The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Measuring BIM performance: Five metrics
Abstract
The term Building Information Modelling (BIM) refers to an expansive knowledge domain within the design, construction and operation (DCO) industry. The voluminous possibilities attributed to BIM represent an array of challenges that can be met through a systematic research and delivery framework spawning a set of performance assessment and improvement metrics. This article identifies five complementary components specifically developed to enable such assessment: (i) BIM capability stages representing transformational milestones along the implementation continuum; (ii) BIM maturity levels representing the quality, predictability and variability within BIM stages; (iii) BIM competencies representing incremental progressions towards and improvements within BIM stages; (iv) Organizational Scales representing the diversity of markets, disciplines and company sizes; and (v) Granularity Levels enabling highly targeted yet flexible performance analyses ranging from informal self-assessment to high-detail, formal organizational audits. This article explores these complementary components and positions them as a systematic method to understand BIM performance and to enable its assessment and improvement. A flowchart of the contents of this article is provided.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Perceived usefulness, perceived ease of use, and user acceptance of information technology
Davis, F. D. (1989) · MIS Quarterly · doi:10.2307/249008 · Cited by 68,483
A Theoretical Extension of the Technology Acceptance Model: Four Longitudinal Field Studies
Venkatesh, V., & Davis, F. D. (2000) · Management Science · doi:10.1287/mnsc.46.2.186.11926 · Cited by 23,066
(1996) · Cited by 11,584
Henderson, R. M., & Clark, K. B. (1990) · Administrative Science Quarterly · doi:10.2307/2393549 · Cited by 8,357
Quality Is Free: The Art of Making Quality Certain
Crosby, P. B. (1979) · Andalas University Repository (Andalas University) · Cited by 2,561
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Self-citationEncyclopedia of Artificial Intelligence
(2009) · IGI Global eBooks · doi:10.4018/978-1-59904-849-9 · Cited by 1,396
Towards a System of Systems Concepts
Ackoff, R. L. (1971) · Management Science · doi:10.1287/mnsc.17.11.661 · Cited by 1,149
Lockamy, A., & McCormack, K. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410550019 · Cited by 561
Alternative research paradigms in operations
Meredith, J. R., Raturi, A., Amoako‐Gyampah, K., & Kaplan, B. (1989) · Journal of Operations Management · doi:10.1016/0272-6963(89)90033-8 · Cited by 548
Penttilä, H. (2006) · Journal of Information Technology in Construction · Cited by 332
Eppler, M. J., & Platts, K. W. (2009) · Long Range Planning · doi:10.1016/j.lrp.2008.11.005 · Cited by 263
Project Management Process Maturity (PM)2 Model
Kwak, Y. H., & Ibbs, C. W. (2002) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2002)18:3(150 · Cited by 243
The impact of emerging information technology on project management for construction
Froese, T. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.11.004 · Cited by 242
Influence, stakeholder mapping and visualization
Walker, D. H. T., Bourne, L. M., & Shelley, A. (2008) · Construction Management and Economics · doi:10.1080/01446190701882390 · Cited by 221
Software process improvement: it's a journey, not a destination
Hardgrave, B. C., & Armstrong, D. J. (2005) · Communications of the ACM · doi:10.1145/1096000.1096028 · Cited by 220
Mehmanparast, A. N., Davies, C. M., & Nikbin, K. M. (2010) · ASME 2010 Pressure Vessels and Piping Conference: Volume 5 · doi:10.1115/pvp2010-25281 · Cited by 219
Key Practices of the Capability Maturity Model, Version 1.1
Paulk, M. C., Weber, C. V., Garcia, S. M., Chrissis, M. B., & Bush, M. (1993) · doi:10.21236/ada263432 · Cited by 217
Supply chain maturity and performance in Brazil
McCormack, K., Bronzo Ladeira, M., & Paulo Valadares de Oliveira, M. (2008) · Supply Chain Management: An International Journal · doi:10.1108/13598540810882161 · Cited by 200
(2001) · Choice Reviews Online · doi:10.5860/choice.38-4525 · Cited by 177
Managerial and Organizational Cognition: Theory, Methods and Research
Stimpert, J. L. “., Eden, C., & Spender, J. ‐. (1999) · Academy of Management Review · doi:10.2307/259088 · Cited by 157
The Project Management Maturity Model
Crawford, J. K. (2006) · Information Systems Management · doi:10.1201/1078.10580530/46352.23.4.20060901/95113.7 · Cited by 151
Sahibudin, S., Sharifi, M., & Ayat, M. (2008) · Asia International Conference on Modelling & Simulation (AMS) · doi:10.1109/ams.2008.145 · Cited by 127
Fox, S., & Hietanen, J. (2007) · Construction Management and Economics · doi:10.1080/01446190600892995 · Cited by 109
Information visualizations for knowledge acquisition: The impact of dimensionality and color coding
Keller, T., Gerjets, P. H., Scheiter, K., & Garsoffky, B. (2005) · Computers in Human Behavior · doi:10.1016/j.chb.2005.01.006 · Cited by 99
Schyns, P. G., & Rodet, L. (1998) · Cited by 83
Measuring knowledge retention: a case study of a construction consultancy in the UAE
Arif, M., Egbu, C., Alom, O., & Khalfan, M. M. A. (2009) · Engineering Construction & Architectural Management · doi:10.1108/09699980910927912 · Cited by 61
Ollerenshaw, A., Aidman, E., & Kidd, G. (1997) · ResearchOnline - JCU (James Cook University) · Cited by 46
Inter-Organizational Knowledge Flow and Innovation Diffusion in Project-Based Industries
Taylor, J. E., & Levitt, R. E. (2005) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2005.334 · Cited by 45
Developing an IS/ICT management capability maturity framework
Renken, J. (2004) · South African Institute of Computer Scientists and Information Technologists · doi:10.5555/1035053.1035060 · Cited by 41
Managing change in process and people: Combining a maturity model with a competency-based approach
Gillies, A. C., & Howard, J. C. (2003) · Total Quality Management & Business Excellence · doi:10.1080/1478336032000090996 · Cited by 38
Systems Theory and Knowledge Management Systems: The Case of Pratt-Whitney Rocketdyne
Chun, M. W. S., Sohn, K., Arling, P. A., & Granados, N. F. (2008) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2008.420 · Cited by 13
Cited by
Miettinen, R., & Paavola, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.009 · Cited by 480
Macro-BIM adoption: Conceptual structures
Succar, B., & Kassem, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.018 · Cited by 399
Self-citationAn integrated approach to BIM competency assessment, acquisition and application
Succar, B., Sher, W., & Williams, A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.016 · Cited by 292
Self-citation
Metadata
- Authors
- Succar, B., Sher, W., & Williams, A.
- Venue
- Architectural Engineering and Design Management
- Publisher
- Informa UK Limited
- Published
- 2012-05
- Volume
- 8
- Issue
- 2
- Pages
- 120-142
- ISSN
- 1745-2007 (ISSN-L)
- 1752-7589
- OpenAlex
- W2084631275
- Cited by
- 269
- References
- 32
- FWCI
- 22.60
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.