A modified ANP and fuzzy inference system based approach for risk assessment of in-house and third party e-procurement systems
The DOI matches its Crossref record; 59 of the 59 references it cites were found in a registry or an index.
Abstract
Purpose: The increasing complexity and dynamism of new technology implemented or to implement have imposed substantial uncertainties and subjectivities in the risk assessment process. This paper aims to present a risk assessment methodology for e-procurement implementation based on modified analytic network process (ANP) coupled with fuzzy inference systems. Design/methodology/approach: ANP is modified in such a way that the experts can provide necessary data precise numerical value, a range of numerical values, a linguistic term or a fuzzy number. The proposed methodology incorporates knowledge and judgements obtained from experts to carry out identification of risk factors and to assess the risk magnitude of the identified risk factors based on factor index, risk likelihood and risk severity. Findings: Risk magnitude of third party systems are found to be minor with a belief of 100 per cent, and for in-house systems, the risk is found to be between minor with a belief of 30 per cent and major of 70 per cent. The results indicate that by using the proposed methodology, the technological risk assessment of new technology can be done effectively and efficiently. Research limitations/implications: Using the results of this study, the practitioners can better know the pros and cons of implementing both in-house and third party e-procurement systems. Originality/value: The modified ANP is used mainly to structure and prioritize the diverse risk factors. Finally, an illustrative example on technological risk assessment of both in-house and third party e-procurement systems is used to demonstrate the applicability of the proposed methodology in real life situations.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
Information technology acceptance by individual professionals: a model comparison approach
Chau, P. Y. K., & Hu, P. J. (2001) · Decision Sciences · doi:10.1111/j.1540-5915.2001.tb00978.x · Cited by 1,409
An extension of the technology acceptance model in an ERP implementation environment
Amoako-Gyampah, K., & Salam, A. F. (2004) · Information & Management · doi:10.1016/j.im.2003.08.010 · Cited by 922
Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment
Wang, Y.-M., & Elhag, T. M. S. (2006) · Expert Systems with Applications · doi:10.1016/j.eswa.2005.09.040 · Cited by 895
Earl, M. J. (1996) · Sloan management review · Cited by 580
Application of a fuzzy based decision making methodology to construction project risk assessment
Zeng, J., An, M., & Smith, N. J. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.02.006 · Cited by 537
Managing the Paradoxes of Mobile Technology
Jarvenpaa, S. L., & Lang, K. R. (2005) · Information Systems Management · doi:10.1201/1078.10580530/45520.22.4.20050901/90026.2 · Cited by 500
Cheng, C.-H. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00026-4 · Cited by 482
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407
Moving Procurement Systems to the Internet:
Davila, A., Gupta, M., & Palmer, R. (2003) · European Management Journal · doi:10.1016/s0263-2373(02)00155-x · Cited by 367
Badri, M. A. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00249-7 · Cited by 348
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
A VIKOR technique based on DEMATEL and ANP for information security risk control assessment
Ou Yang, Y.-P., Shieh, H.-M., & Tzeng, G.-H. (2013) · Information Sciences · doi:10.1016/j.ins.2011.09.012 · Cited by 321
Wang, X., Chan, H. K., Yee, R. W. Y., & Diaz-Rainey, I. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.03.021 · Cited by 274
Validating measures of information technology outsourcing risk factors*1
BAHLI, B. (2005) · Omega · doi:10.1016/j.omega.2004.04.003 · Cited by 242
Impact of e-procurement: Experiences from implementation in the UK public sector
Croom, S., & Brandon-Jones, A. (2007) · Journal of Purchasing and Supply Management · doi:10.1016/j.pursup.2007.09.015 · Cited by 239
Outsourcing: Current and future trends
Kakabadse, A., & Kakabadse, N. (2005) · Thunderbird International Business Review · doi:10.1002/tie.20048 · Cited by 238
Risk assessment model selection in construction industry
KarimiAzari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2010.12.110 · Cited by 232
Total quality management and corporate culture: constructs of organisational excellence
Irani, Z., Beskese, A., & Love, P. E. D. (2004) · Technovation · doi:10.1016/s0166-4972(02)00128-1 · Cited by 226
Managing Construction Projects : An Information Processing Approach
Winch, G. (2002) · Research Explorer (The University of Manchester) · Cited by 211
E-readiness assessment of non-profit ICT SMEs in a developing country: The case of Iran
Fathian, M., Akhavan, P., & Hoorali, M. (2008) · Technovation · doi:10.1016/j.technovation.2008.02.002 · Cited by 210
Information risks management in supply chains: an assessment and mitigation framework
Nishat Faisal, M., Banwet, D. K., & Shankar, R. (2007) · Journal of Enterprise Information Management · doi:10.1108/17410390710830727 · Cited by 190
Brito, A. J., de Almeida, A. T., & Mota, C. M. M. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.01.016 · Cited by 190
Analytic network process in risk assessment and decision analysis
Ergu, D., Kou, G., Shi, Y., & Shi, Y. (2014) · Computers & Operations Research · doi:10.1016/j.cor.2011.03.005 · Cited by 183
E-Procurement adoption in the Southcoast SMEs
Gunasekaran, A., McGaughey, R. E., Ngai, E. W. T., & Rai, B. K. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.05.013 · Cited by 183
A hybrid approach to concept selection through fuzzy analytic network process
Ayağ, Z., & Özdemir, R. G. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2008.06.011 · Cited by 183
Khalfan, A. M. (2004) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2003.12.001 · Cited by 176
A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system
Dağdeviren, M., Yüksel, İ., & Kurt, M. (2008) · Safety Science · doi:10.1016/j.ssci.2007.02.002 · Cited by 176
The Hard and Soft Sides of IT Outsourcing Management
Barthélemy, J. (2003) · European Management Journal · doi:10.1016/s0263-2373(03)00103-8 · Cited by 164
A critical balance: collaboration and security in the IT-enabled supply chain
Smith, G. E., Watson, K. J., Baker, W. H., & Pokorski II, J. A. (2007) · International Journal of Production Research · doi:10.1080/00207540601020544 · Cited by 164
Risk assessment in ERP projects
Aloini, D., Dulmin, R., & Mininno, V. (2012) · Information Systems · doi:10.1016/j.is.2011.10.001 · Cited by 158
Dishaw, M. T., & Strong, D. M. (1998) · Journal of Systems and Software · doi:10.1016/s0164-1212(98)10048-1 · Cited by 148
Aligning corporate strategy, procurement strategy and e‐procurement tools
Knudsen, D. (2003) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030310502894 · Cited by 138
A fuzzy risk assessment model for hospital information system implementation
Yücel, G., Çebi, S., Höge, B., & Özok, A. F. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.07.129 · Cited by 124
An integrated FCM and fuzzy soft set for supplier selection problem based on risk evaluation
Xiao, Z., Chen, W., & Li, L. (2011) · Applied Mathematical Modelling · doi:10.1016/j.apm.2011.09.038 · Cited by 119
Fuzzy risk assessment of oil and gas offshore wells
Lavasani, S. M. M., Yang, Z., Finlay, J., & Wang, J. (2011) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2011.06.006 · Cited by 118
Lo, C., & Chen, W.-J. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.07.015 · Cited by 117
Developing a group decision support system based on fuzzy information axiom
Çebi, S., & Kahraman, C. (2009) · Knowledge-Based Systems · doi:10.1016/j.knosys.2009.07.005 · Cited by 112
A multicriteria approach for risks assessment in ERP maintenance
Salmeron, J. L., & López, C. (2010) · Journal of Systems and Software · doi:10.1016/j.jss.2010.05.073 · Cited by 109
e-Records in health—Preserving our future
Scott, R. E. (2006) · International Journal of Medical Informatics · doi:10.1016/j.ijmedinf.2006.09.007 · Cited by 94
Information resource planning for a health-care system using an AHP-based goal programming method
Lee, C. W., & Kwak, N. K. (1999) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600821 · Cited by 92
An examination of organisational culture — the Regent Hotel, Sydney
Kemp, S., & Dwyer, L. (2001) · International Journal of Hospitality Management · doi:10.1016/s0278-4319(00)00045-1 · Cited by 91
Fuzzy eigenvalues and input-output analysis
Buckley, J. J. (1990) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(90)90158-3 · Cited by 77
Factors influencing the outsourcing decisions: a study of the banking sector in India
Jain, R. K., & Natarajan, R. (2011) · Strategic Outsourcing An International Journal · doi:10.1108/17538291111185485 · Cited by 74
A total environmental risk assessment model for international hub airports
Chen, Z., Li, H., Ren, H., Xu, Q., & Hong, J. Y. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.03.004 · Cited by 68
Information Security Threats and Practices in Small Businesses
Keller, S., Powell, A., Horstmann, B., Predmore, C., & Crawford, M. (2005) · Information Systems Management · doi:10.1201/1078/45099.22.2.20050301/87273.2 · Cited by 68
Information Systems Outsourcing by Large American Industrial Firms
Collins, J. S., & MILLEN, R. A. (1995) · Information Resources Management Journal · doi:10.4018/irmj.1995010101 · Cited by 64
Prioritization of outsourcing risks from a systemic perspective
Gandhi, S. J., Gorod, A., & Sauser, B. J. (2012) · Strategic Outsourcing An International Journal · doi:10.1108/17538291211221951 · Cited by 51
Exploring a “Gap” Model of Information Services Quality
Kettinger, W. J., & Lee, C. C. (1995) · Information Resources Management Journal · doi:10.4018/irmj.1995070101 · Cited by 51
Ramkumar, M., & Jenamani, M. (2015) · IEEE Systems Journal · doi:10.1109/jsyst.2014.2336291 · Cited by 51
Self-citationIT Security Management and Business Process Automation: Challenges, Approaches, and Rewards
Tracy, R. P. (2007) · Information Systems Security · doi:10.1080/10658980601051706 · Cited by 25
Ramkumar, M., & Jenamani, M. (2012) · Service Science · doi:10.1287/serv.1120.0024 · Cited by 23
Self-citationE-Readiness Assessment of Non-Profit ICT SMEs in a Developing Country: The Case of IranPreprint
Akhavan, P., Fathian, M., & Hoorali, M. (2012) · SSRN Electronic Journal · Cited by 22
Ganguly, K. K. (2013) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-10-2012-0117 · Cited by 22
Ramkumar, M., & Jenamani, M. (2015) · Service Science · doi:10.1287/serv.2015.0110 · Cited by 21
Self-citationForecasting the capabilities of the Korean civil aircraft industry
Kim, S.-B., & Whang, K.-S. (1993) · Omega · doi:10.1016/0305-0483(93)90041-i · Cited by 20
A study of Electrical Security Risk Assessment System based on Electricity Regulation
You, A. D., Chen, B. Q., Yin, C. X., & Wang, D. B. (2011) · Energy Policy · doi:10.1016/j.enpol.2011.01.050 · Cited by 17
Performance and risk management in strategic cooperation
Ehrengren, L., & Hörnsten, B. (2011) · International Journal of Productivity and Performance Management · doi:10.1108/17410401111123553 · Cited by 13
Measuring the business value of IT outsourcing: a systems approach
Kivijärvi, H., & Toikkanen, J. (2015) · Strategic Outsourcing An International Journal · doi:10.1108/so-03-2015-0010 · Cited by 9
Information Systems Security Risk
Olson, D. L., & Wu, D. D. (2010) · Springer eBooks · doi:10.1007/978-3-642-11474-8_3 · Cited by 2
Research works printed but not linked: 4
- 1993, The information systems outsourcing bandwagon, Sloan Management Review, 35, 73
- 1990, Multicriteria Decision Making: The Analytic Hierarchyprocess
- 1999, Fundamentals of Analytic Network Process
- 2005, A fuzzy-logic-based approach to qualitative risk modelling in the construction process, World Journal of Engineering, 2, 1
Cited by
Selection of the best healthcare waste disposal techniques during and post COVID-19 pandemic era
Manupati, V. K., Ramkumar, M., Baba, V., & Agarwal, A. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125175 · Cited by 174
“ANP is often used whenever there is some sort of interdependencies among the criteria or subcriteria or both (Ramkumar and Jenamani, 2012, 2015); whereas AHP assumes all the criteria and sub-criteria are independent among one another (Ramkumar, 2016; Ramkumar et al., 2016).”
Self-citationA multi-criteria decision making approach for the urban renewal in Southern India
Manupati, V. K., Ramkumar, M., & Samanta, D. (2018) · Sustainable Cities and Society · doi:10.1016/j.scs.2018.08.011 · Cited by 105
Self-citationRamkumar, M., Schoenherr, T., Wagner, S. M., & Jenamani, M. (2019) · International Journal of Production Economics · doi:10.1016/j.ijpe.2019.06.003 · Cited by 96
Self-citationKoohathongsumrit, N., & Meethom, W. (2020) · Expert Systems with Applications · doi:10.1016/j.eswa.2020.114342 · Cited by 109
Dynamic temporary blood facility location-allocation during and post-disaster periods
Sharma, B., Ramkumar, M., Subramanian, N., & Malhotra, B. (2017) · Annals of Operations Research · doi:10.1007/s10479-017-2680-3 · Cited by 71
“It is also advised to use geometric mean for combining the individual judgment in group decision making scenario (Ramkumar and Jenamani 2012, 2015; Ramkumar et al. 2016; Ramkumar 2016; Jharkharia and Shankar 2007).”
MethodSelf-citation
Metadata
- Authors
- Ramkumar, M.
- Affiliations
- IFMR Graduate School of Business (IN)
- Corresponding author
- Ramkumar, M.
- ORCID
- Ramkumar, M.
- Venue
- Strategic Outsourcing: An International Journal
- Publisher
- Emerald
- Published
- 2016-06-20
- Volume
- 9
- Issue
- 2
- Pages
- 159-188
- ISSN
- 1753-8297 (ISSN-L)
- OpenAlex
- W2430259680
- Cited by
- 21
- References
- 59
- Citations by year
- 2024: 1 · 2023: 3 · 2022: 2 · 2021: 1 · 2020: 5 · 2019: 4 · 2018: 4 · 2017: 1
- FWCI
- 3.29
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.emerald.com/insight/site-policies (tdm)
- Locations
- Strategic Outsourcing An International Journal (publishedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Multi-Criteria Decision Making
- Social Sciences › Business, Management and Accounting › Management Information Systems › Decision Support System Applications
- Social Sciences › Business, Management and Accounting › Management Information Systems › Outsourcing and Supply Chain Management
- Keywords
- e-procurement, risk assessment, analytic network process, fuzzy inference system, technological risk, risk factors, risk magnitude, expert opinion, fuzzy numbers
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.