Construction supply chain integration: an elusive goal?
Abstract
Purpose: To empirically investigate the problems encountered in trying to integrate supply chains in the UK construction industry and to set these problems in the context of the extensive literature on supply chain management and partnering. Design/methodology/approach: A brief review of current supply chain issues in the construction industry is provided. Three case studies of leading construction clients were carried out and these included public and private organisations from different sectors of the economy, public transport, information and communications technology and vehicle manufacturing. A large number of interviews were conducted with the various clients, their main contractors and key subcontractors and suppliers. Findings: The findings reveal that the large number of supply chain partners and the significant level of fragmentation limit the levels of integration that are achievable. The interplay of environmental and procurement related factors renders the realisation of truly integrated supply chains very problematic and difficult to achieve. Nevertheless the paper identifies some key principles that do need to be followed if the elusive goal of integration is to be eventually realised. Research limitations/implications: While the present cases were chosen to be representative, they may not necessarily reflect the experiences of all clients and contractors in the construction industry. Originality/value: This paper adds another dimension to the extensive body of knowledge that already exists on supply chain integration. In particular, it focuses on construction, a large and important sector of the economy but one that does not receive as much research interest as the manufacturing and distribution sectors.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Partnering in construction: a critical review of issues, problems and dilemmas
Bresnen, M., & Marshall, N. (2000) · Construction Management and Economics · doi:10.1080/014461900370852 · Cited by 632
A survey of supply chain collaboration and management in the UK construction industry
Akintoye, A., McIntosh, G., & Fitzgerald, E. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00012-5 · Cited by 549
Developing the concept of supply strategy
Harland, C. M., Lamming, R. C., & Cousins, P. D. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910278910 · Cited by 382
New perspectives on construction supply chain integration
Dainty, A. R. J., Millett, S. J., & Briscoe, G. H. (2001) · Supply Chain Management: An International Journal · doi:10.1108/13598540110402700 · Cited by 343
Self-citationPutting supply chain learning into practice
Bessant, J., Kaplinsky, R., & Lamming, R. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310458438 · Cited by 327
Studying the client's role in construction management
Cherns, A. B., & Bryant, D. T. (1984) · Construction Management and Economics · doi:10.1080/01446198400000016 · Cited by 323
Supply strategy and network effects — purchasing behaviour in the construction industry
Dubois, A., & Gadde, L.-E. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00016-2 · Cited by 313
A study of supply chain management practice in UK industrial SMEs
Quayle, M. (2003) · Supply Chain Management: An International Journal · doi:10.1108/13598540310463387 · Cited by 244
Client‐led strategies for construction supply chain improvement
Briscoe, G. H., Dainty, A. R. J., Millett, S. J., & Neale, R. H. (2004) · Construction Management and Economics · doi:10.1080/0144619042000201394 · Cited by 192
Self-citationConstruction supply chain partnerships: skills, knowledge and attitudinal requirements
Briscoe, G., Dainty, A. R. J., & Millett, S. (2001) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(01)00005-3 · Cited by 186
Self-citation
Cited by
The determinants of organizational change management success: Literature review and case study
Errida, A., & Lotfi, B. (2021) · International Journal of Engineering Business Management · doi:10.1177/18479790211016273 · Cited by 399
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Interdependence in supply chains and projects in construction
Bankvall, L., Bygballe, L. E., Dubois, A., & Jahre, M. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068314 · Cited by 253
Circular economy business model in the construction industry: a systematic review
Jayakodi, S., Senaratne, S., & Perera, S. (2024) · Buildings · doi:10.3390/buildings14020379 · Cited by 33
Metadata
- Authors
- Briscoe, G., & Dainty, A.
- Venue
- Supply Chain Management: An International Journal
- Publisher
- Emerald
- Published
- 2005-09-01
- Volume
- 10
- Issue
- 4
- Pages
- 319-326
- ISSN
- 1359-8546 (ISSN-L)
- OpenAlex
- W2077827785
- Cited by
- 303
- References
- 17
- FWCI
- 6.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Construction supply chain integration: an elusive goal? https://app.cochat.ai/papers/10.1108/13598540510612794
- The paper
- Briscoe, G., & Dainty, A. (2005). Construction supply chain integration: an elusive goal? Supply Chain Management: An International Journal. https://doi.org/10.1108/13598540510612794
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.