A framework to improve construction processes: Integrating Lean, Green and Six Sigma
The DOI matches its Crossref record; 21 of the 21 references it cites were found in a registry or an index.
Abstract
The construction industry consumes a significant amount of resources annually, generates significant waste and produces a host of emissions. This study develops a framework and integrates three different approaches – Lean, Green and Six Sigma – in a systematic approach with the goal of improving the quality and environmental impacts of the construction process. A case study of pile cap installation was conducted to illustrate the application of the framework and associated results. The study highlights two issues within the pile cap construction process responsible for waste: delay and potential errors in material estimation and ordering. It describes the environmental impact arising from waste, and analyzes the root causes behind waste generation to enable improved process performance. A survey of construction professionals regarding the causal factors of waste in everyday construction activities identified ‘design changes during construction’ as responsible for 60% of waste occurrences during construction and thus confirm results from the literature. In conclusion, the Lean–Green–Six Sigma framework offers a comprehensive, multi-stage approach for process improvement and minimization of life cycle environmental impacts.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
International Organization for Standardization
(2015) · Encyclopedia of Astrobiology · doi:10.1007/978-3-662-44185-5_100574 · Cited by 6,716
Purposive sampling as a tool for informant selection
Tongco, M. D. C. (2007) · Ethnobotany Research and Applications · doi:10.17348/era.5.0.147-158 · Cited by 2,597 · cited 1×
“The framework required additional validation through a questionnaire that was developed by applying purposive sampling approach (Tongco 2007).”
MethodThe ecoinvent Database: Overview and Methodological Framework (7 pp)
Frischknecht, R., Jungbluth, N., Althaus, H.-J., Doka, G., Dones, R., Heck, T., Hellweg, S., Hischier, R., Nemecek, T., Rebitzer, G., et al. (2005) · The International Journal of Life Cycle Assessment · doi:10.1065/lca2004.10.181.1 · Cited by 1,114
The Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance
Pande, P. S., Cavanagh, R. R., & Neuman, R. P. (2000) · Cited by 995
Traci: The Tool for the Reduction and Assessment of Chemical and Other Environmental Impacts
Bare, J. C. (2002) · Journal of Industrial Ecology · doi:10.1162/108819802766269539 · Cited by 980
Construction Waste: Quantification and Source Evaluation
Bossink, B. A. G., & Brouwers, H. J. H. (1996) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1996)122:1(55 · Cited by 578 · cited 2×
“The tabulated questionnaire results in similar rankings of causal factors as what is found in the literature (Bossink & Brouwers 1996; Formoso et al. 2002; Rojas & Aramvareekul 2003; Poon et al. 2004; Tam 2008).”
BackgroundResultMaterial Waste in Building Industry: Main Causes and Prevention
Formoso, C. T., Soibelman, L., De Cesare, C., & Isatto, E. L. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:4(316 · Cited by 434 · cited 2×
“The tabulated questionnaire results in similar rankings of causal factors as what is found in the literature (Bossink & Brouwers 1996; Formoso et al. 2002; Rojas & Aramvareekul 2003; Poon et al. 2004; Tam 2008).”
BackgroundResultLean Construction: From Theory to Implementation
Salem, O., Solomon, J., Genaidy, A., & Minkarah, I. (2006) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2006)22:4(168 · Cited by 412
Comparison of Environmental Effects of Steel- and Concrete-Framed Buildings
Guggemos, A. A., & Horvath, A. (2005) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2005)11:2(93 · Cited by 356 · cited 2×
“It is a valuable approach that helps in decision-making and creating opportunities for improvements within processes, such as construction for better environmental performance (Guggemos & Horvath 2005; Bilec et al. 2006; Sharrard et al. 2008; Li et al. 2010).”
BackgroundAn LCA-based environmental impact assessment model for construction processes
Li, X., Zhu, Y., & Zhang, Z. (2009) · Building and Environment · doi:10.1016/j.buildenv.2009.08.010 · Cited by 334 · cited 2×
“It is a valuable approach that helps in decision-making and creating opportunities for improvements within processes, such as construction for better environmental performance (Guggemos & Horvath 2005; Bilec et al. 2006; Sharrard et al. 2008; Li et al. 2010).”
BackgroundReducing building waste at construction sites in Hong Kong
Poon, C. S., Yu, A. T. W., & Jaillon, L. (2004) · Construction Management and Economics · doi:10.1080/0144619042000202816 · Cited by 298 · cited 3×
“The tabulated questionnaire results in similar rankings of causal factors as what is found in the literature (Bossink & Brouwers 1996; Formoso et al. 2002; Rojas & Aramvareekul 2003; Poon et al. 2004; Tam 2008).”
BackgroundMethodResultLean Processes for Sustainable Project Delivery
Lapinski, A. R., Horman, M. J., & Riley, D. R. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:10(1083 · Cited by 268 · cited 1×
“Lean is valued for its ability to identify waste (Lapinski et al. 2006; Klotz et al. 2007), but it does not quantify environmental consequences.”
BackgroundOn the effectiveness in implementing a waste-management-plan method in construction
Tam, V. W. Y. (2008) · Waste Management · doi:10.1016/j.wasman.2007.04.007 · Cited by 263
Example of a Hybrid Life-Cycle Assessment of Construction Processes
Bilec, M., Ries, R., Matthews, H. S., & Sharrard, A. L. (2006) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2006)12:4(207 · Cited by 236 · cited 2×
“It is a valuable approach that helps in decision-making and creating opportunities for improvements within processes, such as construction for better environmental performance (Guggemos & Horvath 2005; Bilec et al. 2006; Sharrard et al. 2008; Li et al. 2010).”
BackgroundSelf-citationSharrard, A. L., Matthews, H. S., & Ries, R. J. (2008) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2008)14:4(327 · Cited by 184 · cited 2×
“It is a valuable approach that helps in decision-making and creating opportunities for improvements within processes, such as construction for better environmental performance (Guggemos & Horvath 2005; Bilec et al. 2006; Sharrard et al. 2008; Li et al. 2010).”
BackgroundLabor Productivity Drivers and Opportunities in the Construction Industry
Rojas, E. M., & Aramvareekul, P. (2003) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2003)19:2(78 · Cited by 165 · cited 1×
“The tabulated questionnaire results in similar rankings of causal factors as what is found in the literature (Bossink & Brouwers 1996; Formoso et al. 2002; Rojas & Aramvareekul 2003; Poon et al. 2004; Tam 2008).”
ResultLife-Cycle Assessment Modeling of Construction Processes for Buildings
Bilec, M. M., Ries, R. J., & Matthews, H. S. (2010) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000022 · Cited by 160 · cited 1×
“…construction-related studies have focused on how to reduce waste (Pasqualini & Zawislak 2005; Garrett & Lee 2011), minimize environmental impacts (Bilec et al. 2006, 2010) or increase productivity (Pheng & Hui 2004; Celep et al. 2012), to date there has been limited research on how to combine…”
BackgroundSelf-citationImplementing and Applying Six Sigma in Construction
Pheng, L. S., & Hui, M. S. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:4(482 · Cited by 126 · cited 1×
“…studies have focused on how to reduce waste (Pasqualini & Zawislak 2005; Garrett & Lee 2011), minimize environmental impacts (Bilec et al. 2006, 2010) or increase productivity (Pheng & Hui 2004; Celep et al. 2012), to date there has been limited research on how to combine and achieve all three.”
BackgroundSix Sigma-Based Approach to Improve Performance in Construction Operations
Han, S. H., Chae, M. J., Im, K. S., & Ryu, H. D. (2007) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2008)24:1(21 · Cited by 104 · cited 1×
“Six Sigma has the potential to fill this gap (Han et al. 2008).”
BackgroundLean Construction Submittal Process—A Case Study
Garrett, D. F., & Lee, J. (2010) · Quality Engineering · doi:10.1080/08982112.2010.495100 · Cited by 37
The Certified Six Sigma Green Belt Handbook - Chapter 1
Munro, R. A., Maio, M. J., Nawaz, M. B., Ramu, G., & Zrymiak, D. (2008) · Cited by 13
Cited by
Lean and green – a systematic review of the state of the art literature
Garza-Reyes, J. A. (2015) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.04.064 · Cited by 656
Cherrafi, A., Elfezazi, S., Chiarini, A., Mokhlis, A., & Benhida, K. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.08.101 · Cited by 502
A framework for the integration of Green and Lean Six Sigma for superior sustainability performance
Cherrafi, A., Elfezazi, S., Govindan, K., Garza-Reyes, J. A., Benhida, K., & Mokhlis, A. (2017) · International Journal of Production Research · doi:10.1080/00207543.2016.1266406 · Cited by 384
Exploring the role of lean thinking in sustainable business practice: A systematic literature review
Caldera, H. T. S., Desha, C., & Dawes, L. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.05.126 · Cited by 242
“However there were also other articles emerging from additional sectors including: construction (Banawi and Bilec, 2014; Marhani et al., 2012; Marhani et al., 2013; Ogunbiyi et al., 2014; Song and Liang, 2011), metal (D'Errico et al., 2009), agri-food/food (Chaplin and Simon, 2014; Folinas et al.,…”
BackgroundKaswan, M. S., & Rathi, R. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.05.253 · Cited by 209
Metadata
- Authors
- Banawi, A., & Bilec, M. M.
- Venue
- International Journal of Construction Management
- Publisher
- Informa UK Limited
- Published
- 2014-01-02
- Volume
- 14
- Issue
- 1
- Pages
- 45-55
- ISSN
- 1562-3599 (ISSN-L)
- 2331-2327
- OpenAlex
- W2041741788
- Cited by
- 184
- References
- 21
- FWCI
- 14.22
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.