(Re)defining public-private partnerships (PPPs) in the new public governance (NPG) paradigm: an institutional maturity perspective
The DOI matches its Crossref record; 51 of the 51 references it cites were found in a registry or an index.
Abstract
Infrastructure public-private partnerships (PPPs) are dominantly seen as part of an increasingly fragmented and uncertain public management paradigm known as New Public Governance (NPG). However, the effects of institutional maturity on PPP utilization within this domain remain understudied. In order to (re)define PPPs within the NPG paradigm, we develop a PPP institutional maturity model based on three institutional capabilities-legitimacy, trust, and capacity. We then use the U.S. PPP market as a case example to explore how the maturity of PPPs in an institutional setting depends on legitimacy, trust, and capacity in the PPP model.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
DiMaggio, P. J., & Powell, W. W. (1983) · American Sociological Review · doi:10.2307/2095101 · Cited by 38,435 · cited 1×
“…institutional maturity as the development of legitimacy, trust, and capacity in the PPP process overtime via the structuration of organizational fields (DiMaggio and Powell 1983; Scott and Meyer 1994) whereby ‘organizations … [combine] in varying constellations of field configurations’ (Jooste and…”
BackgroundThe Discovery of Grounded Theory: Strategies for Qualitative Research
Glaser, B. G., & Strauss, A. L. (2017) · Aldine (Routledge reprint) · doi:10.4324/9780203793206 · Cited by 25,789
Theory Building From Cases: Opportunities And Challenges
Eisenhardt, K. M., & Graebner, M. E. (2007) · Academy of Management Journal · doi:10.5465/amj.2007.24160888 · Cited by 16,670 · cited 2×
“In a theory-building, case-based approach, it is also recommended that the selected methods suit the purpose of the case analysis (Eisenhardt and Graebner 2007).”
MethodA PUBLIC MANAGEMENT FOR ALL SEASONS
HOOD, C. (1991) · Public Administration · doi:10.1111/j.1467-9299.1991.tb00779.x · Cited by 10,159 · cited 2×
“…sector reforms have broadly changed traditional functions of government to allow for enhanced private sector involvement in the delivery of public services (Hood 1991; Rhodes 1996; Kaul 1997; Peters and Pierre 1998; Salamon and Elliott 2002; Jooste and Richard Scott 2012; Van Den Hurk et al. 2015).”
BackgroundThe Discovery of Grounded Theory
Glaser, B. G., & Strauss, A. L. (2017) · The Discovery of Grounded Theory · doi:10.4324/9780203793206-1 · Cited by 8,344
The Economics of Organization: The Transaction Cost Approach
Williamson, O. E. (1981) · American Journal of Sociology · doi:10.1086/227496 · Cited by 6,438 · cited 1×
“…cbcasady@stanford.edu © 2019 Informa UK Limited, trading as Taylor & Francis Group characteristics, high barriers to entry, and limited competition (Williamson 1981; Vining, Boardman, and Poschmann 2005; Boardman and Vining 2012), projects naturally become magnets for corruption in institutional…”
BackgroundThe New Governance: Governing without Government
Rhodes, R. A. W. (1996) · Political Studies · doi:10.1111/j.1467-9248.1996.tb01747.x · Cited by 4,317 · cited 1×
“…sector reforms have broadly changed traditional functions of government to allow for enhanced private sector involvement in the delivery of public services (Hood 1991; Rhodes 1996; Kaul 1997; Peters and Pierre 1998; Salamon and Elliott 2002; Jooste and Richard Scott 2012; Van Den Hurk et al. 2015).”
BackgroundOsborne, D. (1993) · Public Productivity & Management Review · doi:10.2307/3381012 · Cited by 2,273
Osborne, S. P. (2006) · Public Management Review · doi:10.1080/14719030600853022 · Cited by 2,034 · cited 3×
“Moreover, future work should utilize New Public Governance as ‘a coherent conceptual framework from which to develop [more] theory and research that can inform [PPP governance] in the twenty-first century’ (Osborne 2006, 384).”
BackgroundMethodThe Tools of government: a guide to the new governance
(2002) · Choice Reviews Online · doi:10.5860/choice.40-2422 · Cited by 1,827 · cited 6×
“New public governance: a public sector paradigm shift The role of public sector institutions has evolved over time from ‘one of doing to one of arranging’ (Salamon and Elliott 2002, 8).”
BackgroundInfluentialManaging Complex Networks: Strategies for the Public Sector
Kickert, W., Klijn, E.-H., & Koppenjan, J. (1997) · SAGE Publications Ltd eBooks · doi:10.4135/9781446217658 · Cited by 1,690 · cited 1×
“…found in principal-agent theory (Zeckhauser and Pratt 1985) as well as dynamic, interdependent stakeholder settings found in network theory (Kickert, Klijn, and Koppenjan 1997) help define the government’s role in organizing and maintaining third-party networks, enabling private partners…”
Background(2010) · Routledge eBooks · doi:10.4324/9780203861684 · Cited by 1,473 · cited 2×
“…plural and pluralist sense, PPPs are specifically designed to engage multiple interdependent actors in the delivery of infrastructure assets through inter-organizational relationships, trust or relational contracts, and processes which stress service effectiveness and outcomes (Osborne 2006, 2010).”
BackgroundGovernance Without Government? Rethinking Public Administration
Peters, B. G., & Pierre, J. (1998) · Journal of Public Administration Research and Theory · doi:10.1093/oxfordjournals.jpart.a024379 · Cited by 1,318 · cited 1×
“…sector reforms have broadly changed traditional functions of government to allow for enhanced private sector involvement in the delivery of public services (Hood 1991; Rhodes 1996; Kaul 1997; Peters and Pierre 1998; Salamon and Elliott 2002; Jooste and Richard Scott 2012; Van Den Hurk et al. 2015).”
BackgroundPrincipals and Agents: The Structure of Business
Pratt, J. W., & Zeckhauser, R. (1990) · Cited by 1,274
Lane, J.-E. (2002) · Routledge eBooks · doi:10.4324/9780203467329 · Cited by 1,256 · cited 1×
“…the PPP label has been around since the early 1960s (Bovaird 2010), ‘modern’ infrastructure PPPs were conceived in the New Public Management (NPM) era of the 1990s as a way to improve the internal management of government infrastructure provision (see, e.g. Osborne 1993; Kaul 1997; Lane 2000).”
BackgroundPublic–Private Partnerships: An International Performance Review
Hodge, G. A., & Greve, C. (2007) · Public Administration Review · doi:10.1111/j.1540-6210.2007.00736.x · Cited by 1,227 · cited 4×
“As a result, PPPs have seen increasing use across a wide range of public and private collaborative endeavours (Bovaird 2004; Hodge and Greve 2007).”
BackgroundInfluentialInstitutional Environments and Organizations: Structural Complexity and Individualism
Scott, W. R., Meyer, J. W., & Boli, J. (1994) · Medical Entomology and Zoology · Cited by 1,080
Self-citationUnderestimating Costs in Public Works Projects:Error or Lie?
Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002) · Journal of the American Planning Association · doi:10.1080/01944360208976273 · Cited by 1,046
Sharing power: public governance and private markets
(1993) · Choice Reviews Online · doi:10.5860/choice.31-1791 · Cited by 676
Public–private partnerships: Perspectives on purposes, publicness, and good governance
Brinkerhoff, D. W., & Brinkerhoff, J. M. (2011) · Public Administration and Development · doi:10.1002/pad.584 · Cited by 569 · cited 1×
“Governments also legitimize their PPP models by creating standardized PPP procurement procedures (Brinkerhoff and Brinkerhoff 2011), ensuring community involvement in and acceptance of PPPs, providing conducive political environments (Flinders 2005), and building supportive legal frameworks (Tvarnø…”
MethodPublic–Private Partnerships and the Public Accountability Question
Forrer, J., Kee, J. E., Newcomer, K. E., & Boyer, E. (2010) · Public Administration Review · doi:10.1111/j.1540-6210.2010.02161.x · Cited by 436
To build or not to build: Normative and positive theories of public–private partnerships
Martimort, D., & Pouyet, J. (2006) · International Journal of Industrial Organization · doi:10.1016/j.ijindorg.2006.10.004 · Cited by 391 · cited 1×
“…phase bundling – allow public agencies to construct innovative procurement arrangements for building and managing infrastructure facilities based on trade-offs in contractual incentives, project flexibility, and institutional (Martimort and Pouyet 2008; Iossa and Martimort 2015; Girth 2017).”
BackgroundThe Simple Microeconomics of Public‐Private Partnerships
IOSSA, E., & MARTIMORT, D. (2015) · Journal of Public Economic Theory · doi:10.1111/jpet.12114 · Cited by 344 · cited 1×
“…phase bundling – allow public agencies to construct innovative procurement arrangements for building and managing infrastructure facilities based on trade-offs in contractual incentives, project flexibility, and institutional (Martimort and Pouyet 2008; Iossa and Martimort 2015; Girth 2017).”
BackgroundRenegotiation of concession contracts in Latin America
Guasch, J. L., Laffont, J.-J., & Straub, S. (2008) · International Journal of Industrial Organization · doi:10.1016/j.ijindorg.2007.05.003 · Cited by 342 · cited 1×
“Delivering public benefit through PPPs is actually very challenging and complex (Guasch, Laffont, and Straub 2008).”
BackgroundPartnership Arrangements: Governmental Rhetoric or Governance Scheme?
Teisman, G. R., & Klijn, E. (2002) · Public Administration Review · doi:10.1111/0033-3352.00170 · Cited by 306
Yang, Y., Hou, Y., & Wang, Y. (2013) · Public Administration Review · doi:10.1111/j.1540-6210.2012.02672.x · Cited by 203 · cited 1×
“…such as ‘market potential, institutional guarantees, government credibility, financial accessibility … consolidated management, and corruption control’ (Yang, Hou, and Wang 2013, 301), we draw on institutional theory to define PPP institutional maturity as the development of legitimacy, trust, and…”
BackgroundWarsen, R., Nederhand, J., Klijn, E., Grotenbreg, S., & Koppenjan, J. F. M. (2018) · Public Management Review · doi:10.1080/14719037.2018.1428415 · Cited by 202 · cited 1×
“Overall, recent evidence suggests that trust and management are significantly correlated with perceived PPP project performance (Warsen et al. 2018).”
BackgroundThe Intellectual Structure Of Research Into PPPs: A bibliometric analysis
Marsilio, M., Cappellaro, G., & Cuccurullo, C. (2011) · Public Management Review · doi:10.1080/14719037.2010.539112 · Cited by 182 · cited 1×
“Although PPPs still do not have a uniform meaning or core underlying concept (Marsilio, Cappellaro, and Cuccurullo 2011), Hodge and Greve (2007), Hodge and Greve (2010) indicate PPPs may encompass five different families of governance arrangements (see Figure 1).”
BackgroundHenisz, W. J., Levitt, R. E., & Scott, W. R. (2012) · Engineering Project Organization Journal · doi:10.1080/21573727.2011.637552 · Cited by 167
Self-citationTHE POLITICAL ECONOMY OF PUBLIC‐PRIVATE PARTNERSHIPS AND ANALYSIS OF THEIR SOCIAL VALUE*
BOARDMAN, A. E., & Vining, A. R. (2012) · Annals of Public and Cooperative Economics · doi:10.1111/j.1467-8292.2012.00457.x · Cited by 158 · cited 1×
“…as Taylor & Francis Group characteristics, high barriers to entry, and limited competition (Williamson 1981; Vining, Boardman, and Poschmann 2005; Boardman and Vining 2012), projects naturally become magnets for corruption in institutional settings where the effectiveness and transparency of…”
BackgroundPPP Experiences in Indian Cities: Barriers, Enablers, and the Way Forward
Mahalingam, A. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000130 · Cited by 135 · cited 3×
“…legitimacy and trust issues between the public and private sector, and the absence of a conducive institutional environment for PPPs (see, e.g. Mahalingam 2010; Delhi, Palukuri, and Mahalingam 2010; Jooste, Levitt, and Richard Scott 2011; Jooste and Richard Scott 2012; Van Den Hurk et al.…”
BackgroundChanging reasons for public–private partnerships (PPPs)
McQuaid, R. W., & Scherrer, W. (2010) · Public Money & Management · doi:10.1080/09540960903492331 · Cited by 130 · cited 1×
“Likewise, government and jurisdiction debt-stress, particularly at the local level, is driving governments’ choice of private involvement in contracts, as is the jurisdiction’s tax burden (McQuaid and Scherrer 2010; Albalate, Bel and Geddes 2015; Boyer and Scheller 2017).”
BackgroundShirley, M. M. (2005) · Springer eBooks · doi:10.1007/0-387-25092-1_25 · Cited by 129
Complexity in local government change
(2006) · doi:10.1080/14719030500518667 · Cited by 114 · cited 1×
“NPG is grounded in organizational sociology and network theory and accounts for the increasing fragmentation and uncertainty involved in public management (Haveri 2006).”
BackgroundHow Can We Improve Our Science to Generate More Usable Knowledge for Public Professionals?
Perry, J. L. (2012) · Public Administration Review · doi:10.1111/j.1540-6210.2012.02607.x · Cited by 106 · cited 1×
“Moreover, our application and development of existing theory through observation, analysis, and explanation of a case offers ‘a richness of understanding’ which ‘compensate[s] for weaknesses in traditional [research] approaches’ (Perry 2012, 480).”
MethodSoecipto, R. M., & Verhoest, K. (2018) · Public Management Review · doi:10.1080/14719037.2018.1428414 · Cited by 105 · cited 2×
“…has focused on examining how institutional, political, and governmental support structures affect the development of PPP-enabling fields (Delhi, Palukuri, and Mahalingam 2010; Jooste, Levitt, and Richard Scott 2011; Van Den Hurk et al. 2015; Verhoest et al. 2015; Soecipto and Verhoest 2018).”
BackgroundDo PPP’s work? What and how have we been learning so far?
Hodge, G. A., Greve, C., & Biygautane, M. (2018) · Public Management Review · doi:10.1080/14719037.2018.1428410 · Cited by 104
Kinder, T. (2012) · Public Management Review · doi:10.1080/14719037.2011.637408 · Cited by 97 · cited 2×
“First, the U.S. has historically seen closer private sector involvement in the provision of government services (see e.g. Moulton and Anheier 2002; Martin 2005; Kinder 2012).”
BackgroundBeyond ‘one size fits all’: how local conditions shape PPP-enabling field development
Jooste, S. F., Levitt, R. E., & Scott, D. (2011) · Engineering Project Organization Journal · doi:10.1080/21573727.2010.549612 · Cited by 80
Self-citationThe Public–Private Partnership Enabling Field: Evidence From Three Cases
Jooste, S. F., & Scott, W. R. (2011) · Administration & Society · doi:10.1177/0095399711413868 · Cited by 78 · cited 1×
“In a variety of international jurisdictions, ‘there have been multiple, highly publicized cases of public opposition to private provision of infrastructure and large numbers of contract renegotiations and cancellations’ (Jooste and Scott 2012, 150).”
BackgroundSelf-citationFrom “smart regulation” to “regulatory arrangements”
Gossum, P. V., Arts, B. J. M., & Verheyen, K. (2010) · Policy Sciences · doi:10.1007/s11077-010-9108-0 · Cited by 75 · cited 1×
“For example, past research has linked governance capacity with legitimacy (Van Gossum, Arts, and Verheyen 2010), found clear relationships between legal accountability or legitimacy and trust (Fard and Rostamy 2007), and concluded ‘that governance and capacity are intimately connected and that…”
Why do U.S. states adopt public–private partnership enabling legislation?
Geddes, R. R., & Wagner, B. L. (2013) · Journal of Urban Economics · doi:10.1016/j.jue.2013.05.003 · Cited by 75 · cited 3×
“…aid, have shown little impact (Geddes and Wagner 2013), differences in economic factors such as state debt and urban travel demand have had a significant effect on the adoption and favorability of PPP-enabling laws (Geddes and Wagner 2013; Albalate, Bel, and Geddes 2017; Boyer and Scheller 2017).”
BackgroundInfluentialvan den Hurk, M., Brogaard, L., Lember, V., Petersen, O. H., & Witz, P. (2015) · Journal of Comparative Policy Analysis Research and Practice · doi:10.1080/13876988.2015.1006814 · Cited by 70 · cited 7×
“…sector reforms have broadly changed traditional functions of government to allow for enhanced private sector involvement in the delivery of public services (Hood 1991; Rhodes 1996; Kaul 1997; Peters and Pierre 1998; Salamon and Elliott 2002; Jooste and Richard Scott 2012; Van Den Hurk et al. 2015).”
BackgroundInfluentialOpara, M., Elloumi, F., Okafor, O. N., & Warsame, H. A. (2017) · Accounting Forum · doi:10.1016/j.accfor.2017.01.002 · Cited by 70 · cited 2×
“A growing body of literature has attributed these failures to limited public sector capacity, lack of political will, perceived legitimacy and trust issues between the public and private sector, and the absence of a conducive institutional environment for PPPs (see, e.g. Mahalingam 2010; Delhi, Palukuri, and Mahalinga…”
BackgroundPromoting Public Trust in Public Organizations: Explaining the Role of Public Accountability
Danaeefard, H., & Rostamy, A. A. A. (2007) · Public Organization Review · doi:10.1007/s11115-007-0041-4 · Cited by 66 · cited 1×
“…capacity with legitimacy (Van Gossum, Arts, and Verheyen 2010), found clear relationships between legal accountability or legitimacy and trust (Fard and Rostamy 2007), and concluded ‘that governance and capacity are intimately connected and that innovative, simultaneous blending of public…”
BackgroundUnpacking the Path‐Dependent Process of Institutional Change for PPPs
Castaño, J. M., Mahalingam, A., & Dewulf, G. P. M. R. (2014) · Australian Journal of Public Administration · doi:10.1111/1467-8500.12062 · Cited by 65 · cited 3×
“…indicate that ‘institutional change … is path-dependent and is a function of a variety of contextspecific variables[,]’ meaning ‘[t]here is no one-size-fits-all institutional framework that is universally applicable for the pursuit of PPPs’ (Matos-Castano, Mahalingam, and Dewulf 2014, 48).”
BackgroundMethodIncentives in Third‐Party Governance: Management Practices and Accountability Implications
Girth, A. M. (2016) · Public Administration Review · doi:10.1111/puar.12645 · Cited by 59 · cited 1×
“The two distinctive features of PPPs – taxpayer/private partner risk sharing and project phase bundling – allow public agencies to construct innovative procurement arrangements for building and managing infrastructure facilities based on trade-offs in contractual incentives, project flexibility, and institutional (Mar…”
BackgroundBoyer, E. J., & Scheller, D. S. (2017) · Public Works Management & Policy · doi:10.1177/1087724x17729097 · Cited by 40
Whetsell, T. A., & Shields, P. M. (2013) · Administration & Society · doi:10.1177/0095399713490157 · Cited by 39 · cited 1×
“Since we are developing an existing framework through theory building, our twostep research design naturally aligns with the positivist public administration research methods tradition (Whetsell and Shields 2015).”
MethodReconsidering the Connection between Capacity and Governance
Hall, J. S. (2002) · Public Organization Review · doi:10.1023/a:1016071303640 · Cited by 35 · cited 1×
“…and trust (Fard and Rostamy 2007), and concluded ‘that governance and capacity are intimately connected and that innovative, simultaneous blending of public management and civic capacities is needed to build trust and govern effectively under new and challenging conditions’ (Hall 2002, 23).”
BackgroundDynamic Stakeholder Networks and the Governance of PPPs
South, A. J., Levitt, R. E., & Dewulf, G. P. M. R. (2017) · International Conference on Public-Private Partnerships (P3) · doi:10.1061/9780784480267.039 · Cited by 23
Self-citation
Metadata
- Authors
- Casady, C. B., Eriksson, K., Levitt, R. E., & Scott, W. R.
- Venue
- Public Management Review
- Publisher
- Informa UK Limited
- Published
- 2019-02-26
- Volume
- 22
- Issue
- 2
- Pages
- 161-183
- ISSN
- 1461-667X (ISSN-L)
- 1471-9037
- 1471-9045
- OpenAlex
- W2915172534
- Cited by
- 215
- References
- 51
- FWCI
- 34.38
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.