A modified ANP and fuzzy inference system based approach for risk assessment of in-house and third party e-procurement systems
The DOI matches its Crossref record; 59 of the 59 references it cites were found in a registry or an index.
Abstract
Purpose: The increasing complexity and dynamism of new technology implemented or to implement have imposed substantial uncertainties and subjectivities in the risk assessment process. This paper aims to present a risk assessment methodology for e-procurement implementation based on modified analytic network process (ANP) coupled with fuzzy inference systems. Design/methodology/approach: ANP is modified in such a way that the experts can provide necessary data precise numerical value, a range of numerical values, a linguistic term or a fuzzy number. The proposed methodology incorporates knowledge and judgements obtained from experts to carry out identification of risk factors and to assess the risk magnitude of the identified risk factors based on factor index, risk likelihood and risk severity. Findings: Risk magnitude of third party systems are found to be minor with a belief of 100 per cent, and for in-house systems, the risk is found to be between minor with a belief of 30 per cent and major of 70 per cent. The results indicate that by using the proposed methodology, the technological risk assessment of new technology can be done effectively and efficiently. Research limitations/implications: Using the results of this study, the practitioners can better know the pros and cons of implementing both in-house and third party e-procurement systems. Originality/value: The modified ANP is used mainly to structure and prioritize the diverse risk factors. Finally, an illustrative example on technological risk assessment of both in-house and third party e-procurement systems is used to demonstrate the applicability of the proposed methodology in real life situations.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
Information technology acceptance by individual professionals: a model comparison approach
Chau, P. Y. K., & Hu, P. J. (2001) · Decision Sciences · doi:10.1111/j.1540-5915.2001.tb00978.x · Cited by 1,409
An extension of the technology acceptance model in an ERP implementation environment
Amoako-Gyampah, K., & Salam, A. F. (2004) · Information & Management · doi:10.1016/j.im.2003.08.010 · Cited by 922
Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment
Wang, Y.-M., & Elhag, T. M. S. (2006) · Expert Systems with Applications · doi:10.1016/j.eswa.2005.09.040 · Cited by 895
Earl, M. J. (1996) · Sloan management review · Cited by 580
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537
Managing the Paradoxes of Mobile Technology
Jarvenpaa, S. L., & Lang, K. R. (2005) · Information Systems Management · doi:10.1201/1078.10580530/45520.22.4.20050901/90026.2 · Cited by 500
Cheng, C.-H. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00026-4 · Cited by 482
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407
Moving Procurement Systems to the Internet:
Davila, A., Gupta, M., & Palmer, R. (2003) · European Management Journal · doi:10.1016/s0263-2373(02)00155-x · Cited by 367
Badri, M. A. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00249-7 · Cited by 348
Research works printed but not linked: 4
- 1993, The information systems outsourcing bandwagon, Sloan Management Review, 35, 73
- 1990, Multicriteria Decision Making: The Analytic Hierarchyprocess
- 1999, Fundamentals of Analytic Network Process
- 2005, A fuzzy-logic-based approach to qualitative risk modelling in the construction process, World Journal of Engineering, 2, 1
Cited by
Selection of the best healthcare waste disposal techniques during and post COVID-19 pandemic era
Manupati, V. K., Ramkumar, M., Baba, V., & Agarwal, A. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125175 · Cited by 174
“ANP is often used whenever there is some sort of interdependencies among the criteria or subcriteria or both (Ramkumar and Jenamani, 2012, 2015); whereas AHP assumes all the criteria and sub-criteria are independent among one another (Ramkumar, 2016; Ramkumar et al., 2016).”
Self-citationA multi-criteria decision making approach for the urban renewal in Southern India
Manupati, V. K., Ramkumar, M., & Samanta, D. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.08.011 · Cited by 108
Self-citationRamkumar, M., Schoenherr, T., Wagner, S. M., & Jenamani, M. (2019) · International Journal of Production Economics · doi:10.1016/j.ijpe.2019.06.003 · Cited by 96
Self-citationKoohathongsumrit, N., & Meethom, W. (2020) · Expert Systems with Applications · doi:10.1016/j.eswa.2020.114342 · Cited by 109
Dynamic temporary blood facility location-allocation during and post-disaster periods
Sharma, B., Ramkumar, M., Subramanian, N., & Malhotra, B. (2017) · Annals of Operations Research · doi:10.1007/s10479-017-2680-3 · Cited by 71
“It is also advised to use geometric mean for combining the individual judgment in group decision making scenario (Ramkumar and Jenamani 2012, 2015; Ramkumar et al. 2016; Ramkumar 2016; Jharkharia and Shankar 2007).”
MethodSelf-citationSingh, P. K., & Chan, S. W. (2022) · Journal of Open Innovation: Technology, Market, and Complexity · doi:10.3390/joitmc8020061 · Cited by 65
“Software-as-a-Service, SaaS-based E-procurement services offer online supply management solutions [2].”
BackgroundInfluentialSalimi, A. H., Noori, A., Bonakdari, H., Samakosh, J. M., Sharifi, E., Hassanvand, M. R., Gharabaghi, B., & Agharazi, M. (2020) · Sustainability · doi:10.3390/su12031232 · Cited by 57
Credit risk evaluation using clustering based fuzzy classification method
Başer, F., Koc, O., & Kestel, S. (2023) · Expert Systems with Applications · doi:10.1016/j.eswa.2023.119882 · Cited by 57
Risk Assessment Using Fuzzy TOPSIS and PRAT for Sustainable Engineering Projects
Koulinas, G. K., Demesouka, O. E., Marhavilas, P. K., Vavatsikos, A. P., & Koulouriotis, D. E. (2019) · Sustainability · doi:10.3390/su11030615 · Cited by 50
A fuzzy-based decision aid method for product deletion of fast moving consumer goods
Pourhejazy, P., Sarkis, J., & Zhu, Q. (2018) · Expert Systems with Applications · doi:10.1016/j.eswa.2018.11.001 · Cited by 42
Ferdosi, M., Rezayatmand, R., & Taleghani, Y. M. (2020) · Risk Management and Healthcare Policy · doi:10.2147/rmhp.s231712 · Cited by 37
Kim, M.-S., Lee, E., Jung, I.-H., & Alleman, D. (2018) · Sustainability · doi:10.3390/su10124780 · Cited by 39
“To that end, the fuzzy and/or AHP method has been used to assess construction projects based on sustainable development criteria [44], improve the efficiency of contractor bidding decisions [45,46], assess e-procurement outsourcing risks [47,48], evaluate the risk of bridge structure failure [49], and aid owners in se…”
MethodWänke, P., Azad, M. A. K., Yazdi, A. K., Birau, F. R., & Spulbar, C. M. (2022) · IEEE Access · doi:10.1109/access.2022.3171339 · Cited by 23
Challenges in the Integration of E-Procurement Procedures into Construction Supply Chains
Gürgün, A. P., Kunkcu, H., Koç, K., Arditi, D., & Atabay, Ş. (2024) · Buildings · doi:10.3390/buildings14030605 · Cited by 39
“For instance, the ICT-related risks of e-procurement were ranked by Ramku-mar [59] by means of a modified fuzzy analytical network process (fuzzy ANP).”
MethodE-procurement adoption in Nigeria: perceptions from the public sector employees
Musa, U., Jaafar, M., & Raslim, F. M. (2023) · Arab Gulf Journal of Scientific Research · doi:10.1108/agjsr-10-2022-0224 · Cited by 27
A Credit Rating Model in a Fuzzy Inference System Environment
Yazdi, A. K., Hanne, T., Wang, Y. J., & Wee, H. (2019) · Algorithms · doi:10.3390/a12070139 · Cited by 7
“Ramkumar and Busi [8] utilized a modified analytic network process (ANP) and fuzzy inference system to establish a risk assessment model for third-party e-procurement systems.”
MethodFan, S., Zhang, H.-J., & Tang, H. (2019) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph16162918 · Cited by 3
A DYNAMIC RISK ASSESSMENT MODELING BASED ON FUZZY ANP FOR SAFETY MANAGEMENT SYSTEMS
Rezaei, M., & Borjalilu, N. (2018) · Aviation · doi:10.3846/aviation.2018.6983 · Cited by 2
“third party e-procurement systems (Ramkumar, 2016).”
MethodMULTI-LAYER INFERENCE FUZZY TSUKAMOTO DETERMINING LAND SUITABILITY CLASS OF COCOA PLANTS
Uljanah, I. I., & Uyun, S. (2021) · JURNAL TEKNIK INFORMATIKA · doi:10.15408/jti.v14i1.13616 · Cited by 1
“…system, which later is called GIS, is for the evaluation of land suitability and the management of land optimization, one of which is by integrating GIS and AHP using the multi-criteria concept by conducting the weighing first [7], while [8] by adding the fuzzy concept on the system of GIS and AHP.”
Arantes, R. F. M. (2020) · Digital Library of Theses and Dissertations (Universidade de São Paulo) · doi:10.11606/d.18.2020.tde-16122020-183623 · Cited by 2
Yanti, R., Qurtubi, Q., Kusrini, E., & Helia, V. N. (2023) · AIP conference proceedings · doi:10.1063/5.0126066
Metadata
- Authors
- Ramkumar, M.
- Affiliations
- IFMR Graduate School of Business (IN)
- Corresponding author
- Ramkumar, M.
- ORCID
- Ramkumar, M.
- Venue
- Strategic Outsourcing: An International Journal
- Publisher
- Emerald
- Published
- 2016-06-20
- Volume
- 9
- Issue
- 2
- Pages
- 159-188
- ISSN
- 1753-8297 (ISSN-L)
- OpenAlex
- W2430259680
- Cited by
- 21
- References
- 59
- Citations by year
- 2024: 1 · 2023: 3 · 2022: 2 · 2021: 1 · 2020: 5 · 2019: 4 · 2018: 4 · 2017: 1
- FWCI
- 3.29
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Strategic Outsourcing An International Journal (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Multi-Criteria Decision Making
- Social Sciences › Business, Management and Accounting › Management Information Systems › Decision Support System Applications
- Social Sciences › Business, Management and Accounting › Management Information Systems › Outsourcing and Supply Chain Management
- Keywords
- e-procurement, risk assessment, analytic network process, fuzzy inference system, technological risk, risk factors, risk magnitude, expert opinion, fuzzy numbers
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.