CoChat

Building trust in construction projects

Open access
Khalfan, Malik M.A., McDermott, Peter, Swan, Will · 2007 · Supply Chain Management: An International Journal
Cited by 213

The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.

Abstract

Purpose: The objective of this paper is to present different perspectives on building “trust” among supply chain participants working on construction projects. Design/methodology/approach: A case study methodology was adopted; with five construction projects selected as five case studies for the trust in construction project on the basis a selection criteria devised for the research project. Over 40 interviews were conducted with participants operating at different levels in their respective organisations and at different point in the supply chain. Findings: The information provided by the multiple informants was, to a large extent, consistent with much of the academic literature relating to the importance of and barriers to trust. Specifically, the case studies highlighted: what people within the construction industry understand by trust, reliance, and honest professional relationship; the key factors that contribute towards building trust and factors that result into breakdown of trust; and organisational and project related factors that influence trust and relationships among people within the industry. Research limitations/implications: The findings from this study are limited due to: a small number of case studies undertaken, focused within the North West Region of England, and limited time and resources available. However, the ideas proposed for ways to develop trust in construction projects as seen from project findings have important implications for not only the clients but also for the main contractors and sub‐contractors who need to pay greater attention to build trusting and long‐term relationship as part of an integrated supply chain in order to deliver the continuous demand for services especially from public sector clients. Practical implications: If more businesses operating in the construction sector gave more thought to the importance of trust in construction projects then this could have a significant impact on contract design and over all procurement strategy. Specifically the repetitive work carried out by the local authorities in the UK, such as school building and maintenance, social housing stock improvement, etc., can be subcontracted to the contractors on a longer term basis resulting into long term supply chain relationship among organisations and cost savings. Originality/value: The research is among the first attempts in response to Latham report published in 1994, in order to explore the role of trust in construction projects, from the perspective of multiple stakeholders. The paper provides insights into the practical issues that prevent the widespread development of trust within the construction industry, which is a challenge that clearly warrants further attention from academics and practitioners.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/13598540710826308

Cites

11 of 11 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Cited by

See all 213

Metadata

Authors
Khalfan, M. M. A., McDermott, P., & Swan, W.
Venue
Supply Chain Management: An International Journal
Publisher
Emerald
Published
2007-10-02
Volume
12
Issue
6
Pages
385-391
ISSN
1359-8546 (ISSN-L)
OpenAlex
W2020908180
Cited by
213
References
11
FWCI
11.92
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.