The influence of big data analytics management capabilities on supply chain preparedness, alertness and agility: An empirical investigation
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Abstract
Purpose: The importance of big data analytics (BDA) on the development of supply chain (SC) resilience is not clearly understood. To address this, the purpose of this paper is to explore the impact of BDA management capabilities, namely, BDA planning, BDA investment decision making, BDA coordination and BDA control on SC resilience dimensions, namely, SC preparedness, SC alertness and SC agility. Design/methodology/approach: The study relied on perceptual measures to test the proposed associations. Using extant measures, the scales for all the constructs were contextualized based on expert feedback. Using online survey, 249 complete responses were collected and were analyzed using partial least squares in SmartPLS 2.0.M3. The study targeted professionals with sufficient experience in analytics in different industry sectors for survey participation. Findings: Results indicate BDA planning, BDA coordination and BDA control are critical enablers of SC preparedness, SC alertness and SC agility. BDA investment decision making did not have any prominent influence on any of the SC resilience dimensions. Originality/value: The study is important as it addresses the contribution of BDA capabilities on the development of SC resilience, an important gap in the extant literature.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003) · Journal of Applied Psychology · doi:10.1037/0021-9010.88.5.879 · Cited by 82,194
A Paradigm for Developing Better Measures of Marketing Constructs
Churchill, G. A. (1979) · Journal of Marketing Research · doi:10.1177/002224377901600110 · Cited by 16,549
Structural equation models with unobservable variables and measurement error: Algebra and statistics
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800313 · Cited by 13,287 · cited 3×
“Convergent validity was next assessed using multiple criteria: item loading W 0.70 and statistical significance; composite construct reliability W 0.80; and AVE W 0.50 (Fornell and Larcker, 1981).”
MethodInfluentialStrategic assets and organizational rent
Amit, R., & Schoemaker, P. J. H. (1993) · Strategic Management Journal · doi:10.1002/smj.4250140105 · Cited by 8,425 · cited 1×
“Employee skill and talent are usually referred to as intangible resources while firm infrastructure may be undersigned as tangible ones (Amit and Schoemaker, 1993).”
BackgroundTenenhaus, M., Vinzi, V. E., Chatelin, Y.-M., & Lauro, C. (2005) · Computational Statistics & Data Analysis · doi:10.1016/j.csda.2004.03.005 · Cited by 6,312 · cited 1×
“Peng and Lai (2012) recommended the evaluation of a global goodness-of-fit index (Tenenhaus et al. , 2005) for assessing the holistic quality of the proposed model; however, later studies questioned its validity (Henseler and Sarstedt, 2013). ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi p ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi p ffiffiffiffiffiffiffiffiffiffiffi p…”
The resource-based view of the firm: Ten years after 1991
Barney, J., Wright, M., & Ketchen, D. J. (2001) · Journal of Management · doi:10.1177/014920630102700601 · Cited by 3,451 · cited 2×
“RBV explained the difference in firm performance to different resource ownership of firms (Barney et al. , 2001).”
BackgroundThe impact of supply chain integration on performance: A contingency and configuration approach
Flynn, B. B., Huo, B., & Zhao, X. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.06.001 · Cited by 3,310 · cited 2×
“Next, a confirmatory factor analysis to Harman ’ s single-factor model was applied (Flynn et al. , 2010).”
MethodBig data analytics and firm performance: Effects of dynamic capabilities
Wamba, S. F., Gunasekaran, A., Akter, S., Ren, S. J.-F., Dubey, R., & Childe, S. J. (2017) · Journal of Business Research · doi:10.1016/j.jbusres.2016.08.009 · Cited by 2,474
How ‘big data’ can make big impact: findings from a systematic review and a longitudinal case study
Fosso Wamba, S., Akter, S., Edwards, A., Chopin, G., & Gnanzou, D. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.12.031 · Cited by 1,905 · cited 2×
“…extensively attracting research attention for verification of existing theories and also for effective decision making for organizations (Muhtaroglu et al. , 2013), especially in SC management (Wamba et al. , 2015; Wang, Gunasekaran and Ngai, 2016; Wang, Gunasekaran, Ngai and Papadopoulos, 2016).”
BackgroundWang, G., Gunasekaran, A., Ngai, E. W. T., & Papadopoulos, T. (2016) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.03.014 · Cited by 1,545
Peng, D. X., & Lai, F. (2012) · Journal of Operations Management · doi:10.1016/j.jom.2012.06.002 · Cited by 1,532 · cited 7×
“Since significance tests are absent in PLS, a bootstrapping analysis was executed with 1,000 sub-samples (Chin, 1998; Peng and Lai, 2012) for calculating the path coefficient, statistical significance and allied parameters.”
BackgroundMethodInfluentialWaller, M. A., & Fawcett, S. E. (2013) · Journal of Business Logistics · doi:10.1111/jbl.12010 · Cited by 1,522
Hazen, B. T., Boone, C. A., Ezell, J. D., & Jones-Farmer, L. A. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.04.018 · Cited by 863 · cited 2×
“…line with extant literature (Wamba et al. , 2017), BDA management capabilities of planning, investment decision making, coordination and control are prominent for effective planning and deployment of strategies in SC management (Wamba et al. , 2017; Hazen et al. , 2014; Waller and Fawcett, 2013).”
BackgroundInformation Processing, Knowledge Development, and Strategic Supply Chain Performance
Hult, G. T. M., Ketchen, D. J., & Slater, S. F. (2004) · Academy of Management Journal · doi:10.5465/20159575 · Cited by 813
Big data analytics in supply chain management between 2010 and 2016: Insights to industries
Tiwari, S., Wee, H. M., & Daryanto, Y. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2017.11.017 · Cited by 582 · cited 1×
“More recently, Tiwari et al. (2018) highlighted that BDA can aid in supplier management decision through providing insight on firm spending pattern (Panchmatia, 2015); can aid in supply network design through proper analysis of service level and penalty cost data (Wang, Gunasekaran and Ngai, 2016;…”
BackgroundArunachalam, D., Kumar, N., & Kawalek, J. P. (2018) · Transportation Research Part E: Logistics and Transportation Review · doi:10.1016/j.tre.2017.04.001 · Cited by 535 · cited 4×
“Consequently, the existing literature on BDA is still under development and therefore calls for empirical testing and theory development (Arunachalam et al. , 2018; Wamba et al. , 2017).”
BackgroundInfluential
Cited by
Belhadi, A., Mani, V., Kamble, S. S., Khan, S. A. R., & Verma, S. (2024) · Annals of Operations Research · doi:10.1007/s10479-021-03956-x · Cited by 797
“A study to analyze the impact of data analytics capabilities on SCRes revealed that information planning, coordination, and control are the critical enablers of supply chain preparedness, alertness, and agility leading to SCRes (Mandal 2019).”
BackgroundSpieske, A., & Birkel, H. (2021) · Computers & Industrial Engineering · doi:10.1016/j.cie.2021.107452 · Cited by 499
Zamani, E. D., Smyth, C., Gupta, S., & Dennehy, D. (2023) · Annals of Operations Research · doi:10.1007/s10479-022-04983-y · Cited by 409
Ahmed, A., Bhatti, S. H., Gölgeci, I., & Arslan, A. (2022) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2022.121513 · Cited by 299
Role of Big Data Analytics in supply chain management: current trends and future perspectives
Maheshwari, S., Gautam, P., & Jaggi, C. K. (2021) · International Journal of Production Research · doi:10.1080/00207543.2020.1793011 · Cited by 263
Metadata
- Authors
- Mandal, S.
- Venue
- Information Technology & People
- Publisher
- Emerald
- Published
- 2019-04-01
- Volume
- 32
- Issue
- 2
- Pages
- 297-318
- ISSN
- 0959-3845 (ISSN-L)
- OpenAlex
- W2885344895
- Cited by
- 132
- References
- 16
- FWCI
- 11.33
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.