Managing through measures: a study of impact on performance
The DOI matches its Crossref record; 68 of the 68 references it cites were found in a registry or an index.
Abstract
Purpose: This study investigates the use of performance measures and how performance measurement impacts performance. Design/methodology/approach: This study was conducted through multiple case studies in a single organisation. Comparisons are made between performance measurement practices in comparable high and average‐performing business units. Findings: The findings suggest that current research into the impact of performance measurement on performance may be too simplistic in its approach as much of the research relies on studying the physical and formal systems used, ignoring the types of factors found to be important in this study. Research limitations/implications: Being based on a single organisation, the wider applicability of the specific findings from this study should be questioned. However, if, as we suggest, the interactive nature of the use of the measurement system is important, future research will need to find ways of observing, measuring and quantifying this interactivity to allow a richer picture of the impact of performance measurement on performance to be developed. Practical implications: The differences observed between the high and average‐performing cases was in the way they managed with the measures. Average‐performing business units used the performance measurement system as a simple control system, whereas, high performing business units were using the measurement system much more interactively. Originality/value: This paper highlights the importance of using performance measures interactively and suggests further research into Simons' concept of “interactive control”.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
(2008) · Biostatistics and Microbiology: A Survival Manual · doi:10.1007/978-0-387-77282-0_6 · Cited by 17,371
Hartley, J. (2004) · Essential Guide to Qualitative Methods in Organizational Research · doi:10.4135/9781446280119.n26 · Cited by 15,461
The balanced scorecard : measures that drive performance
Caplan, R. S. (1992) · Harvard business review · Cited by 12,085
(1992) · PubMed · Cited by 7,979
Using the balanced scorecard as a strategic management system
Kaplan, R. S., & Norton, D. P. (1996) · Harvard business review · Cited by 5,015
Kaplan, R. S., & Norton, D. P. (2000) · Cited by 2,600
Putting the Balanced Scorecard to Work
Kaplan, R. S., & Norton, D. P. (1998) · The Economic Impact of Knowledge · doi:10.1016/b978-0-7506-7009-8.50023-9 · Cited by 2,180 · cited 1×
“…(Keegan et al 1989; Lynch & Cross, 1991; Fitzgerald et al, 1991, Kaplan & Norton, 1992; Neely et al, 2002) and multiple processes for the design of performance measurement systems (Bitton, 1990; Dixon et al, 1991; Kaplan & Norton, 1993, 1996; Neely et al, 1996, 2002a; Krause & Mertins, 1999).”
BackgroundPerformance management: a framework for management control systems research
Otley, D. (1999) · Management Accounting Research · doi:10.1006/mare.1999.0115 · Cited by 2,023 · cited 6×
“…key processes associated with the use of performance measures have identified seven factors; (1) the linking to strategic objectives (Atkinson 1998; Otley 1999); (2) the method of data capture (Lynch & Cross, 1991; Simons, 1991; McGee, 1992; Neely, 1998); (3) data analysis (Lynch & Cross 1991;…”
BackgroundMethodInfluentialIttner, C. D., & Larcker, D. F. (1998) · Journal of Accounting Research · doi:10.2307/2491304 · Cited by 1,607 · cited 3×
“2”
BackgroundMethodOn the folly of rewarding A, while hoping for B
Kerr, S. (1975) · Academy of Management Journal · doi:10.2307/255378 · Cited by 1,585
The performance measurement manifesto.
Eccles, R. G. (1991) · PubMed · Cited by 1,289
Making Management Decisions: the Role of Intuition and Emotion
Simon, H. A. (1987) · Academy of Management Perspectives · doi:10.5465/ame.1987.4275905 · Cited by 1,185 · cited 1×
“The findings suggest that current research into the impact of performance measurement on performance may be too simplistic in its approach as much of the research relies on studying the physical and formal systems used, ignoring the types of factors found to be important in this study.”
BackgroundDesigning, Implementing and Updating Performance Measurement Systems
Bourne, M., Mills, J., Wilcox, M., Neely, A., & Platts, K. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010330739 · Cited by 1,143 · cited 6×
“A recent study has analysed 99 published papers on the impact of performance measurement on organisational performance (Franco & Bourne, 2004).”
BackgroundInfluentialSelf-citationAllerton, D. J. (1995) · Journal of Atmospheric and Terrestrial Physics · doi:10.1016/0021-9169(95)90017-9 · Cited by 1,102
The Performance Prism: The Scorecard for Measuring and Managing Business Success
Neely, A. D., Adams, C., & Kennerley, M. (2003) · Cited by 1,028
Self-citationLinking Balanced Scorecard Measures to Size and Market Factors: Impact on Organizational Performance
Hoque, Z., & James, W. (2000) · Journal of Management Accounting Research · doi:10.2308/jmar.2000.12.1.1 · Cited by 986 · cited 2×
“Over the period, the focus has moved from designing balanced performance measurement systems, through implementation to the use of measures to manage performance.”
BackgroundPerformance measurement system design: developing and testing a process‐based approach
Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M., & Kennerley, M. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010343708 · Cited by 922 · cited 3×
“Four main processes have been identified in performance measurement (Neely et al, 2000; Bourne et al, 2000); these being design, implementation, use and refreshing.”
BackgroundSelf-citationAn Empirical Investigation of an Incentive Plan that Includes Nonfinancial Performance Measures
Banker, R. D., Potter, G., & Srinivasan, D. (2000) · The Accounting Review · doi:10.2308/accr.2000.75.1.65 · Cited by 897 · cited 2×
“2”
BackgroundTheory and practice in SME performance measurement systems
Hudson, M., Smart, A., & Bourne, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/eum0000000005587 · Cited by 855 · cited 1×
“…1996; Bourne et al, 2002 Organisational size Measurement is easier in larger organisations and more problematic in smaller ones Hoque and James, 2000; Hudson et al. 2001a, 2001b Organisational culture Alignment between the cultural elements embedded in the measurement system and the users’…”
BackgroundSelf-citationThe Balanced Scorecard: Judgmental Effects of Common and Unique Performance Measures
Lipe, M. G., & Salterio, S. E. (2000) · The Accounting Review · doi:10.2308/accr.2000.75.3.283 · Cited by 843 · cited 6×
“The problems of implementation have also been studied (Meekings 1995; Bierbusse & Siesfeld 1997; Lewy & Du Mee, 1998; Schneiderman, 1999; Bourne et al, 1999, 2000, 2002, 2003), but the whole area of how performance measures are used has attracted less attention until recently.”
BackgroundMethodInfluentialMalina, M. A., & Selto, F. H. (2001) · Journal of Management Accounting Research · doi:10.2308/jmar.2001.13.1.47 · Cited by 820 · cited 3×
“…the measurement system and the users’ cultural preference is beneficial De Waal, 2002; Gates, 1999; Johnston et al., 2002; Lingle and Schiemann, 1996; Lockamy and Cox, 1995; Maisel, 2001; Malina and Selto, 2002; Bititci et al, 2004 Management style Gelderman, 1998; Libby & Luft, 1993; Hunton et 5”
BackgroundPerformance measurement and performance management
Lebas, M. J. (1995) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00081-x · Cited by 815 · cited 3×
“As stated previously, the organisational context, performance measurement content and process will all impact on the outcome, so we have adopted Pettigrew et al’s (1989) framework of context, content and process in our presentation of the literature.”
BackgroundMethodPerformance measurement in service businesses
Brignall, T. J., Fitzgerald, L., Johnston, R., & Silvestro, R. (1991) · University of Warwick · doi:10.82444/warw.33720976 · Cited by 777
Strategic orientation and top management attention to control systems
Simons, R. (1991) · Strategic Management Journal · doi:10.1002/smj.4250120105 · Cited by 737
(2020) · Management Accounting · doi:10.24053/9783739880280-167 · Cited by 706
Integrated performance measurement systems: a development guide
Bititci, U. S., Carrie, A. S., & McDevitt, L. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710167230 · Cited by 694 · cited 3×
“As stated previously, the organisational context, performance measurement content and process will all impact on the outcome, so we have adopted Pettigrew et al’s (1989) framework of context, content and process in our presentation of the literature.”
BackgroundMethodThe changing basis of performance measurement
Ghalayini, A. M., & Noble, J. S. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610125787 · Cited by 676 · cited 2×
“…continuous reviews of the measures themselves, their results, and their impact on goals and strategy with a clear focus on improvement and learning (Ghalayini and Noble, 1996; Johnston et al., 2002; Kaplan and Norton, 2001b; Kennerley and Neely, 2002, 2003; Lingle and Schiemann, 1996; Neely et…”
BackgroundMethodToward an integrative framework of organizational control
Flamholtz, E. G., Das, T. K., & Tsui, A. S. (1985) · Accounting, Organizations and Society · doi:10.1016/0361-3682(85)90030-3 · Cited by 675
Determinants of judgment performance in accounting settings: Ability, knowledge, motivation
Libby, R., & Luft, J. L. (1993) · Accounting Organizations and Society · doi:10.1016/0361-3682(93)90040-d · Cited by 666 · cited 1×
“…the measurement system and the users’ cultural preference is beneficial De Waal, 2002; Gates, 1999; Johnston et al., 2002; Lingle and Schiemann, 1996; Lockamy and Cox, 1995; Maisel, 2001; Malina and Selto, 2002; Bititci et al, 2004 Management style Gelderman, 1998; Libby & Luft, 1993; Hunton et 5”
BackgroundComing up short on nonfinancial performance measurement.
Ittner, C. D., & Larcker, D. F. (2003) · PubMed · Cited by 627
Coming Up Short on Nonfinancial Performance Measurement
Smoot, P. (2004) · Harvard business review · Cited by 611
Measuring performance in a changing business environment
Kennerley, M., & Neely, A. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310458465 · Cited by 610 · cited 1×
“…on goals and strategy with a clear focus on improvement and learning (Ghalayini and Noble, 1996; Johnston et al., 2002; Kaplan and Norton, 2001b; Kennerley and Neely, 2002, 2003; Lingle and Schiemann, 1996; Neely et al., 2000) to keep the measures and measurement system relevant for the…”
Self-citationDesigning performance measures: a structured approach
Neely, A., Richards, H., Mills, J., Platts, K., & Bourne, M. (1997) · International Journal of Operations & Production Management · doi:10.1108/01443579710177888 · Cited by 599 · cited 4×
“The research described in this paper was designed to address the question “how the differences in use of performance measurement have different impact on business performance?””
BackgroundInfluentialSelf-citationA framework of the factors affecting the evolution of performance measurement systems
Kennerley, M., & Neely, A. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450293 · Cited by 575 · cited 2×
“…on goals and strategy with a clear focus on improvement and learning (Ghalayini and Noble, 1996; Johnston et al., 2002; Kaplan and Norton, 2001b; Kennerley and Neely, 2002, 2003; Lingle and Schiemann, 1996; Neely et al., 2000) to keep the measures and measurement system relevant for the…”
BackgroundSelf-citationBalanced scorecards in Finnish companies: A research note
Malmi, T. (2001) · Management Accounting Research · doi:10.1006/mare.2000.0154 · Cited by 498 · cited 1×
“This now appears the focus of current research (e.g. Lipe and Salterio, 2000, 2002; Kalagnanam, 2001; Vakkuri and Meklin, 2001; Barsky and Marchant, 2001; Malmi, 2001; Malina and Selto, 2002; Epstein, 2002) and the use of performance measures is the subject of this paper.”
BackgroundImplementing performance measurement systems: a literature review
Bourne, M., Neely, A., Mills, J., & Platts, K. (2003) · International Journal of Business Performance Management · doi:10.1504/ijbpm.2003.002097 · Cited by 480 · cited 3×
“The problems of implementation have also been studied (Meekings 1995; Bierbusse & Siesfeld 1997; Lewy & Du Mee, 1998; Schneiderman, 1999; Bourne et al, 1999, 2000, 2002, 2003), but the whole area of how performance measures are used has attracted less attention until recently.”
BackgroundMethodSelf-citationPerformance measurement systems - Models, characteristics and measures
De Toni, A., & Tonchia, S. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110358459 · Cited by 426 · cited 1×
“Key words: Performance Measurement, Performance Management, Business Performance”
BackgroundMarket competition, management accounting systems and business unit performance
Mia, L., & Clarke, B. (1999) · Management Accounting Research · doi:10.1006/mare.1998.0097 · Cited by 419 · cited 1×
“Lokman and Clarke (1999) studied the influence of market competitiveness on the use of information, performance measurement and business unit performance and Husain and Hoque (2002) found that economic constraints and regulatory regimes influenced the use of measurement systems.”
BackgroundBourne, M., Neely, A., Platts, K., & Mills, J. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450329 · Cited by 403 · cited 2×
“The problems of implementation have also been studied (Meekings 1995; Bierbusse & Siesfeld 1997; Lewy & Du Mee, 1998; Schneiderman, 1999; Bourne et al, 1999, 2000, 2002, 2003), but the whole area of how performance measures are used has attracted less attention until recently.”
BackgroundSelf-citationPerera, S., Harrison, G., & Poole, M. (1997) · Accounting, Organizations and Society · doi:10.1016/s0361-3682(96)00048-7 · Cited by 384 · cited 2×
“2”
BackgroundThe balanced scorecard: a necessary good or an unnecessary evil?
Mooraj, S., Oyon, D. F., & Hostettler, D. (1999) · European Management Journal · doi:10.1016/s0263-2373(99)00034-1 · Cited by 369
The paradox of strategic controls
Goold, M., & Quinn, J. J. (1990) · Strategic Management Journal · doi:10.1002/smj.4250110104 · Cited by 364
WHY MEASUREMENT INITIATIVES FAIL
Neely, A., & Bourne, M. (2000) · Measuring Business Excellence · doi:10.1108/13683040010362283 · Cited by 338 · cited 4×
“As we stated in the introduction, the processes of design and implementation have been studied and both have an impact on the outcome (Bourne et al, 2003) and effectiveness of 6 the measurement system (Neely & Bourne, 2000).”
BackgroundMethodInfluentialSelf-citationFlamholtz, E. G. (1983) · Accounting, Organizations and Society · doi:10.1016/0361-3682(83)90023-5 · Cited by 306 · cited 2×
“…and communication (Bititci et al 1997; Forza & Salvador 2000; Kerssens-van & Fisscher 2003; Lebas 1995; Lynch & Cross 1991; Simons, 1991; McGee, 1992; Neely, 1998; Otley, 1999 (6) decision making (Ittner et al, 2003; Neely, 1998) and (7) taking action (Flamholtz, 1983, 1985; Simons, 1991).”
The forces that shape organisational performance measurement systems:
Waggoner, D. B., Neely, A. D., & P. Kennerley, M. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00201-1 · Cited by 293 · cited 1×
“Smith & Goddard (2002) and Waggoner et al. (1999) have suggested market uncertainty, supplier characteristic and the economic situation all impact performance measurement effectiveness, whilst Goold & Quinn (1991) argued that performance measurement effectiveness is contingent on the speed of…”
BackgroundA note on the judgmental effects of the balanced scorecard's information organization
Lipe, M. G., & Salterio, S. (2002) · Accounting, Organizations and Society · doi:10.1016/s0361-3682(01)00059-9 · Cited by 276 · cited 6×
“Fourthly, quasi-experimental approaches (similar to those by Lipe & Salterio, 2000, 2002) could be used to validate the importance of the individual elements identified in the case and survey research.”
BackgroundMethodInfluentialHussain, M., & Hoque, Z. (2002) · Accounting, Auditing & Accountability Journal · doi:10.1108/09513570210425583 · Cited by 196
Getting the measure of your business
Neely, A. D. (2002) · OpenGrey (Institut de l'Information Scientifique et Technique) · Cited by 195
McAdam, R., & Bailie, B. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210440492 · Cited by 175
Improving control through effective performance measurement in SMEs
Smith, M. H., Lean, J., & Smart, P. A. (2001) · Production Planning & Control · doi:10.1080/09537280110061557 · Cited by 172 · cited 2×
“Over the period, the focus has moved from designing balanced performance measurement systems, through implementation to the use of measures to manage performance.”
BackgroundAN ACADEMY CLASSIC On the folly of rewarding A, while hoping for B
Kerr, S. (1995) · Academy of Management Perspectives · doi:10.5465/ame.1995.9503133466 · Cited by 160 · cited 1×
“…management to have increased overall productivity across the company, but also caused the kinds of dysfunctional behaviours one would expect in specific situations (Kerr, 1995, “On the Folly of Rewarding A, While Hoping for B”), presenting Branch Managers with some dilemmas over allocation of jobs.”
BackgroundPerformance management and Operational Research: a marriage made in heaven?
Smith, P., & Goddard, M. K. (2002) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601279 · Cited by 143 · cited 1×
“Smith & Goddard (2002) and Waggoner et al. (1999) have suggested market uncertainty, supplier characteristic and the economic situation all impact performance measurement effectiveness, whilst Goold & Quinn (1991) argued that performance measurement effectiveness is contingent on the speed of…”
BackgroundThe interplay between performance measurement, organizational culture and management styles
Bititci, U., Mendibil, K., Nudurupati, S., Turner, T. J., & Garengo, P. (2004) · Measuring Business Excellence · doi:10.1108/13683040410555591 · Cited by 142 · cited 2×
“…the measurement system and the users’ cultural preference is beneficial De Waal, 2002; Gates, 1999; Johnston et al., 2002; Lingle and Schiemann, 1996; Lockamy and Cox, 1995; Maisel, 2001; Malina and Selto, 2002; Bititci et al, 2004 Management style Gelderman, 1998; Libby & Luft, 1993; Hunton et 5”
BackgroundDoes the balance scorecard work: an empirical investigation
Neely, A. D. (2008) · CERES (Cranfield University) · Cited by 124
‘Good enough’ performance measurement: a trade-off between activity and action
Johnston, R., Brignall, S., & Fitzgerald, L. (2002) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601217 · Cited by 116 · cited 3×
“…themselves, their results, and their impact on goals and strategy with a clear focus on improvement and learning (Ghalayini and Noble, 1996; Johnston et al., 2002; Kaplan and Norton, 2001b; Kennerley and Neely, 2002, 2003; Lingle and Schiemann, 1996; Neely et al., 2000) to keep the…”
BackgroundQuality‐focused performance measurement systems: a normative model
Lockamy, A. (1998) · International Journal of Operations & Production Management · doi:10.1108/01443579810217440 · Cited by 88 · cited 1×
“The findings suggest that current research into the impact of performance measurement on performance may be too simplistic in its approach as much of the research relies on studying the physical and formal systems used, ignoring the types of factors found to be important in this study.”
BackgroundUnlocking the potential of performance measurement: A practical implementation guide
Meekings, A. (1995) · Public Money & Management · doi:10.1080/09540969509387888 · Cited by 86 · cited 1×
“The problems of implementation have also been studied (Meekings 1995; Bierbusse & Siesfeld 1997; Lewy & Du Mee, 1998; Schneiderman, 1999; Bourne et al, 1999, 2000, 2002, 2003), but the whole area of how performance measures are used has attracted less attention until recently.”
BackgroundAssessing some distinctive dimensions of performance feedback information in high performing plants
Forza, C., & Salvador, F. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010308112 · Cited by 73 · cited 3×
“As stated previously, the organisational context, performance measurement content and process will all impact on the outcome, so we have adopted Pettigrew et al’s (1989) framework of context, content and process in our presentation of the literature.”
BackgroundMethodWeb enabled performance measurement systems
Bititci, U., Nudurupati, S., Turner, T. J., & Creighton, S. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210450310 · Cited by 72
Devising a balanced scorecard matched to business strategy
Kaplan, R. S. (1994) · Strategy and Leadership · doi:10.1108/eb054476 · Cited by 68 · cited 2×
“The different dimensions of the measures used are important to the users of measurement systems as they direct management focus (Kaplan, 1994; Johnson and Kaplan, 1987), be they internal and external or financial and non-financial (Keegan et al.”
BackgroundMultinational companies performance measurement systems: international perspectives
Coates, J., Davis, E. W., Emmanuel, C. R., et al. (1992) · Management Accounting Research · doi:10.1016/s1044-5005(92)70008-0 · Cited by 64
Performance measurement system design: testing a process approach in manufacturing companies
Bourne, M., Mills, J., Neely, A. D., Platts, K. W., Wilcox, M., Hamblin, D. J., & Bicheno, J. (1999) · International Journal of Business Performance Management · doi:10.1504/ijbpm.1999.004435 · Cited by 36 · cited 5×
“The problems of implementation have also been studied (Meekings 1995; Bierbusse & Siesfeld 1997; Lewy & Du Mee, 1998; Schneiderman, 1999; Bourne et al, 1999, 2000, 2002, 2003), but the whole area of how performance measures are used has attracted less attention until recently.”
BackgroundMethodInfluentialSelf-citationSucceeding in managerial accounting. Part 2: a structural equations analysis
Hunton, J. E., Wier, B., & Stone, D. N. (2000) · Accounting Organizations and Society · doi:10.1016/s0361-3682(99)00064-1 · Cited by 34
Performance measurement and management control : a compendium of research
Epstein, M. J., & Manzoni, J. (2002) · Cited by 33
de Waal, A. A. (2002) · Digital Academic REpository of VU University Amsterdam (Vrije Universiteit Amsterdam) · Cited by 30
Competitiveness and the management of strategic change processes
Pettigrew, A., Whipp, R., & Rosenfeld, R. (2023) · Routledge eBooks · doi:10.4324/9781003369820-7 · Cited by 18
Informativeness of Performance Measures in the Presence of Reporting Discretion
Natarajan, R. (2004) · Journal of Accounting Auditing & Finance · doi:10.1177/0148558x0401900105 · Cited by 10 · cited 1×
“It was decided that as “decision-making” is often difficult to observe ( Ramachandran, 2004”
Background
Cited by
The use of Web analytics for digital marketing performance measurement
Järvinen, J., & Karjaluoto, H. (2015) · Industrial Marketing Management · doi:10.1016/j.indmarman.2015.04.009 · Cited by 364
“The framework has been adopted in a number of studies on the use of performancemeasurement systems, all of which have concluded that the content, process, and context of performance measurement affect the outcome of the system (Bourne et al., 1999, 2002, 2005; Martinez et al., 2010).”
BackgroundMethodResearching performance measurement systems: An information systems perspective
Marchand, M., & Raymond, L. (2008) · International Journal of Operations & Production Management · doi:10.1108/01443570810881802 · Cited by 122
Metadata
- Authors
- Bourne, M., Kennerley, M., & Franco‐Santos, M.
- Venue
- Journal of Manufacturing Technology Management
- Publisher
- Emerald
- Published
- 2005-06-01
- Volume
- 16
- Issue
- 4
- Pages
- 373-395
- ISSN
- 1741-038X (ISSN-L)
- OpenAlex
- W2002323887
- Cited by
- 209
- References
- 68
- FWCI
- 13.80
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.