Factors influencing e-procurement usage
The DOI matches its Crossref record; 28 of the 30 references it cites were found in a registry or an index.
Abstract
Research indicates that e-procurement is being implemented slowly in many organizations, especially government organizations. This article investigates positive factors influencing e-procurement intentions within semi-government organizations. A web-based survey was carried out on Australian government purchasing professional's perspectives of e-procurement. Findings from a multiple regression analysis indicate that suppliers' participation, internal managerial support and the perceived benefits gained through implementation all influence e-procurement intentions.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“The implementation of e-procurement in government organizations indicated that internal managerial supports and stakeholder involvement along the supply chain play a significant role [5].”
From Impact of E-Procurement Adoption on Company Performance: Evidence from Indonesian Manufacturing Industry (2021) · cites this paper as [5]
In the citing paper
“In several previous studies, the application of e-procurement appears to be more of a management problem than a problem of the information technology used [5,31].”
From Impact of E-Procurement Adoption on Company Performance: Evidence from Indonesian Manufacturing Industry (2021) · cites this paper as [5]
In the citing paper
“Dooley and Purchase [5] believe that one of the factors influencing e-procurement usage is staff skills.”
From Impact of E-Procurement Adoption on Company Performance: Evidence from Indonesian Manufacturing Industry (2021) · cites this paper as [5]
In the citing paper
“Dooley et al. [5] also indicate that internal organization factors play a more significant role than technological factors in developed nations (Australia).”
From Impact of E-Procurement Adoption on Company Performance: Evidence from Indonesian Manufacturing Industry (2021) · cites this paper as [5]
Citations
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
(1997) · Chemometrics in Environmental Analysis · doi:10.1002/352760216x.ch5 · Cited by 18,653
Moving Procurement Systems to the Internet:
Davila, A., Gupta, M., & Palmer, R. (2003) · European Management Journal · doi:10.1016/s0263-2373(02)00155-x · Cited by 367
de Beauvoir, S. (1970) · Medical Entomology and Zoology · Cited by 336
A conceptual model for assessing the impact of electronic procurement
de Boer, L., Harink, J., & Heijboer, G. (2002) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(01)00015-6 · Cited by 306
Critical factors that influence e-procurement implementation success in the public sector
Vaidya, K., Sajeev, A. S. M., & Callender, G. (2006) · Journal of Public Procurement · doi:10.1108/jopp-06-01-02-2006-b004 · Cited by 293
The Impact of Web‐Based Procurement on the Management of Operating Resources Supply
Croom, S. R. (2000) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.2000.tb00065.x · Cited by 280
Electronic commerce usage in business‐to‐business purchasing
Min, H., & Galle, W. P. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910280232 · Cited by 188
The Future of Purchasing and Supply: A Ten‐Year Forecast1
Carter, P. L., Carter, J. R., Monczka, R. M., Slaight, T. H., & Swan, A. J. (2000) · Journal of Supply Chain Management · doi:10.1111/j.1745-493x.2000.tb00066.x · Cited by 179
Key issues in e-procurement: Procurement implementation and operation in the public sector
Croom, S. R., & Brandon-Jones, A. (2005) · Journal of Public Procurement · doi:10.1108/jopp-05-03-2005-b004 · Cited by 159 · cited 2×
“A considerable number of studies have been conducted to determine what influences a firm to become involved in eprocurement (see Kennedy & Deeter-Schmelz, 2001; Ellram & Zsidisin, 2002; Min & Galle, 2003; Croom, 2001; Croom & Brandon-Jones, 2004; Davila et al., 2003; Joo & Kim, 2004).”
Background
Research works printed but not linked: 7
- Anonymous, 2002, Work Study, 52 (1) [On-line].
- Bartels A., 2003, TechStrategy, 1
- Croom S., Proceedings of the 13th International IPSERA conference, Month and dates
- Foley P., 2000, Internet Editor
- Olsztynski J., 2003, Supply House Times, 46, 20
- Turban E., 2002, Electronic Commerce 2002: A Managerial Perspective
- Vaidya K., Proceedings of the 13th IPSERA Conference, Month & dates
Cited by
Electronic procurement: a structured literature review and directions for future research
Schoenherr, T., & Tummala, V. M. R. (2007) · International Journal of Procurement Management · doi:10.1504/ijpm.2007.015353 · Cited by 100
Masudin, I., Aprilia, G. D., Nugraha, A., & Restuputri, D. P. (2021) · Logistics · doi:10.3390/logistics5010016 · Cited by 67
“Dooley and Purchase [5] believe that one of the factors influencing e-procurement usage is staff”
BackgroundInfluentialThe impact of e-procurement systems on customer relationship management: a multiple case study
Smith, A. D. (2009) · International Journal of Procurement Management · doi:10.1504/ijpm.2009.024814 · Cited by 45
Pearcy, D. H., Parker, D. B., & Giunipero, L. C. (2008) · American Journal of Business · doi:10.1108/19355181200800002 · Cited by 38
A Success Model for the Malaysian Government e-Procurement System: The Buyer Perspective
Kassim, E. S., & Hussin, H. (2013) · International Journal of Electronic Government Research · doi:10.4018/jegr.2013010101 · Cited by 34
“Besides, Dooley and Purchase (2006) also believe pressures to use e-procurement system from competitors or the related party will influence its adoption.”
Background
Metadata
- Authors
- Dooley, K., & Purchase, S.
- Affiliations
- Central Queensland University (AU)
- The University of Western Australia (AU)
- Venue
- Journal of Public Procurement
- Publisher
- Emerald
- Published
- 2006-03-01
- Volume
- 6
- Issue
- 1/2
- Pages
- 28-45
- ISSN
- 1535-0118 (ISSN-L)
- OpenAlex
- W1594644605
- Cited by
- 59
- References
- 30
- Citations by year
- 2026: 2 · 2025: 1 · 2024: 1 · 2023: 3 · 2022: 4 · 2021: 2 · 2020: 2 · 2019: 3 · 2018: 1 · 2017: 4 · 2015: 1 · 2014: 3 · 2013: 4 · 2012: 4
- FWCI
- 11.04
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Journal of Public Procurement (publishedVersion)
- UWA Profiles and Research Repository (UWA) (publishedVersion)
- Funders
- Central Queensland University
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Public Procurement and Policy
- Social Sciences › Political Science and International Relations › E-Government and Public Services
- Social Sciences › Decision Sciences › Information Systems and Management › Technology Adoption and User Behaviour
- Keywords
- e-procurement, e-procurement adoption, public procurement, supplier involvement, management support, perceived benefits, technology adoption intention
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Factors influencing e-procurement usage. https://app.cochat.ai/papers/10.1108/jopp-06-01-02-2006-b002
- The paper
- Dooley, K., & Purchase, S. (2006). Factors influencing e-procurement usage. Journal of Public Procurement. https://doi.org/10.1108/jopp-06-01-02-2006-b002
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.