A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies: Cost overrun in construction projects
Abstract
Purpose In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to review and compile the current AI methods used for cost-risk assessment in the construction management domain in order to capture complexity and risk interdependencies under high uncertainty. Design/methodology/approach This paper makes a content analysis, based on a comprehensive literature review of articles published in high-quality journals from the years 2008 to 2018. Fuzzy hybrid methods, such as fuzzy-analytical network processing, fuzzy-artificial neural network and fuzzy-simulation, have been widely used and dominated in the literature due to their ability to measure the complexity and uncertainty of the system. Findings The findings of this review article suggest that due to the limitation of subjective risk data and complex computation, the applications of these AI methods are limited in order to address cost overrun issues under high uncertainty. It is suggested that a hybrid approach of fuzzy logic and extended form of Bayesian belief network (BBN) can be applied in cost-risk assessment to better capture complexity-risk interdependencies under uncertainty. Research limitations/implications This study only focuses on the subjective risk assessment methods applied in construction management to overcome cost overrun problem. Therefore, future research can be extended to interpret the input data required to deal with uncertainties, rather than relying solely on subjective judgments in risk assessment analysis. Practical implications These results may assist in the management of cost overrun while addressing complexity and uncertainty to avoid chaos in a project. In addition, project managers, experts and practitioners should address the interrelationship between key complexity and risk factors in order to plan risk impact on project cost. The proposed hybrid method of fuzzy logic and BBN can better support the management implications in recent construction risk management practice. Originality/value This study addresses the applications of AI-based methods in complex construction projects. A proposed hybrid approach could better address the complexity-risk interdependencies which increase cost uncertainty in project.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [1]
Citations
Cites
Application of the AHP in project management
Al‐Harbi, K. M. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,141
Overview on Bayesian networks applications for dependability, risk analysis and maintenance areas
Weber, P., Medina-Oliva, G., Simon, C., & Iung, B. (2010) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2010.06.002 · Cited by 769
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Parn, E. A., & Edwards, D. J. (2018) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 732
What Causes Cost Overrun in Transport Infrastructure Projects?
Flyvbjerg, B., Holm, M. S., & Buhl, S. L. (2004) · Transport Reviews · doi:10.1080/0144164032000080494a · Cited by 649
Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Taylan, O., Bafail, A. O., Abdulaal, R. M. S., & Kabli, M. R. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.01.003 · Cited by 579
Criteria in AHP: A Systematic Review of Literature
Russo, R. D. F. S. M., & Camanho, R. (2015) · Procedia Computer Science · doi:10.1016/j.procs.2015.07.081 · Cited by 536
A review of application of multi-criteria decision making methods in construction
Jato‐Espino, D., López, E. C., Rodríguez-Hernández, J., & Canteras-Jordana, J. C. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.013 · Cited by 512
Quantitative risk analysis of offshore drilling operations: A Bayesian approach
Khakzad, N., Khan, F. I., & Amyotte, P. R. (2013) · Safety Science · doi:10.1016/j.ssci.2013.01.022 · Cited by 403
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, İ., Birgönül, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 376
Research works printed but not linked: 7
- 2013, Managing the Continuum: Certainty, Uncertainty, Unpredictability in Large Engineering Projects
- 2016, Managing Complex, High Risk Projects
- 2013, Decision Making with the Analytic Network Process
- 2015, Risk analysis at the edge of chaos, Cost Engineering, 57, 28
- 2016, Risk and stakeholder management tools, Project Management ToolBox, 182, 351
- 2014, Risk Management for Engineering Projects
- 2003, The Analytic Hierarchy Process (AHP) for Decision Making and the Analytic Network Process (ANP) for Decision Making with Dependence and Feedback, Creative Decisions Foundation
Cited by
Sorted by citations
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Opportunities and Adoption Challenges of AI in the Construction Industry: A PRISMA Review
Regona, M., Yiğitcanlar, T., Xia, B., & Li, R. Y. M. (2022) · Journal of Open Innovation Technology Market and Complexity · doi:10.3390/joitmc8010045 · Cited by 696
Popescu, S. M., Mansoor, S., Wani, O. A., Kumar, S. S., Sharma, V., Sharma, A., Arya, V. M., Kirkham, M. B., Hou, D., Bolan, N., et al. (2024) · Frontiers in Environmental Science · doi:10.3389/fenvs.2024.1336088 · Cited by 246
Artificial Intelligence Enabled Project Management: A Systematic Literature Review
Taboada, I., Daneshpajouh, A., Toledo, N., & de Vass, T. (2023) · Applied Sciences · doi:10.3390/app13085014 · Cited by 373
Ghimire, P., Kim, K., & Acharya, M. (2024) · Buildings · doi:10.3390/buildings14010220 · Cited by 175
A Scientometric Analysis and Systematic Literature Review for Construction Project Complexity
Ghaleb, H., Alhajlah, H. H., Abdullah, A. A., Kassem, M. A., & Al-Sharafi, M. A. (2022) · Buildings · doi:10.3390/buildings12040482 · Cited by 127
Nenni, M. E., Felice, F. D., Luca, C. D., & Forcina, A. (2024) · Management Review Quarterly · doi:10.1007/s11301-024-00418-z · Cited by 102
Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review
Ali, K. N., Alhajlah, H. H., & Kassem, M. A. (2022) · Buildings · doi:10.3390/buildings12050571 · Cited by 120
Müller, R., Locatelli, G., Holzmann, V., Nilsson, M., & Sagay, T. (2024) · Project Management Journal · doi:10.1177/87569728231225198 · Cited by 89
Alsulamy, S. H. (2024) · Expert Systems with Applications · doi:10.1016/j.eswa.2024.126268 · Cited by 94
Khodabakhshian, A., Puolitaival, T., & Kestle, L. (2023) · Buildings · doi:10.3390/buildings13051312 · Cited by 100
Wang, K., Ying, Z., Goswami, S. S., Yin, Y., & Zhao, Y. (2023) · Sustainability · doi:10.3390/su151511848 · Cited by 76
The Expectations of Project Managers from Artificial Intelligence: A Delphi Study
Holzmann, V., Zitter, D., & Peshkess, S. (2022) · Project Management Journal · doi:10.1177/87569728211061779 · Cited by 80
Assessing the Accuracy of ChatGPT Use for Risk Management in Construction Projects
Aladağ, H. (2023) · Sustainability · doi:10.3390/su152216071 · Cited by 74
Exploring the Readiness of Organisations to Adopt Artificial Intelligence
Felemban, H., Sohail, M., & Ruikar, K. D. (2024) · Buildings · doi:10.3390/buildings14082460 · Cited by 84
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65
A review of LLMs and their applications in the architecture, engineering and construction industry
Kampelopoulos, D., Tsanousa, A., Vrochidis, S., & Kompatsiaris, I. (2025) · Artificial Intelligence Review · doi:10.1007/s10462-025-11241-7 · Cited by 69
Reality Capture in Construction Project Management: A Review of Opportunities and Challenges
Fobiri, G., Musonda, I., & Muleya, F. (2022) · Buildings · doi:10.3390/buildings12091381 · Cited by 68
Predictive risk modeling for major transportation projects using historical data
Erfani, A., & Cui, Q. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104301 · Cited by 58
Ghorbany, S., Yousefi, S., & Noorzai, E. (2022) · Engineering Construction & Architectural Management · doi:10.1108/ecam-05-2022-0492 · Cited by 56
A Scientometric Analysis of Studies on Risk Management in Construction Projects
Osei‐Kyei, R., Narbaev, T., & Ampratwum, G. (2022) · Buildings · doi:10.3390/buildings12091342 · Cited by 51
Construction risk management research: intellectual structure and emerging themes
Zhao, X. (2023) · International Journal of Construction Management · doi:10.1080/15623599.2023.2167303 · Cited by 68
Exploring the Relationship between Complexity and Risk in Megaconstruction Projects
Erol, H., Dikmen, İ., Atasoy, G., & Birgönül, M. T. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001946 · Cited by 53
Application of Artificial Intelligence in the Oil and Gas Industry
Hussain, M. N., Alamri, A. H., Zhang, T., & Jamil, I. (2024) · Synthesis lectures on engineering, science, and technology · doi:10.1007/978-3-031-50300-9_19 · Cited by 48
RETRACTED: Future of process safety: Insights, approaches, and potential developments
Abedsoltan, H., Abedsoltan, A., & Zoghi, Z. (2024) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2024.03.034 · Cited by 48
RetractedKhalid, J., Mi, C., Altaf, F., Shafqat, M. M., Khan, S. K., & Ashraf, M. U. (2024) · Sustainability · doi:10.3390/su16166799 · Cited by 64
Isah, M. A., & Kim, B.-S. (2024) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-15230 · Cited by 51
Junjia, Y., Alias, A. H., Haron, N. A., & Bakar, N. A. (2023) · Sustainability · doi:10.3390/su151511803 · Cited by 40
Applications of fuzzy hybrid techniques in construction engineering and management research
Nguyen, P. H. D., & Fayek, A. R. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.104064 · Cited by 40
Belay, S. M., Tilahun, S. A., Yehualaw, M. D., Matos, J. C., Sousa, H. S., & Workneh, E. T. (2021) · Advances in Civil Engineering · doi:10.1155/2021/4991204 · Cited by 39
Afrazi, M., Armaghani, D. J., Afrazi, H., Fattahi, H., & Samui, P. (2025) · Deep Underground Science and Engineering · doi:10.1002/dug2.70029 · Cited by 36
Martin, H. G., James, J., & Chadee, A. A. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-16658 · Cited by 35
Lillywhite, B., & Wolbring, G. (2022) · Sustainability · doi:10.3390/su15010387 · Cited by 41
Unsupervised machine learning for project stakeholder classification: Benefits and limitations
Mariani, C., Navrotska, Y., & Mancini, M. (2023) · Project Leadership and Society · doi:10.1016/j.plas.2023.100093 · Cited by 30
Canesi, R., & Gallo, B. (2023) · Land · doi:10.3390/land13010041 · Cited by 27
Mohamed, M. A., Al-Mhdawi, M. K. S., Ojiako, U., Dacre, N., Qazi, A. J., & Rahimian, F. P. (2025) · Urbanization, sustainability and society. · doi:10.1108/uss-11-2024-0069 · Cited by 32
Fernández, J. M. M., Moreno, J. J. G., Vergara-González, E. P., & Iglesias, G. A. (2022) · Applied Sciences · doi:10.3390/app122211743 · Cited by 30
Kaushik, A. K., Islam, R., ElBahy, S., Arif, M., Arsalan, H., Alhorr, Y. M., Obi, L. I., & Rana, M. (2024) · Buildings · doi:10.3390/buildings14082423 · Cited by 23
Bayesian networks in project management: A scoping review
Guinhouya, K. A. (2022) · Expert Systems with Applications · doi:10.1016/j.eswa.2022.119214 · Cited by 20
A Mixed Review of Cash Flow Modeling: Potential of Blockchain for Modular Construction
Assaf, M., Hussein, M., Alsulami, B. T., & Zayed, T. M. (2022) · Buildings · doi:10.3390/buildings12122054 · Cited by 20
An analytical model for budget allocation in risk prevention and risk protection
Guan, X., Servranckx, T., & Vanhoucke, M. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107657 · Cited by 20
Ali, A., Xue, X., Wang, N., Yin, X., & Tariq, H. (2024) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-11-2023-0253 · Cited by 18
Almashhour, R., Al-Mhdawi, M. K. S., Daghfous, A., Qazi, A. J., & Ojiako, U. (2025) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-01-2025-0021 · Cited by 28
Prioritization of interdependent uncertainties in projects
Qazi, A. J., Dikmen, İ., & Birgönül, M. T. (2020) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-10-2019-0253 · Cited by 17
Hettrich, B., Krings, N., & Kock, A. (2025) · Creativity and Innovation Management · doi:10.1111/caim.70002 · Cited by 21
Secundo, G., Mele, G., Passıante, G., & Ligorio, A. (2023) · European Journal of Innovation Management · doi:10.1108/ejim-11-2022-0656 · Cited by 20
Madihi, M. H., Javid, A. A. S., & Nasirzadeh, F. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2023-0774 · Cited by 16
Development of Risk Quantification Models in Road Infrastructure Projects
Senić, A., Đobrodolac, M., & Stojadinović, Z. (2024) · Sustainability · doi:10.3390/su16177694 · Cited by 26
Senić, A., Đobrodolac, M., & Stojadinović, Z. (2024) · Mathematics · doi:10.3390/math12182852 · Cited by 15
Senić, A., Simić, N., Đobrodolac, M., & Stojadinović, Z. (2025) · Applied Sciences · doi:10.3390/app15052736 · Cited by 25
Quality assessment of enterprise risk management programs
Qazi, A. J., & Simsekler, M. C. E. (2021) · Journal of Risk Research · doi:10.1080/13669877.2021.1913633 · Cited by 14
Critical risk factors for construction supply chain in China: a fuzzy synthetic evaluation analysis
Deng, B.-C., Lv, X., Du, Y., Li, X., & Yin, Y. (2023) · Engineering Construction & Architectural Management · doi:10.1108/ecam-12-2022-1158 · Cited by 14
Assessing the impact of artificial intelligence on project efficiency enhancement
Kozhakhmetova, A. K., Mamyrbayev, A., Zhidebekkyzy, A., & Bilan, S. (2024) · Knowledge and Performance Management · doi:10.21511/kpm.08(2).2024.09 · Cited by 18
AI, machine learning and deep learning in cyber risk management
Hamid, I., & Rahman, M. M. H. (2025) · Discover Sustainability · doi:10.1007/s43621-025-01012-3 · Cited by 22
Role of Artificial Intelligence in Construction Project Management
Korke, P., Ravindran, G., Shewale, M., & Khartode, B. (2023) · E3S Web of Conferences · doi:10.1051/e3sconf/202340504012 · Cited by 13
Boamah, F. A., Jin, X., Senaratne, S., & Perera, S. (2025) · Infrastructures · doi:10.3390/infrastructures10020035 · Cited by 13
Network analysis-enhanced project risk management for nuclear power plant construction
Casotti, A. L. N., & Zio, E. (2025) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2025.111269 · Cited by 13
A Fuzzy Logic Application to Manage Construction-Cost Escalation
Canesi, R., & D’Alpaos, C. (2024) · Buildings · doi:10.3390/buildings14093015 · Cited by 12
A hierarchical k-out-of-n optimization model for enhancing reliability of fire alarm systems
Baladeh, A. E., & Taghipour, S. (2024) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2024.08.091 · Cited by 11
Cerezo-Narváez, A., Pastor-Fernández, A., Otero-Mateo, M., & Ballesteros‐Pérez, P. (2022) · Sustainability · doi:10.3390/su14159711 · Cited by 11
Farahani, A. F., Didehkhani, H., Khalili‐Damghani, K., Sarfaraz, A. H., & Hajirezaie, M. (2021) · Journal of Modelling in Management · doi:10.1108/jm2-07-2020-0180 · Cited by 11
Tang, X., Wang, M., Wang, Q., Zhang, J., Li, H., & Tang, J. (2022) · Computational Intelligence and Neuroscience · doi:10.1155/2022/9598781 · Cited by 11
Selvakumar, P., Haashni, S., SudhaAnanthi, G., & Manjunath, T. C. (2025) · IGI Global eBooks · doi:10.4018/979-8-3373-2484-5.ch004 · Cited by 10
Aamer, A. M., Zadeh, A., Mali, P., & Bolick, C. (2024) · Management Review Quarterly · doi:10.1007/s11301-024-00419-y · Cited by 10
THE BENEFITS OF ARTIFICIAL INTELLIGENCE IN CONSTRUCTION PROJECTS
Elfargani, M. S. Y., & ., E. (2022) · Acta Informatica Malaysia · doi:10.26480/aim.02.2022.47.51 · Cited by 9
A Review of the Effects of Project Management Practices on Cost Overrun in Construction Projects
Shah, F. H., Bhatti, O. S., & Ahmed, S. (2023) · doi:10.3390/engproc2023044001 · Cited by 9
Acheampong, A., Adjei, E. K., Asiedu, R. O., Atibila, D. W., & Abu, I. M. (2025) · Journal of Engineering Design and Technology · doi:10.1108/jedt-03-2024-0186 · Cited by 9
Structuring risks for a comprehensive understanding of cost overruns in power plant projects
Islam, M. S., Nepal, M. P., & Skitmore, M. (2023) · Construction Innovation · doi:10.1108/ci-05-2022-0120 · Cited by 9
Luo, Y., & Chen, Y. (2024) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2024.2396606 · Cited by 8
Cao, Y., Dai, L., Jiang, H., & Waheed, A. (2025) · Corporate Social Responsibility and Environmental Management · doi:10.1002/csr.70055 · Cited by 11
Nguyen, T., Tran, Q. P., Chileshe, N., Huynh, T. Y. T., & Hallo, L. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2022.2117442 · Cited by 8
Dealing with uncertainties in the design phase of road projects
Shabani, R., Malvik, T. O., Johansen, A., & Torp, O. (2022) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2022-0050 · Cited by 8
Governing Ethical Gaps in Distributed AI Development
Swaminathan, N., & Danks, D. J. (2024) · Digital Society · doi:10.1007/s44206-024-00088-0 · Cited by 9
Савин, С. В., & Murzin, A. D. (2025) · Economics and Management · doi:10.35854/1998-1627-2024-12-1521-1534 · Cited by 7
Complex infrastructure systems analysis and management: the theory of faults
Yonat, N., Isaac, S., & Shohet, I. M. (2023) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-07-2023-0167 · Cited by 7
Mejía, G., Gutiérrez-Prada, J. A., Portilla-Carreño, O., & Soto-Paz, J. (2024) · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering · doi:10.1061/ajrua6.rueng-1363 · Cited by 9
MURIA-TARAZON, J.-C., Gutiérrez, J. V. O., Oltra-Badenes, R., & Escobar, S. (2025) · Applied Sciences · doi:10.3390/app15031412 · Cited by 6
Propagation Analysis and Assessment for the Risks in EPC Projects
Zhang, H., & Alhashedi, E. (2025) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-16233 · Cited by 6
Bountakas, P., Fysarakis, K., Kyriakakis, T., Karafotis, P. A., Sotiropoulos, A., Tasouli, M., Alcaraz, C., Alexandris, G., Andronikou, V., Koutsouri, T., et al. (2024) · International Conference on Availability, Reliability and Security (ARES) · doi:10.1145/3664476.3669924 · Cited by 6
Ontology-based automated knowledge identification of safety risks in Metro shield construction
Liu, P., Jin, X., & Shang, Y. (2025) · Journal of Asian Architecture and Building Engineering · doi:10.1080/13467581.2025.2467241 · Cited by 6
Complexity-based risk decision framework for cost overrun using fuzzy Bayesian network
Afzal, F., Afzal, F., Junaid, D., Shah, I. A., & Shao, Y. (2023) · Soft Computing · doi:10.1007/s00500-023-07983-7 · Cited by 6
Self-citationManzur, B. N. Z., Bazán, F. A. E., Hernández, P. N., & Corona, C. A. C. (2024) · Journal of Innovation and Entrepreneurship · doi:10.1186/s13731-024-00396-2 · Cited by 6
The future of Project Management: Insights from the next generation of professionals
Obradovic, V. L., Vukomanović, M., & Todorovic, M. L. (2026) · International Journal of Project Management · doi:10.1016/j.ijproman.2026.102848 · Cited by 5
Data analytics for project delivery: unlocking the potential of an emerging field
Shen, Y., Brookes, N. J., Flores, L. L., & Brettschneider, J. A. (2024) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-08-2023-0180 · Cited by 8
Intelligent Risk Identification in Construction Projects: A Case Study of an AI-Based Framework
Vilibić, K., Sigmund, Z., & Završki, I. (2026) · Buildings · doi:10.3390/buildings16020409 · Cited by 4
Risk prediction for mega construction prediction: a concise review
Qadri, F. H., Sharif, M., & Muddassir, S. M. (2025) · Sustainable and Resilient Infrastructure · doi:10.1080/23789689.2025.2526227 · Cited by 5
Afzal, F., Shehzad, A., Rehman, H. M., Afzal, F., & Mukit, . M. H. (2022) · International Journal of Islamic and Middle Eastern Finance and Management · doi:10.1108/imefm-07-2021-0257 · Cited by 4
Self-citationANN Model for Assessment of Design Changes in Gas–Oil and Petrochemical Projects
Afsharghotli, A., & Yitmen, İ. (2020) · Arabian Journal for Science and Engineering · doi:10.1007/s13369-020-04432-7 · Cited by 4
The Relevance of Artificial Intelligence in Project Management
Posinković, T. O., & Vlahov, R. D. (2024) · Engineering cyber-physical systems and critical infrastructures · doi:10.1007/978-3-031-56322-5_8 · Cited by 4
Wiangkham, A., & Vongvit, R. (2026) · Results in Engineering · doi:10.1016/j.rineng.2026.109128 · Cited by 3
Ullah, S., Deng, X., Amaechi, C. V., Anbar, D. R., & Ashraf, M. W. (2026) · Frontiers in Built Environment · doi:10.3389/fbuil.2025.1677904 · Cited by 3
Ebekozien, A., Afetorgbor, E., Hafez, M., Aigbavboa, C., Nwaole, A., Thwala, W., Samsurijan, M., & Aliu, J. (2026) · Journal of Facilities Management · doi:10.1108/jfm-07-2024-0084 · Cited by 3
Mohamed, M. A. H., Al-Mhdawi, M. K. S., Shadlooye, G., & Ojiako, U. (2026) · Frontiers in Built Environment · doi:10.3389/fbuil.2026.1842237 · Cited by 3
Current status and trends of megaproject research: bibliometric and text mining analysis
Jin, S. (2025) · Engineering Construction & Architectural Management · doi:10.1108/ecam-04-2024-0495 · Cited by 3
Madihi, M. H., Tafazzoli, M., Javid, A. A. S., & Nasirzadeh, F. (2025) · Buildings · doi:10.3390/buildings15111774 · Cited by 3
The Evolution of Technology in Artificial Intelligence and Its Impact on Project Management
Wagner, P., & Wagner, R. (2024) · Engineering cyber-physical systems and critical infrastructures · doi:10.1007/978-3-031-56322-5_19 · Cited by 6
Predicting schedule delays of construction projects in the oil and gas industry: comparative study
Mohammed, A., Bahatheq, A., Ghaithan, A. M., Alshibani, A., Mazher, K. M., & Alrashidi, A. (2025) · Built Environment Project and Asset Management · doi:10.1108/bepam-12-2024-0286 · Cited by 3
Evaluating AI competency in project management: benefits and challenges
Olatoye, O. O. O., & Aminaho, E. N. (2025) · AI & Society · doi:10.1007/s00146-025-02730-y · Cited by 2
Sahu, P., Bera, D. K., Parhi, P. K., Kandpal, M., & Thakur, R. R. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2619678 · Cited by 4
A GenAI-driven risk management framework for sustainable development projects
Mohamed, M. A. H., Al-Mhdawi, M. K. S., Ojiako, U., Qazi, A. J., Mahammedi, C., & Dacre, N. (2026) · Project Leadership and Society · doi:10.1016/j.plas.2026.100217 · Cited by 5
Metadata
- Authors
- Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M.
- Affiliations
- University of Electronic Science and Technology of China (CN)
- University of the Punjab (PK)
- University of Engineering and Technology Lahore (PK)
- Corresponding author
- Afzal, Farman
- Venue
- International Journal of Managing Projects in Business
- Publisher
- Emerald
- Published
- 2019-09-24
- Volume
- 14
- Issue
- 2
- Pages
- 300-328
- ISSN
- 1753-8378 (ISSN-L)
- OpenAlex
- W2980412932
- Cited by
- 172
- References
- 154
- Citations by year
- 2026: 40 · 2025: 47 · 2024: 32 · 2023: 21 · 2022: 22 · 2021: 6 · 2020: 4
- FWCI
- 5.73
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- International Journal of Managing Projects in Business (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- construction risk management, cost risk assessment, cost overruns, artificial intelligence, fuzzy logic, fuzzy neural network, fuzzy simulation, Bayesian networks, uncertainty, hybrid algorithm, subjective risk assessment
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review