A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies: Cost overrun in construction projects
Abstract
Purpose In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to review and compile the current AI methods used for cost-risk assessment in the construction management domain in order to capture complexity and risk interdependencies under high uncertainty. Design/methodology/approach This paper makes a content analysis, based on a comprehensive literature review of articles published in high-quality journals from the years 2008 to 2018. Fuzzy hybrid methods, such as fuzzy-analytical network processing, fuzzy-artificial neural network and fuzzy-simulation, have been widely used and dominated in the literature due to their ability to measure the complexity and uncertainty of the system. Findings The findings of this review article suggest that due to the limitation of subjective risk data and complex computation, the applications of these AI methods are limited in order to address cost overrun issues under high uncertainty. It is suggested that a hybrid approach of fuzzy logic and extended form of Bayesian belief network (BBN) can be applied in cost-risk assessment to better capture complexity-risk interdependencies under uncertainty. Research limitations/implications This study only focuses on the subjective risk assessment methods applied in construction management to overcome cost overrun problem. Therefore, future research can be extended to interpret the input data required to deal with uncertainties, rather than relying solely on subjective judgments in risk assessment analysis. Practical implications These results may assist in the management of cost overrun while addressing complexity and uncertainty to avoid chaos in a project. In addition, project managers, experts and practitioners should address the interrelationship between key complexity and risk factors in order to plan risk impact on project cost. The proposed hybrid method of fuzzy logic and BBN can better support the management implications in recent construction risk management practice. Originality/value This study addresses the applications of AI-based methods in complex construction projects. A proposed hybrid approach could better address the complexity-risk interdependencies which increase cost uncertainty in project.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [1]
Citations
Cites
Application of the AHP in project management
Al‐Harbi, K. M. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,141
Overview on Bayesian networks applications for dependability, risk analysis and maintenance areas
Weber, P., Medina-Oliva, G., Simon, C., & Iung, B. (2010) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2010.06.002 · Cited by 769
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Parn, E. A., & Edwards, D. J. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 732
What Causes Cost Overrun in Transport Infrastructure Projects?
Flyvbjerg, B., Holm, M. S., & Buhl, S. L. (2004) · Transport Reviews · doi:10.1080/0144164032000080494a · Cited by 649
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 579
Criteria in AHP: A Systematic Review of Literature
Russo, R. D. F. S. M., & Camanho, R. (2015) · Procedia Computer Science · doi:10.1016/j.procs.2015.07.081 · Cited by 536
A review of application of multi-criteria decision making methods in construction
Jato‐Espino, D., López, E. C., Rodríguez-Hernández, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 512
Quantitative risk analysis of offshore drilling operations: A Bayesian approach
Khakzad, N., Khan, F. I., & Amyotte, P. R. (2013) · Safety Science · doi:10.1016/j.ssci.2013.01.022 · Cited by 403
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, İ., Birgönül, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 376
Research works printed but not linked: 7
- 2013, Managing the Continuum: Certainty, Uncertainty, Unpredictability in Large Engineering Projects
- 2016, Managing Complex, High Risk Projects
- 2013, Decision Making with the Analytic Network Process
- 2015, Risk analysis at the edge of chaos, Cost Engineering, 57, 28
- 2016, Risk and stakeholder management tools, Project Management ToolBox, 182, 351
- 2014, Risk Management for Engineering Projects
- 2003, The Analytic Hierarchy Process (AHP) for Decision Making and the Analytic Network Process (ANP) for Decision Making with Dependence and Feedback, Creative Decisions Foundation
Cited by
Sorted by citations
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Opportunities and Adoption Challenges of AI in the Construction Industry: A PRISMA Review
Regona, M., Yiğitcanlar, T., Xia, B., & Li, R. Y. M. (2022) · Journal of Open Innovation Technology Market and Complexity · doi:10.3390/joitmc8010045 · Cited by 696
Popescu, S. M., Mansoor, S., Wani, O. A., Kumar, S. S., Sharma, V., Sharma, A., Arya, V. M., Kirkham, M. B., Hou, D., Bolan, N., et al. (2024) · Frontiers in Environmental Science · doi:10.3389/fenvs.2024.1336088 · Cited by 246
Artificial Intelligence Enabled Project Management: A Systematic Literature Review
Taboada, I., Daneshpajouh, A., Toledo, N., & de Vass, T. (2023) · Applied Sciences · doi:10.3390/app13085014 · Cited by 373
Ghimire, P., Kim, K., & Acharya, M. (2024) · Buildings · doi:10.3390/buildings14010220 · Cited by 175
Metadata
- Authors
- Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M.
- Affiliations
- University of Electronic Science and Technology of China (CN)
- University of the Punjab (PK)
- University of Engineering and Technology Lahore (PK)
- Corresponding author
- Afzal, Farman
- Venue
- International Journal of Managing Projects in Business
- Publisher
- Emerald
- Published
- 2019-09-24
- Volume
- 14
- Issue
- 2
- Pages
- 300-328
- ISSN
- 1753-8378 (ISSN-L)
- OpenAlex
- W2980412932
- Cited by
- 172
- References
- 154
- Citations by year
- 2026: 40 · 2025: 47 · 2024: 32 · 2023: 21 · 2022: 22 · 2021: 6 · 2020: 4
- FWCI
- 5.73
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Managing Projects in Business (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- construction risk management, cost risk assessment, cost overruns, artificial intelligence, fuzzy logic, fuzzy neural network, fuzzy simulation, Bayesian networks, uncertainty, hybrid algorithm, subjective risk assessment
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review