Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size
The DOI matches its Crossref record, with a small difference in title or year; 54 of the 56 references it cites were found in a registry or an index.
Abstract
Purpose: One of the world's largest construction markets is in Asia where construction activity is boosted by investment on transport infrastructure. This paper aims to identify and analyse causes of cost overruns in transport infrastructure projects in Asia and assess their importance and statistical relationship with project size. Design/methodology/approach: The paper pursues the following objectives. First, it identifies factors contributing to cost overruns. Second, using case data and regression analysis, it establishes the statistical relationship between project size and cost overruns. Third, it analyses questionnaire data to rank causes of cost overruns according to their frequency, severity and significance. Last, the paper identifies contract types mostly associated with cost escalation. Findings: The findings confirm a moderate correlation between cost overruns and one indicator of project size. Awarding contracts to the lowest bidder is identified as the most significant cause of cost overruns. Lump‐sum contracts were found to have the greatest influence on the occurrence of cost overruns. Research limitations/implications: Stratified sampling would allow the evaluation of how cost overruns are perceived by different professional groups. Further research can focus on measures for the prevention of cost overruns. Originality/value: The causes of cost overruns have been at the focal point of research however, most studies consider cost overruns in specific Asian countries. Moreover, transport infrastructure projects have received little attention or been underrepresented in datasets comprising general construction projects. The paper seeks to fill this gap by carrying out in‐depth investigation of cost overruns in transport infrastructure in the broader context of Asia.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Park and Papadopoulou [32] conducted a study on 35 transport infrastructure-related projects which were completed between 1983 and 2010 in Asian developing and emerging countries, including Bangladesh, Hong Kong, India, Malaysia, Myanmar, Pakistan, Singapore, South Korea, Sri Lanka, Taiwan, Thailand, and Vietnam.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [32]
In the citing paper
“and their study found that the most significant reason for the cost-overrun in Asia is the common practice of awarding contracts to the lowest bidder for infrastructure-related projects.”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [32]
In the citing paper
“They identified 27 project implementation problems”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [32]
In the citing paper
“It has been found that awarding the contract to the lowest bidder is one of the main causes for delaying projects [32,36,54].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [32]
In the citing paper
“Slow inspection is one of the managerial problems and one of the causes of project delays [32,36].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [32]
2 more claims about this paper
Create a free account to see every claim other papers make about this one.
Citations
Cites
Bell, E., Bryman, A., & Harley, B. (2022) · Oxford University Press eBooks · doi:10.1093/hebz/9780198869443.001.0001 · Cited by 10,965
Case Selection Techniques in Case Study Research: A Menu of Qualitative and Quantitative Options
Seawright, J., & Gerring, J. (2008) · Political Research Quarterly · doi:10.1177/1065912907313077 · Cited by 3,827
Megaprojects and Risk: An Anatomy of Ambition
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,415
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
Causes and effects of delays in Malaysian construction industry
Sambasivan, M., & Soon, Y. W. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.007 · Cited by 1,422
Understanding the key risks in construction projects in China
Zou, P. X. W., Zhang, G., & Wang, J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.001 · Cited by 859
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00055-8 · Cited by 796
How common and how large are cost overruns in transport infrastructure projects?
Flyvbjerg, B., Skamris holm, M. K., & Buhl, S. L. (2003) · Transport Reviews · doi:10.1080/01441640309904 · Cited by 783
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698
Research works printed but not linked: 13
- Acharya, N.K., Lee, Y.D., Kim, S.Y. and Lee, J.C. (2006), “Analysis of construction delay factor: a Korean perspective”, Industrial Engineering and Management Systems Proceedings of the 7th Asia Pacific Conference, Bangkok, pp. 883‐95.
- Ashworth, A. (2004), Cost Studies of Buildings, 4th ed., Pearson Education Limited, Harlow.
- Ashworth, A. (2008), Pre‐Contract Studies: Development Economics, Tendering and Estimating, 3rd ed., Blackwell Publishing Limited, Oxford.
- Azhar, N., Farooqui, R.U. and Ahmed, S.M. (2008), “Cost overrun factors in construction industry of Pakistan”, Construction in developing countries proceedings of the 1st international conference, Karachi, pp. 499‐508.
- Burke, R. (2003), Project Management Planning and Control Techniques, 4th ed., John Wiley and Sons, Chichester.
- Chimwaso, D.K. (2000), “An evaluation of cost performance of public projects: a case of Botswana”, Construction in Developing Countries Proceedings of the 2nd International Conference, Gabarone, pp. 81‐91.
- Coakes, S.J. and Ong, C. (2011), SPSS Version 18.0 for Windows Analysis without Anguish, John Wiley and Sons, Milton.
- Hackett, M., Robinson, I. and Statham, G. (2007), The Aqua Group Guide to Procurement, Tendering and Contract Administration, Blackwell Publishing Limited, Oxford.
- Jackson, S. (2002), “Project cost overruns and risk management”, Construction Management Proceedings of the 18th Annual Association of Researchers Conference, Newcastle, pp. 165‐73.
- Knight, A. and Ruddock, L. (2008), Advanced Research Methods in the Built Environment, Wiley‐Blackwell, Oxford.
- Nega, F. (2008), “Causes and effects of cost overrun on public building construction projects in Ethiopia”, MSc dissertation, Addis Ababa University, Addis Ababa.
- Pitcher, R. (1994), Project Cost Control in Construction, 2nd ed., Blackwell Scientific Publications, Oxford.
- Russell, R.S. and Taylor, B.W. (2009), Operations Management along the Supply Chain, 6th ed., John Wiley & Sons, Chiehester.
Cited by
Cost overrun in the Malaysian construction industry projects: A deeper insight
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.04.004 · Cited by 210
Memon, A. H., & Rahman, I. A. (2014) · The Scientific World Journal · doi:10.1155/2014/165158 · Cited by 193
“Park and Papadopoulou [18] reported that most significant causes of cost overruns in infrastructure projects experienced in Asia are contract awarded to the lowest bidder, inadequate site investigations, unforeseen site conditions, inadequate pre-construction study, and inaccurate estimates.”
BackgroundTime Delay and Cost Overrun in Qatari Public Construction Projects
Senouci, A. B., Ismail, A., & Eldin, N. N. (2016) · Procedia Engineering · doi:10.1016/j.proeng.2016.11.632 · Cited by 141
Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis
Herrera, R. F., Sánchez, O., Castañeda, K., & Porras-Díaz, H. (2020) · Applied Sciences · doi:10.3390/app10165506 · Cited by 108
Review of construction journals on causes of project cost overruns
Durdyev, S. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2020-0137 · Cited by 125
Understanding the Landscape of Overruns in Transport Infrastructure Projects
Love, P. E. D., Smith, J., Simpson, I., Regan, M., & Olatunji, O. A. (2014) · Environment and Planning B Planning and Design · doi:10.1068/b130102p · Cited by 106
Revisiting the construction project failure factors in Vietnam
Nguyen, T. P., & Chileshe, N. (2015) · Built Environment Project and Asset Management · doi:10.1108/bepam-10-2013-0042 · Cited by 97
The cost performance of transportation projects: The fallacy of the Planning Fallacy account
Love, P. E. D., Sing, M. C. P., Ika, L. A., & Newton, S. (2019) · Transportation Research Part A Policy and Practice · doi:10.1016/j.tra.2019.02.004 · Cited by 115
Huo, T., Ren, H., Cai, W., Shen, Q., Liu, B., Zhu, M., & Wu, H. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001444 · Cited by 82
The cost performance and causes of overruns in infrastructure development projects in Asia
Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., & Zhong, R. (2019) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2019.8646 · Cited by 61
Investigating cost overruns and delay in urban construction projects in Iran
Heravi, G., & Mohammadian, M. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2019.1601394 · Cited by 61
“Linear regression, as the most common analysis, used previously by many research in this field, such as Shehu et al. (2014), Jørgensen et al. (2012) and Park and Papadopoulou (2012).”
BackgroundMethodBIM-based traffic analysis and simulation at road intersection design
Castañeda, K., Sánchez, O., Herrera, R. F., Pellicer, E., & Porras-Díaz, H. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103911 · Cited by 60
Low estimates – high stakes: underestimation of costs at the front-end of projects
Andersen, B. S., Samset, K., & Welde, M. (2015) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-01-2015-0008 · Cited by 78
Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management
Khalfan, M., Azizi, N., Haass, O., Maqsood, T., & Ahmed, I. (2022) · Sustainability · doi:10.3390/su14105791 · Cited by 57
“Fast inspection: Slow inspection is one of the managerial problems and one of the causes of project delays [32,36].”
BackgroundInfluentialGhazal, M. M., & Hammad, A. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2020.1738205 · Cited by 52
Siemiatycki, M. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.07.003 · Cited by 49
Odeck, J. (2017) · Transportation · doi:10.1007/s11116-017-9836-5 · Cited by 58
A Study on Factors Causing Cost Overrun of Construction Projects in Sarawak, Malaysia
Kamaruddeen, A. M., Sung, C. F., & Wahi, W. (2020) · Civil Engineering and Architecture · doi:10.13189/cea.2020.080301 · Cited by 62
Causes of time and cost overruns in construction projects: a scoping review
Cabrera, A. G., Gutierrez-Bucheli, L. A., & Muñoz, S. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2252288 · Cited by 79
“To illustrate, Park and Papadopoulou (2012) collected information about 35 transport infrastructure projects completed between 1983 and 2010 in Asia.”
BackgroundMethodInfluentialBelay, S. M., Tilahun, S. A., Yehualaw, M. D., Matos, J. C., Sousa, H. S., & Workneh, E. T. (2021) · Advances in Civil Engineering · doi:10.1155/2021/4991204 · Cited by 67
“Consultant Clear and detailed drawings and specification [7, 22, 26] Competency and experience of the consulting firm [20, 25] Availability of database for historical cost data [21] Accuracy and reliability of cost related information [22, 23] Project’s team experience on project type [9, 21] Completeness of cost info…”
BackgroundInfluentialSantoso, D. S., & Gallage, P. G. M. P. (2019) · Journal of Engineering Design and Technology · doi:10.1108/jedt-05-2019-0130 · Cited by 62
Critical success factors for Kaizen implementation in the Nigerian construction industry
Omotayo, T., Kulatunga, U., & Bjeirmi, B. (2018) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-11-2017-0296 · Cited by 50
Mahmud, A. T., Ogunlana, S. O., & Hong, W. T. (2021) · Journal of Engineering Design and Technology · doi:10.1108/jedt-05-2020-0171 · Cited by 50
Love, P. E. D., Pinto, J. K., & Ika, L. A. (2022) · IEEE Engineering Management Review · doi:10.1109/emr.2022.3219362 · Cited by 33
“Contrastingly, within the field of construction and engineering management, the difference between contract award and final construction costs is typically adopted [10], [11], [12], [13], [14], [15].”
BackgroundIdentification of Factors Affecting the Performance of Rural Road Projects in Colombia
Cabrera, A. G., Sanz-Benlloch, A., Montalbán-Domingo, L., Ponz‐Tienda, J. L., & Pellicer, E. (2020) · Sustainability · doi:10.3390/su12187377 · Cited by 32
Canesi, R., & Gallo, B. (2023) · Land · doi:10.3390/land13010041 · Cited by 38
Moschouli, E., Soecipto, R. M., & Vanelslander, T. (2019) · Research in Transportation Economics · doi:10.1016/j.retrec.2019.02.004 · Cited by 28
“(2004) (see also Akinsola et al., 1997; Belout, 1998; Chua et al., 1999; Songer & Molenaar, 1997; Park and Papadopoulou, 2012) Infrastructure in general Infrastructure in general Projects in general Infrastructure in general Infrastructure in general Transport Infrastructure Previous PPP experience Hammami et al.”
BackgroundPreparing a framework for two-stage target-cost arrangement formulation
Lahdenperä, P. (2015) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-07-2015-0049 · Cited by 24
Cofinancing and infrastructure project outcomes in Chinese lending and overseas development finance
Lu, Y., Springer, C., & Steffen, B. (2023) · World Development · doi:10.1016/j.worlddev.2023.106473 · Cited by 27
Lahdenperä, P. (2013) · Journal of Public Procurement · doi:10.1108/jopp-13-04-2013-b001 · Cited by 25
Love, P. E. D., Ika, L. A., Matthews, J., & Fang, W. (2021) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2021.3094511 · Cited by 22
“issue of a final account [46], [70], [87], [106], [107].”
BackgroundMuianga, E. A. D., Granja, A. D., & Ruiz, J. D. A. (2015) · Ambiente Construído · doi:10.1590/s1678-86212015000100008 · Cited by 49
Mathew, S. A., Tran, D. Q., & Nguyen, P. H. D. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002078 · Cited by 17
Factors affecting the selection of effective cost control techniques in the UK construction industry
Oyegoke, A. S., Powell, R., Ajayi, S. O., Godawatte, G. A. G. R., & Akenroye, T. O. (2021) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-07-2020-0050 · Cited by 26
Kakar, A. S., Hasan, A., Jha, K. N., & Singh, A. (2022) · Journal of Engineering Design and Technology · doi:10.1108/jedt-11-2021-0657 · Cited by 15
A review on causes of cost overrun in the construction projects
M., F. A. A., Bahamid, R. A., Doh, S. I., Rahimi, A. R. A., Saad, M., & Suil, A. (2019) · UMP Institutional Repository (Universiti Malaysia Pahang) · Cited by 14
Causes of Cost Overruns in Public Sector Construction Projects in South Africa
Khabisi, J., Aigbavboa, C. O., & Thwala, W. D. (2017) · International Conference on Construction and Real Estate Management (ICCREM) · doi:10.1061/9780784480274.162 · Cited by 15
Mahmud, A. T., Ogunlana, S. O., & Hong, W. T. (2021) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-07-2020-0051 · Cited by 12
Entropy-Based Risk Control of Geological Disasters in Mountain Tunnels under Uncertain Environments
Xia, Y., Xiong, Z., Wen, Z., Lu, H., & Dong, X. (2018) · Entropy · doi:10.3390/e20070503 · Cited by 12
“Due to the widespread existence of various types of risks mentioned above, overruns and delays are widespread in tunnel engineering [12,13].”
BackgroundGopal, S., Sambasivan, M., & Viswanathan, K. K. (2020) · Built Environment Project and Asset Management · doi:10.1108/bepam-07-2020-0118 · Cited by 14
The accuracy of benefit-cost analysis for transport projects supported by the Asian Development Bank
Wang, Y., & Levinson, D. M. (2023) · Asian Transport Studies · doi:10.1016/j.eastsj.2023.100104 · Cited by 20
Badawy, M. (2021) · Journal of Engineering Design and Technology · doi:10.1108/jedt-09-2020-0383 · Cited by 11
Albtoush, A. M. F., Doh, S. I., & Rahman, R. A. (2021) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/682/1/012019 · Cited by 11
“Park and Papadopoulou [15] pointed out that cost overrun is defined to be additional expenditure beyond the amount negotiated between the owner and the contractor expended in each project.”
BackgroundDrivers of cost and time overruns: A client and contractor perspective
Dahlin, P., & Pesämaa, O. (2021) · Organization Technology and Management in Construction An International Journal · doi:10.2478/otmcj-2021-0006 · Cited by 10
“Cost overruns for infrastructure projects in Asia range from 2% to 98% (Park and Papadopoulou 2012).”
BackgroundDo Longer Projects Have Larger Cost Deviation Than Shorter Construction Projects?
Belay, A. M., & Torp, O. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.07.198 · Cited by 10
Determining Cost and Causes of Overruns in Infrastructure Projects in South Asia
Andrić, J. M., Lin, S., Cheng, Y., & Sun, B. (2024) · Sustainability · doi:10.3390/su162411159 · Cited by 14
Review: Risk assessment of infrastructure projects on project cost
Liew, K. T., Low, W. W., Wong, K. S., & Wong, S. Y. (2019) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/495/1/012088 · Cited by 9
Analysis of Critical Delay Factors in Construction Projects with a Focus on Qatar
Alsulaiti, A. A., & Kerbache, L. (2020) · International Journal of Business and Economics Research · doi:10.11648/j.ijber.20200903.16 · Cited by 9
“A 2012 study by Papadopoulou and Park [12] on the causes of cost overruns in a large transport infrastructure project in Asia revealed that, in addition to the significance of project size, awarding contracts to the lowest bidder, site conditions, and incompetent subcontractors were the top three causes of cost overru…”
BackgroundInvestigation of the Use of Lean Construction Practices in Transportation Construction Projects
Heet, M. R. A. H. A., Alves, T. D. C. L., & Lakrori, N. (2020) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2020/0121 · Cited by 9
Access-based land value appreciation for assessing project benefits
Wang, Y., & Levinson, D. M. (2023) · Journal of Transport and Land Use · doi:10.5198/jtlu.2023.2297 · Cited by 8
The influence of project team relationships on cost growth
Dada, M. O. (2014) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-02-2013-0004 · Cited by 10
COST OVERRUN GAP ANALYSIS IN CONSTRUCTION PROJECTS: STATE -OF-THE-ART
Abdel-Monem, M., El-Mohr, A.-R., & El-Dash, K. M. (2022) · Engineering Research Journal - Faculty of Engineering (Shoubra) · doi:10.21608/erjsh.2022.249998 · Cited by 8
Mhando, Y. B., Mlinga, R. S., & Alinaitwe, H. M. (2018) · American journal of civil engineering and architecture · doi:10.12691/ajcea-6-3-3 · Cited by 8
“Park and Papadopoulou [5] argue that changes can lead to deviations from the sum stipulated in the contract.”
BackgroundInvestigation of critical factors influencing construction of airports: the case of India
Bhavsar, V., Alex, S. T., Vaishnav, P. K., Jose, A., Koshy, N. G., & Atiwadkar, S. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1831220 · Cited by 7
“Park and Papadopoulou (2012) concluded that awarding contracts to the lowest bidders and the poor managerial practices in Asia are some of the major factors that lead to cost overruns.”
BackgroundShugran, A. A., & Ghazali, F. E. M. (2024) · International Journal of Construction Management · doi:10.1080/15623599.2024.2337238 · Cited by 7
“Park and Papadopoulou (2012) studied the factors contributing to cost losses in transport infrastructure projects in Asia.”
A study and identification of the time and cost overrun in the construction project
Chandragiri, A. B., Jeelani, S. H., Akthar, S., & Lingeshwaran, N. (2021) · Materials Today Proceedings · doi:10.1016/j.matpr.2021.06.268 · Cited by 6
Effect of the Political Environment on Public Private Partnership Projects
Vadali, N., Tiwari, A. P., & Thillai Rajan, A. (2014) · Journal of Infrastructure Development · doi:10.1177/0974930614564651 · Cited by 6
“Papadopoulou (2012) studied the reasons for cost overruns in transport infrastructure projects in Asia, using questionnaire surveys and case data from 35 projects in 12 countries.”
BackgroundRisk assessment of time and cost overrun factors throughout construction project lifecycle
Ismail, I. (2014) · UTHM Institutional Repository (Universiti Tun Hussein Onn Malaysia) · Cited by 6
Danisworo, B., & Latief, Y. (2019) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/258/1/012049 · Cited by 5
Atapattu, C. N., Domingo, N., & Sutrisna, M. (2023) · Built Environment Project and Asset Management · doi:10.1108/bepam-07-2022-0105 · Cited by 9
Cabrera, A. G., Cortés, S., Rojas, J., Sánchez, O., & Torres, A. (2025) · Buildings · doi:10.3390/buildings15203739 · Cited by 7
Quintero, J., Murgas, A., Cabrera, A. G., & Sánchez, O. (2025) · Infrastructures · doi:10.3390/infrastructures10070178 · Cited by 6
Unearthing Causative Factors of Cost Overrun on Ghanaian Road Projects
Akinradewo, O. I., Aigbavboa, C. O., Oke, A. E., Coffie, G. H., & Ogunbayo, B. F. (2022) · The Baltic Journal of Road and Bridge Engineering · doi:10.7250/bjrbe.2022-17.584 · Cited by 8
Cost overrun factors in pre-contract and post-contract stages: A critical analysis
Ariyawansha, C., & Francis, M. (2022) · World Construction Symposium (WCS) · doi:10.31705/wcs.2022.22 · Cited by 3
Iglesias, G. A., Fernández, F. O., Montequín, V. R., Skitmore, M., & Ogunmakinde, O. E. (2023) · Buildings · doi:10.3390/buildings13102626 · Cited by 3
Assessment of Cost Influences in Rail Projects from Contractor's Perspectives
Ismail, M. Z., Ramly, Z. M., Maaz, Z. N., & Rahim, F. N. A. (2023) · International Journal of Built Environment and Sustainability · doi:10.11113/ijbes.v11.n1.1204 · Cited by 4
Cabrera, A. G., León, L. C., Lopez, M. L., & Torres, A. (2025) · Buildings · doi:10.3390/buildings15193505 · Cited by 4
Belihu, K. T., Woldesenbet, A. K., Shiferaw, A. T., Wubet, W. A., & Taffese, W. Z. (2026) · Eng—Advances in Engineering · doi:10.3390/eng7020079 · Cited by 2
Reliability of Cost Data for Detailed Construction Cost Estimating in Egypt
El-Mohr, A.-R., Abdel-Monem, M., & El-Dash, K. M. (2022) · Engineering Research Journal - Faculty of Engineering (Shoubra) · doi:10.21608/erjsh.2022.252300 · Cited by 2
“They concluded that 28 to 100 percent of the projects analyzed had cost overruns up to 183 percent of the initial cost estimate [14], [16], [17], [18], [19].”
BackgroundJagannathan, M., & Delhi, V. S. K. (2023) · Built Environment Project and Asset Management · doi:10.1108/bepam-08-2022-0128 · Cited by 3
Sassano, G. (2025) · Project Leadership and Society · doi:10.1016/j.plas.2025.100177 · Cited by 4
Chen, L., & Pan, W. (2017) · Springer eBooks · doi:10.1007/978-981-10-6190-5_20 · Cited by 2
Sensitivity Analysis of Key Cost Performance Determinants Using Extreme Bound Analysis Method
Kermanshachi, S., & Pamidimukkala, A. (2022) · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction · doi:10.1061/(asce)la.1943-4170.0000570 · Cited by 2
Monyane, T. G. (2013) · Cited by 1
Cost sustainability management through Risk and Probability Assessment
Canesi, R., Ruggeri, A. G., Gabrielli, L., & Marella, G. (2024) · Procedia Structural Integrity · doi:10.1016/j.prostr.2024.09.175 · Cited by 1
Application of Time Reserves for Risk Management in Design
Геннадьевна, М. Г., & Pavlov, A. (2022) · Lecture notes in civil engineering · doi:10.1007/978-3-030-96206-7_41 · Cited by 1
OPTIMISM BIAS, PATHOGENS AND COST OVERRUN: THE CASE OF AN RTS PROJECT IN SOUTH AFRICA
Emuze, F. A., & Ravu, P. (2014)
Mhando, Y. B., Mlinga, R. S., & Alinaitwe, H. M. (2017) · IOSR Journal of Mechanical and Civil Engineering · doi:10.9790/1684-1403011525
“These changes can lead to deviations from the sum stipulated in the contract [18].”
BackgroundAN ASSESSMENT OF CONSTRUCTION PROJECTS COST OVERRUNS IN THE PUBLIC SECTOR
Khabisi, J., Aigbavboa, C. O., & Thwala, W. D. (2016) · Proceedings of International Structural Engineering and Construction · doi:10.14455/isec.res.2016.176
“Cost overruns have negative impact on all parties involved in the project for example the client loses trust on the design team and the design team earns bad reputation (Park and Papadopoulou 2012).”
BackgroundNiekerk, C. V. (2020) · Open University of Cape Town (University of Cape Town)
Investigating Construction Activity, Using Network Analysis Like the Critical Path Method (CMP)
Isa, M. S., Maijamaá, B., & Modu, B. (2022) · Lloyd Business Review · doi:10.56595/lbr.v1i1.3
“Factors are identified which include financial factors, poor contract management, availability of material and equipment, change in decision from the owner poor process of allocation of the project (Mahamid et al., 2012; Park & Papadopoulou, 2012).”
BackgroundAn Assessment of Budget Overruns in Road Infrastructure Projects: A Case Study of Roads in Ndola
Kelvin, C., & Chipandwe, L. S. (2025) · doi:10.38124/ijisrt/25jun1308
Nguyen, T. A., & Vo, L. T. (2025) · Lecture notes in networks and systems · doi:10.1007/978-3-032-00450-5_34
Agara, O., Tochukwu, C. A., Emmanuel, O. O., & Agwu, A. K. (2025) · doi:10.38124/ijisrt/25aug1206
A Framework for Mitigating Federal Highway Project Cost Overrun Effects in South East, Nigeria
Agara, O., Emenike, O. F., Chinedu, A., & Kalu, E. I. (2025) · doi:10.38124/ijisrt/25aug1205
Rahman, H. Z., Miraj, P., Prasidha, I. N. T., & Amanda, Y. (2025) · Frontiers in Sustainable Cities · doi:10.3389/frsc.2025.1700900
Jimenez, H. A. F., Cabrera, A. G., Sánchez, O., Gómez, C., & Arrieta, N. (2026) · Case Studies on Transport Policy · doi:10.1016/j.cstp.2026.101748 · Cited by 4
Damasi, A., Mwishwa, Y. H., & Chengula, D. H. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2693882
Berrich, O., Dabbou, H., & Ламари, М. (2026) · European Journal of Sustainable Development Research · doi:10.29333/ejosdr/19150
“More complex projects are associated with greater design uncertainty, higher risks of change orders, and more frequent contractual disputes (Bordat et al., 2004; Park & Papadopoulou, 2012).”
Metadata
- Authors
- Park, Y., & Papadopoulou, T. C.
- Affiliations
- Hyundai Engineering (South Korea) (KR)
- Kingston University London (GB)
- Venue
- Built Environment Project and Asset Management
- Publisher
- Emerald
- Published
- 2012-11-16
- Volume
- 2
- Issue
- 2
- Pages
- 195-216
- ISSN
- 2044-124X (ISSN-L)
- OpenAlex
- W1533006508
- Cited by
- 91
- References
- 56
- Citations by year
- 2026: 4 · 2025: 9 · 2024: 3 · 2023: 9 · 2022: 10 · 2021: 11 · 2020: 10 · 2019: 8 · 2018: 4 · 2017: 7 · 2016: 3 · 2015: 4 · 2014: 7 · 2013: 2
- FWCI
- 5.50
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Built Environment Project and Asset Management (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Business, Management and Accounting › Strategy and Management › Value Engineering and Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
- Keywords
- cost overruns, transport infrastructure, construction projects, project size, fixed-price contracts, contract types, cost escalation, Asia
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.