al. 2009; (CSC 15) Delgado-Hernandez and Aspinwall 2010; (CSC 16) Meng, Sun, and Jones 2011; (CSC 17) Mokhlesian and Holmén 2012; (CSC 18) Doloi, Sawhney, and Iyer 2012; (CSC 19) Larsen and Whyte 2013; and (CSC 20) Banawi and Bilec 2014.”
BackgroundBusiness model changes and green construction processes
Mokhlesian, S., & Holmén, M. (2012) · Construction Management and Economics · doi:10.1080/01446193.2012.694457 · Cited by 133 · cited 1×
“…2008; (CSC 13) Albaloushi and Skitmore 2008; (CSC 14) Arif et al. 2009; (CSC 15) Delgado-Hernandez and Aspinwall 2010; (CSC 16) Meng, Sun, and Jones 2011; (CSC 17) Mokhlesian and Holmén 2012; (CSC 18) Doloi, Sawhney, and Iyer 2012; (CSC 19) Larsen and Whyte 2013; and (CSC 20) Banawi and Bilec 2014.”
BackgroundPrakash, A., & Mohanty, R. P. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.643929 · Cited by 133 · cited 1×
“There appears a substantial body of literature available on use of questions in various fields of practice for building credible standards where de facto standards are not available (see, for example, Lakhe and Mohanty 1994; Prakash and Mohanty 2013, 2014).”
BackgroundSelf-citationThe futures of construction: a critical review of construction future studies
Harty, C. F., Goodier, C. I., Soetanto, R., Austin, S. A., Dainty, A., & Price, A. D. F. (2007) · Construction Management and Economics · doi:10.1080/01446190600879117 · Cited by 110 · cited 1×
“…Price, and Hassan 2004; (CSC 08) Green, Fernie, and Weller 2005; (CSC 09) Karim, Marosszeky, and Davis 2006; (CSC 10) Xue et al. 2007; (CSC 11) Harty et al. 2007; (CSC 12) El-Sayegh 2008; (CSC 13) Albaloushi and Skitmore 2008; (CSC 14) Arif et al. 2009; (CSC 15) Delgado-Hernandez and…”
Managing subcontractor supply chain for quality in construction
Karim, K., Marosszeky, M., & Davis, S. (2006) · Engineering Construction & Architectural Management · doi:10.1108/09699980610646485 · Cited by 108 · cited 1×
“…2003; (CSC 06) Palaneeswaran, Kumaraswamy, and Ng 2003; (CSC 07) Bassioni, Price, and Hassan 2004; (CSC 08) Green, Fernie, and Weller 2005; (CSC 09) Karim, Marosszeky, and Davis 2006; (CSC 10) Xue et al. 2007; (CSC 11) Harty et al. 2007; (CSC 12) El-Sayegh 2008; (CSC 13) Albaloushi and Skitmore…”
Soni, G., & Kodali, R. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.642207 · Cited by 80 · cited 1×
“Moreover, there can be no validity without reliability, a demonstration of the former [validity] is sufficient to establish the latter [reliability] (Soni and Kodali 2012).”
BackgroundUsing the SCOR model’s performance measurements to improve construction logistics
Thunberg, M., & Persson, F. (2013) · Production Planning & Control · doi:10.1080/09537287.2013.808836 · Cited by 77
State of green construction in India: drivers and challenges
Arif, M., Egbu, C., Haleem, A., Kulonda, D. J., & Khalfan, M. M. A. (2009) · Journal of Engineering Design and Technology · doi:10.1108/17260530910975005 · Cited by 73 · cited 1×
“…and Davis 2006; (CSC 10) Xue et al. 2007; (CSC 11) Harty et al. 2007; (CSC 12) El-Sayegh 2008; (CSC 13) Albaloushi and Skitmore 2008; (CSC 14) Arif et al. 2009; (CSC 15) Delgado-Hernandez and Aspinwall 2010; (CSC 16) Meng, Sun, and Jones 2011; (CSC 17) Mokhlesian and Holmén 2012; (CSC 18)…”
Research in the Sociology of Organizations
(2014) · Research in the sociology of organizations · doi:10.1108/rso · Cited by 59
Triangulating philosophies of science to understand complex organizational and managerial problems
Bechara, J. P., & de Ven, A. H. V. (2011) · Research in the sociology of organizations · doi:10.1108/s0733-558x(2011)0000032014 · Cited by 30
Quality, productivity and business performance in home based brassware manufacturing units
Prasad, K. D., Jha, S. K., & Prakash, A. (2015) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-02-2014-0029 · Cited by 24 · cited 1×
“There are a few ways to improve the rate of progress when behind schedule in any of the construction project phases, namely, improve productivity (Prasad, Jha, and Prakash 2015), increase staff, allow overtime, reduce the work, and subcontract part of the work based on considerations of community…”
BackgroundSelf-citationUnderstanding construction supply chain management for road projects
Prakash, A., & Mohanty, R. P. (2015) · International Journal of Logistics Systems and Management · doi:10.1504/ijlsm.2015.072747 · Cited by 12
Self-citation
Cited by
Luo, L., Qiping Shen, G., Xu, G., Liu, Y., & Wang, Y. (2019) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000675 · Cited by 236
Lean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
Background
Metadata
- Authors
- Behera, P., Mohanty, R. P., & Prakash, A.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2015-06-22
- Volume
- 26
- Issue
- 16
- Pages
- 1332-1350
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W1853704711
- Cited by
- 194
- References
- 50
- FWCI
- 9.56
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.