Electrification of the transportation sector can play a vital role in reshaping smart cities. With an increasing number of electric vehicles (EVs) on the road, deployment of well-planned and efficient charging infrastructure is highly desirable. Unlike level 1 and level 2 charging stations, level 3 chargers are super-fast in charging EVs. However, their installation at every possible site is not techno-economically justifiable because level 3 chargers may cause violation of critical system parameters due to their high power consumption. In this paper, we demonstrate an optimized combination of all three types of EV chargers for efficiently managing the EV load while minimizing installation cost, losses, and distribution transformer loading. Effects of photovoltaic (PV) generation are also incorporated in the analysis. Due to the uncertain nature of vehicle users, EV load is modeled as a stochastic process. Particle swarm optimization (PSO) is used to solve the constrained nonlinear stochastic problem. MATLAB and OpenDSS are used to simulate the model. The proposed idea is validated on the real distribution system of the National University of Sciences and Technology (NUST) Pakistan. Results show that an optimized combination of chargers placed at judicious locations can greatly reduce cost from $3.55 million to $1.99 million, daily losses from 787kWh to 286kWh and distribution transformer congestion from 58% to 22% when compared to scenario of optimized placement of level 3 chargers for 20% penetration level in commercial feeders. In residential feeder, these statistics are improved from $2.52 to $0.81 million, from 2167kWh to 398kWh and from 106% to 14%, respectively. It is also realized that the integration of PV improves voltage profile and reduces the negative impact of EV load. Our optimization model can work for commercial areas such as offices, university campuses, and industries as well as residential colonies.
Overview
CoChat Summary
TL;DR
This paper optimizes the placement and mix of Level 1, Level 2, and Level 3 EV chargers in an active distribution network using particle swarm optimization, stochastic EV load modeling, and PV generation. Tested on the NUST Pakistan distribution system, the optimized mix reduces cost, daily losses, and transformer congestion compared with optimized Level 3-only placement.
Key findings
- In commercial feeders at 20% EV penetration, the optimized charger mix reduced cost from $3.55 million to $1.99 million, daily losses from 787 kWh to 286 kWh, and distribution transformer congestion from 58% to 22% compared with optimized Level 3-only placement.
- In the residential feeder, the same comparison improved cost from $2.52 million to $0.81 million, daily losses from 2167 kWh to 398 kWh, and transformer utilization from 106% to 14%.
- Loss reductions for the proposed solution versus Level 3 chargers were 37% (45%) at 5% penetration in commercial (residential) feeders, 54% (63%) at 10% (20%) in commercial feeders, and 61% (82%) at 10% (20%) in the residential feeder.
- PV integration improved voltage profile: at peak load, voltage improvement was 0.001 per unit at node 20 and 0.005 per unit at node 24; node 41 dropped to 0.93 per unit without PV. The proposed solution maintained commercial feeder voltage above 0.94 per unit for all studied penetration levels and residential voltage at 0.99 per unit, while Level 3 chargers caused residential voltage to drop below 0.975 per unit at peak for 20% penetration.
Methods
- EV load was modeled stochastically from a 300-sample survey of arrival time, departure time, and traveled distance; probability distributions were fitted in MATLAB, and initial state of charge was related to traveled distance. PV generation was modeled using real insolation and temperature data.
- The optimization objective minimized charger installation cost, parking-availability penalty, and power-loss cost at $0.092/kWh, subject to voltage limits (±10%), thermal limits, charging capacity, charger-number limits, integer charger counts, and a customer-satisfaction constraint requiring charge above 80% within available time. PSO was implemented in MATLAB and coupled with OpenDSS for unbalanced distribution power flow.
- The test system was the real 11/0.4 kV radial distribution network of NUST, Islamabad, Pakistan, with three feeders (Feeders 1 and 2 commercial, Feeder 3 residential). The EV modeled was a Nissan Altra with a 29.07 kWh Li-ion battery and about 80-mile range; PV included 200 kW at node 19 of Feeder 1 and 1 MW at node 24 of Feeder 2.
Limitations
- The paper states that PSO is a heuristic technique and can get stuck in local optima; to mitigate this, PSO was run multiple times and results analyzed statistically, which increases computational burden.
- The paper states that vehicle-to-grid (V2G) is not considered, and the maximum number of chargers per node is based on an assumed physical limit of 3 allowable parking slots per location.
- Evident from the text: the EV load model relies on a 300-person survey and one real distribution system (NUST Pakistan), and simulations use one EV type (Nissan Altra), which may limit generalizability to other locations, populations, and vehicle fleets.
Model-written summary. Check it against the paper before relying on it.
Integrity signals
Registry
Cites
Statistics
Figures



















Verification
Claims the paper makes
0 Valid · 6 Not valid · 14 Not checked · 62 Own results and interpretations
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“In residential feeder, these statistics are improved from $2.52 to $0.81 million, from 2167kWh to 398kWh and from 106% to 14%, respectively.”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > Abstract
plainstates a causeSingle case- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“In case of residential feeder, the proposed solutions offer 61% (82%) less losses than level 3 chargers for 10% (20%) penetration.”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > III. RESULTS
plainstates a cause- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper reports from its own data — it cites no other source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“In addition, the losses are around 37% (45%) less than level 3 chargers in commercial (residential) feeder for 5% penetration level of EV, as shown in Figure 7.”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > III. RESULTS
plainstates a cause- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper states — it cites no source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“This is because residential feeders are low power feeders and level 3 chargers can increase its losses significantly and may overload certain transformers.”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > III. RESULTS
plainstates a cause- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: passes — The paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
A result the paper states — it cites no source for it, so there is none to check. The quote shows it is in the paper.
In the paper
“To charge EVs using level 1 and level 2 chargers, the number of chargers needed is approximately equal to the number of vehicles to be charged daily.”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > III. RESULTS
hedgedstates an association- Asserted: passes — The authors put it forward as true.
- Checkable: passes — It can be checked against evidence.
- Load-bearing: unclear — It is unclear whether the paper’s conclusions depend on it.
- Based: passes — The paper gives a reason why it holds.
- Rests on an assumption not shown here.
45 more claims
Create a free account to see all 82 claims and to verify the 2 references still open.
- The quote only partly states this claim. 3
- It may state two separate claims as one. 17
- Probably not a substantial claim. 14
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The source backs part of the claim, not all of it — or backs it for a different population, condition or comparison.
In the citing paper
“As a result, fast charging in the EVCSs is viable for charging an EV's battery in 20-30 min Zeb et al. (2020).”
From Optimal location of electric vehicle charging station and its impact on distribution network: A review (2022) · cites this paper as Zeb et al., 2020
Experimental — accuracy not yet measuredThe cited source says what the claim attributes to it.
In the citing paper
“Therefore, most of the researchers have included power loss cost (Shukla et al., 2019;Zeb et al., 2020;Chen et al., 2021b;Moradi et al., 2015;Pal et al., 2021;Gampa et al., 2020;El-Zonkoly and Dos Santos Coelho, 2015;Battapothula et al., 2019a;Xiang et al., 2016) as the objective function in Eq. ( 7)”
From Optimal location of electric vehicle charging station and its impact on distribution network: A review (2022) · cites this paper as Zeb et al., 2020
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
Each contradiction between two passages listed here was confirmed by an independent check.
Rated minor: it would not touch a result — a value no result rests on, a p-value that stays on the same side of the significance level, or a conflict that is clerical, resolved elsewhere in the paper, or outside its own findings.
In the paper
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > III. RESULTS
“In addition, the losses are around 37% (45%) less than level 3 chargers in commercial (residential) feeder for 5% penetration level of EV, as shown in Figure 7.”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > IV. CONCLUSION
“FIGURE 7. Cost of installation of charging stations for level 3 chargers and proposed solution.”
Rated minor: it would not touch a result — a value no result rests on, a p-value that stays on the same side of the significance level, or a conflict that is clerical, resolved elsewhere in the paper, or outside its own findings.
In the paper
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > C. PROBLEM FORMULATION
“n 1,i + n 2,i + n 2,i ≤ n max,i ∀i ∈ N (7”
§ Optimal Placement of Electric Vehicle Charging Stations in the Active Distribution Network > C. PROBLEM FORMULATION
“The limited charger number constraint ensures that total number of chargers at a node is less than the pre-determined feasible charging slots available for EV in a given location.”
Citations
Cites
Yilmaz, M., & Krein, P. T. (2013) · IEEE Transactions on Power Electronics · doi:10.1109/tpel.2012.2212917 · Cited by 3,118 · cited 1×
“However, level 2 chargers require protection upgrade if used inside a residential house [18].”
BackgroundModeling of Load Demand Due to EV Battery Charging in Distribution Systems
Qian, K., Zhou, C., Allan, M., & Yuan, Y. (2011) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2010.2057456 · Cited by 1,268 · cited 1×
“When fully charged, its maximum range is around 80 miles [4].”
BackgroundCoordinated Charging of Plug-In Hybrid Electric Vehicles to Minimize Distribution System Losses
Sortomme, E., Hindi, M. M., MacPherson, S. D. J., & Venkata, S. S. (2011) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2010.2090913 · Cited by 1,155 · cited 2×
“A solution is proposed in [8] to lower distribution system losses by coordinated charging scheme.”
BackgroundOptimal Planning of Electric-Vehicle Charging Stations in Distribution Systems
Liu, Z., Wen, F., & Ledwich, G. (2013) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2012.2223489 · Cited by 672
The impact of plug-in hybrid electric vehicles on distribution networks: A review and outlook
Green, R. C., Wang, L., & Alam, M. (2011) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2010.08.015 · Cited by 640 · cited 1×
“ηch is charging efficiency (92%) [26], Cev is EV charging power which is determined by the type of charger, SOCinit is the initial state of charge which can be in the range of 0-1 and 1tch is available time of charging.”
BackgroundOptimal fast charging station placing and sizing
Sadeghi-Barzani, P., Rajabi-Ghahnavieh, A., & Kazemi-Karegar, H. (2014) · Applied Energy · doi:10.1016/j.apenergy.2014.03.077 · Cited by 557 · cited 1×
“A comprehensive plan for optimally locating and sizing fast-charging stations on urban roads is presented in [21].”
BackgroundMasoum, A. S., Deilami, S., Moses, P. S., Masoum, M. A. S., & Abu-Siada, A. (2011) · IET Generation, Transmission & Distribution · doi:10.1049/iet-gtd.2010.0574 · Cited by 440 · cited 3×
“The maximum and minimum voltage limit constraint ensures voltage lies within permissible limits (±10%) [9].”
BackgroundA review on electric vehicles interacting with renewable energy in smart grid
Liu, L., Kong, F., Liu, X., Peng, Y., & Wang, Q. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.06.036 · Cited by 314 · cited 1×
“By 2022, the number of EVs is expected to surpass 35 million globally [2].”
BackgroundFazelpour, F., Vafaeipour, M., Rahbari, O., & Rosen, M. A. (2014) · Energy Conversion and Management · doi:10.1016/j.enconman.2013.09.006 · Cited by 257 · cited 1×
“Similarly, the ability of solar photovoltaic generation to improve voltage profile has been used to reduce negative impacts of EV parking in [17].”
BackgroundUnbalanced Model and Power-Flow Analysis of Microgrids and Active Distribution Systems
Kamh, M. Z., & Iravani, R. (2010) · IEEE Transactions on Power Delivery · doi:10.1109/tpwrd.2010.2042825 · Cited by 208 · cited 1×
“These include Forward/Backward sweep method and its variants [29], [30] and some novel techniques as presented in [27], [28], [31].”
Method
Research works printed but not linked: 3
- G. S. Atlas. (2020). Tier 1 Solar Measurement Site in NUST Islamabad Pakistan. [Online]. Available: https://globalsolaratlas. info/map?c=30.977609,73.355713,6&m=solar
- I. E. S. Company. (2019). Tariff Guide. Utilities Policy. [Online]. Available: https://iesco.com.pk/index.php/customer-services/tariff-guide
- R. Dugan, OpenDSS Circuit Solution Technique, EPRI, Palo Alto, CA, USA, Nov. 2017.
Cited by
Items 101–200 of 262
Alharbi, A. H., Khafaga, D. S., El‐kenawy, E. M., Eid, M. M., Ibrahim, A. F., Abualigah, L., Khodadadi, N., & Abdelhamid, A. A. (2024) · Frontiers in Energy Research · doi:10.3389/fenrg.2024.1401330 · Cited by 9
“This has been accomplished by selecting the most suitable location for charging stations and developing technology that can change rapidly, with a time frame of no more than 30 minutes (Zeb et al., 2020; Mohamed et al., 2021).”
MethodKoutounidis, A., Dovom, D. B., Paulsen, M., Papadaskalopoulos, D. A., Pereira, F. C., & Azevedo, C. L. (2025) · Sustainable Cities and Society · doi:10.1016/j.scs.2025.106884 · Cited by 13
Ranjbar, M. A., Baghaee, H. R., & Ramezani, A. (2026) · Energy Strategy Reviews · doi:10.1016/j.esr.2026.102124 · Cited by 18
Tripathy, S., Fahnbulleh, E. B., Ghatak, S. R., Lopes, F., & Acharjee, P. (2026) · Energies · doi:10.3390/en19051131 · Cited by 12
Tariq, A., Kazmi, S. A. A., Ali, G., & Bhatti, A. H. U. (2023) · Sustainable Energy Grids and Networks · doi:10.1016/j.segan.2023.101155 · Cited by 14
Gantayet, A., Raza, T., & Dheer, D. K. (2021) · IEEE International Conference on Computing, Power and Communication Technologies (IC2PCT) · doi:10.1109/gucon50781.2021.9573640 · Cited by 9
“Particle swarm optimization (PSO) is used in [4] to monitor the EV load effectively while reducing infrastructure costs, losses, and distribution transformer loading.”
MethodDas, P., Das, D., Bhowmik, A. R., et al. (2023) · International Conference on Power, Instrumentation, Energy and Control (PIECON) · doi:10.1109/piecon56912.2023.10085761 · Cited by 9
“The authors in [4] have used an innovative approach for optimum dimensions and placement of various types of EV charging stations in the active distribution system of offices and residences, as well as other business and residential structures.”
MethodAlshareef, S. M., & Fathy, A. (2024) · World Electric Vehicle Journal · doi:10.3390/wevj15040172 · Cited by 11
Fresia, M., Francis, A., Parodi, M., Ferrari, A., Siri, S., & Bracco, S. (2025) · Sustainable Energy Grids and Networks · doi:10.1016/j.segan.2025.101898 · Cited by 13
Pucuhuayla, F. J. S., Huatuco, D. Z. Ñ., Rodríguez, Y. P. M., et al. (2025) · Energies · doi:10.3390/en18205483 · Cited by 8
Sekhar, A., Maharana, M. K., & Allamsetty, S. (2026) · Journal of Renewable and Sustainable Energy · doi:10.1063/5.0297523 · Cited by 8
Sultana, U., Mujahid, A., Jilani, H. A., & Perveen, U. (2022) · International Electrical Engineering Conference (IEEC) · doi:10.3390/engproc2022020015 · Cited by 8
Deployment Impact of Electric Vehicle Charging Stations on Radial Distribution System
Chaudhary, V. K., Singh, M. K., & Lal, B. (2022) · IEEE Uttar Pradesh Section International Conference on Electrical, Electronics and Computer Engineering (UPCON) · doi:10.1109/upcon56432.2022.9986464 · Cited by 8
“The resulting stochastic nonlinear problem is solved using PSO [5].”
MethodShahalami, S. M., Ahmadnia, S., Armanfard, S., et al. (2022) · Applied Solar Energy · doi:10.3103/s0003701x22020190 · Cited by 8
“In this regard, at the completion of the convergence process of multiobjective evolutionary algorithms, a solution set called the Pareto front is calculated as solution intervals [29].”
BackgroundRazzaghi, A., Larimi, S. M. M., & Baghaee, H. R. (2026) · Energy Strategy Reviews · doi:10.1016/j.esr.2026.102055 · Cited by 11
Experimental validation of off‐board EV charging station with reduced active switch count
Khalid, M. R., Asghar, M. S. J., Alam, M. S., Hameed, S., & Khan, I. (2022) · International Journal of Energy Research · doi:10.1002/er.8359 · Cited by 8
“Providing isolation at the end-stage increases the cost of the EV charger and the power conversion stages.(20) The end-stage of the proposed EV charger is a non-isolated interleaved buck converter.”
BackgroundAhmad, F., Iqbal, A., Ashraf, I., Marzband, M., & Khan, I. A. (2021) · IEEE Transportation Electrification Conference (ITEC-India) · doi:10.1109/itec-india53713.2021.9932488 · Cited by 8
“With their massive batteries ranging from 5 to 36 kWh [2], EVs constitute a bulk load, causing major issues since rapid charging requires a large amount of electricity from the grid in a short period.”
BackgroundAlNahhal, R. H., Naiem, A. F., Shaaban, M. F., & Ismail, M. (2022) · IEEE Access · doi:10.1109/access.2022.3224753 · Cited by 8
“In [20], the allocation of charging stations is optimized in a distribution system.”
BackgroundGharbia, I. B., Nunzio, G. D., & Sciarretta, A. (2023) · IEEE International Conference on Intelligent Transportation Systems (ITSC) · doi:10.1109/itsc57777.2023.10421957 · Cited by 7
“Optimal placement of charging infrastructure is crucial to enhance EV adoption [1], [2], alleviate range anxiety, enable long-distance travel, and ensure cost-efficient utilization and convenient access to fast charging facilities[3].”
BackgroundPort Optimization and Charging Station Allocation Considering EV User Comfort With Utility Benefits
Brahmachary, R., Bhattacharya, A., Pal, A., & Ahmed, I. (2024) · IEEE Transactions on Industry Applications · doi:10.1109/tia.2024.3443779 · Cited by 7
Self-citationA systematic literature review of optimal placement of fast charging station
Putra, J. T., Setyonegoro, M. I. B., Niet, T., & Sarjiya, S. (2024) · e-Prime - Advances in Electrical Engineering Electronics and Energy · doi:10.1016/j.prime.2024.100818 · Cited by 18
Vijay, V., Venkaiah, C., & Kumar, D. M. V. (2023) · Energy Storage · doi:10.1002/est2.484 · Cited by 7
“In Reference 8, installation of level 1, level 2, and level 3 connectors was done at CS.”
BackgroundRajnarayanan, P. N., & Kathiravan, K. (2022) · SSRN Electronic Journal · doi:10.2139/ssrn.4183173 · Cited by 7
Kien, L. C., Loi, T. D., Duong, M. P., et al. (2025) · Sensors · doi:10.3390/s25071997 · Cited by 6
“In [13], the authors have considered the placement of ECVSs in the 52-node DEPS using PSO with three charging output levels, namely levels 1, 2, and 3.”
Peng, Y., Ye, L., Ouyang, W., Xi, Q., Wang, J., & Wang, X. (2025) · IEEE Access · doi:10.1109/access.2025.3582530 · Cited by 6
Optimized Planning for Electric Vehicle Charging Stations: A Systematic Review
Ferraz, R. S. F., Ferraz, R. S. F., & Medina, A. C. R. (2025) · IEEE Access · doi:10.1109/access.2025.3607112 · Cited by 12
“In [60], a real distribution system from a university in Pakistan was applied.”
InfluentialNandi, S., Ghatak, S. R., Acharjee, P., et al. (2024) · Energies · doi:10.3390/en17174204 · Cited by 6
Pucuhuayla, F. J. S., Castillo, C., Huatuco, D. Z. Ñ., et al. (2024) · Energies · doi:10.3390/en17174477 · Cited by 6
Optimal Planning of Smart Charging Facilities using Grey Wolf Optimizer
Goli, P., Yelem, S., Muaddi, S., et al. (2022) · IEEE Texas Power and Energy Conference (TPEC) · doi:10.1109/tpec54980.2022.9750837 · Cited by 6
Garcia, G. C., Vargas, R., Melo, J. D., et al. (2023) · IEEE Access · doi:10.1109/access.2023.3339563 · Cited by 6
“The use of EVs introduces new electrical loads into the LV distribution network, such as residential EV chargers [9], which can cause problems in network operation [3].”
BackgroundKumar, A., Kumar, S., Sinha, U. K., Saw, B. K., & Bohre, A. K. (2023) · IEEE International Conference on Power Electronics, Smart Grid, and Renewable Energy (PESGRE) · doi:10.1109/pesgre58662.2023.10405050 · Cited by 7
“The drivers' comfort level and the accessibility of charging stations were taken into consideration when the PSO algorithm articulated the EVCS placement problem [12].”
MethodSimultaneous Optimal Allocation of EVCSs and RESs Using an Improved Genetic Method
Farjamipur, M., Lotfi, H., & Nikkhah, M. H. (2024) · IET Circuits Devices & Systems · doi:10.1049/2024/4798197 · Cited by 6
Bousia, A. (2026) · Electronics · doi:10.3390/electronics15020366 · Cited by 9
Moreno, C. A. M., Leyton-Valencia, K. A., Grisales-Noreña, L. F., Bolaños, R. I., & Hernández, J. C. (2026) · Sci · doi:10.3390/sci8050119 · Cited by 7
Sanni, M. T., Pota, H. R., Dong, D., & Mo, H. (2024) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2024.102972 · Cited by 5
Optimal Electric Vehicle Charging Station Placement as a Congestion Game Problem
Sönmez, Y., Kızılkale, C., Kurzhanskiy, A. A., & Arcak, M. (2024) · European Control Conference (ECC) · doi:10.23919/ecc64448.2024.10591217 · Cited by 7
A fast charging of Li‐ion battery based on Lyapunov function for electrical vehicle
Vazini, H., Asadi, M., Karimadini, M., & Hajisadeghian, H. (2021) · IET Power Electronics · doi:10.1049/pel2.12209 · Cited by 6
Rajput, D., Saxena, N. K., Srivastava, A., Verma, D., & Tyagi, P. K. (2024) · Lecture notes in electrical engineering · doi:10.1007/978-981-99-7630-0_12 · Cited by 5
Razaq, R., Imran, K., Kumari, R., Janjua, A. K., Iftikhar, M., Zhang, J., & Kharal, A. (2024) · Renewable energy focus · doi:10.1016/j.ref.2024.100548 · Cited by 7
Self-citationZangmo, R., Sudabattula, S. K., Mishra, S., et al. (2024) · International Conference on Innovative Sustainable Technologies for Energy, Mechatronics, and Smart Systems (ISTEMS) · doi:10.1109/istems60181.2024.10560189 · Cited by 5
“Although there is evidence in the literature [17] – [19] that they can lower emissions and boost grid resilience, there are also worries about increasing peak demand, voltage fluctuations, and the possible need for infrastructure modifications.”
BackgroundKumar, B. V., & A, A. F. M. (2025) · Journal of Energy Storage · doi:10.1016/j.est.2025.118585 · Cited by 6
Thangaraju, I. (2021) · International Journal of Intelligent Systems · doi:10.1002/int.22765 · Cited by 5
Chen, Y., Wang, Y., Hou, H., Zhao, B., Zhang, L., & Xie, C. (2022) · Asia Conference on Power and Electrical Engineering (ACPEE) · doi:10.1109/acpee53904.2022.9784060 · Cited by 5
Verma, M. K., Mukherjee, V., Yadav, V. K., & Ghosh, S. (2022) · Soft Computing · doi:10.1007/s00500-022-07622-7 · Cited by 5
Integration of Renewable Energy Resources and Implications: A Review
Aamir, Z., Ahmad, S. A., Shoukat, A., et al. (2022) · International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP) · doi:10.1109/ict-pep57242.2022.9988879 · Cited by 5
“Grid frequency shifts with time as it normally depends on the consumers' energy consumption [7].”
BackgroundMadboly, M., Zeineldin, H. H., EL-Fouly, T. H. M., & El-Saadany, E. F. (2023) · IEEE PES Conference on Innovative Smart Grid Technologies - Middle East (ISGT Middle East) · doi:10.1109/isgtmiddleeast56437.2023.10078655 · Cited by 8
“In [2], a stochastic model for EV load estimation was proposed, the model assumes a certain EV penetration level and estimates three probabilistic variables: arrival time, departure time, and charging duration.”
BackgroundMethodMiah, M. S., Shah, R., Aslam, M. U., Amjady, N., Walker, S. L., Terzija, V. V., Dehghan, S., & Mithulananthan, N. (2026) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2026.116858 · Cited by 5
Mehouachi, I., Trojette, M., & Grayaa, K. (2022) · International Conference on Control, Decision and Information Technologies (CoDIT) · doi:10.1109/codit55151.2022.9803893 · Cited by 4
Effect of Electrical Vehicle Charging on Power Quality
Ahmad, P., Kumar, K. S., Varshney, T., Gupta, S., Varshney, R., Choudhary, N. K., & Singh, N. (2023) · Lecture notes in electrical engineering · doi:10.1007/978-981-99-0973-5_53 · Cited by 5
Optimum Scenarios of EV Charging Infrastructure: A Case Study for the Saudi Arabia Market
Azab, M. A. (2023) · Energies · doi:10.3390/en16135186 · Cited by 5
Mohamed, A. A. S., Ingalalli, A., Rehman, W. U., & Bhavaraju, V. (2024) · IEEE Transportation Electrification Conference and Expo · doi:10.1109/itec60657.2024.10599082 · Cited by 4
“Most studies in the literature focus on planning for public fast charging stations in cities and highways for passenger cars and ride-hailing fleets to identify optimal locations that minimize cost and impacts on the grid [3], [4], [5], [6], [7], [8], [9].”
BackgroundOptimal Placement of Electric Vehicle Charging Stations: A Case Study in Jordan
Bashaireh, A., Obeidat, D., Almehizia, A. A., et al. (2023) · IEEE Texas Power and Energy Conference (TPEC) · doi:10.1109/tpec56611.2023.10078486 · Cited by 4
“In [13] and [14], Particle Swarm Optimization (PSO) was used with the objective of minimizing the cost and the effect on the grid in terms of losses and transformer loading.”
MethodKhademi, M. M., Kazemi, E., & Jahromi, M. Z. (2023) · doi:10.1109/icee59167.2023.10334824 · Cited by 4
Parray, M. T., Martinsen, T., & Jåstad, E. O. (2025) · Journal of Energy Storage · doi:10.1016/j.est.2025.119615 · Cited by 3
Babu, T. M., Asokan, K., & Subrahmanyam, J. B. V. (2024) · Indian Journal of Science and Technology · doi:10.17485/ijst/v17i13.3283 · Cited by 5
Charging station placement optimization based on the location significance prediction
Matković, D., Matijašević, T., & Capuder, T. (2024) · Energy Sources Part A Recovery Utilization and Environmental Effects · doi:10.1080/15567036.2024.2391558 · Cited by 5
“The connection between future charging behavior and optimal future expansion of charging infrastructure is still not investigated enough, while studies like Pevec et al. (2018) and Zeb et al. (2020) provide a good foundation for further development in this field.”
Magsino, E. R., Espiritu, F. M. M., & Go, K. D. (2024) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi13100368 · Cited by 3
“However, this plan is not economical because it can ruin the electric grid capacity of a place because of the high energy consumption introduced by level 3 chargers [26].”
Grey Wolf Algorithm for Area-Wise Allocation of EV Charging Stations
Singh, A., Rizwan, M., & Nangia, U. (2024) · IEEE International Conference on Power Electronics, Intelligent Control and Energy Systems · doi:10.1109/icpeices62430.2024.10719144 · Cited by 3
“The search agent will be positioned randomly within the range of its current location and the location of the prey, when the variable A takes on random values within the range of [1, 1].”
BackgroundOptimal Planning of EVCS and Capacitor in Distribution System Considering Interruption Cost
Kumar, B. V., & A, A. F. M. (2024) · IEEE International Conference on Sustainable Energy and Future Electric Transportation (SEFET) · doi:10.1109/sefet61574.2024.10718130 · Cited by 3
“An optimized mixed charger strategy substantially reduced costs and improved efficiency [14].”
BackgroundA comprehensive review of optimal placement of EVCS and sizing in active distribution network
Kumar, S., Agarwal, R., Joshi, P., Agrawal, S., & Yadav, L. K. (2024) · Australian Journal of Electrical & Electronics Engineering · doi:10.1080/1448837x.2024.2432080 · Cited by 4
“In (Zeb et al. 2020) this work, we show how to effectively manage the EV load while reducing installation costs, active power losses, and distribution network transformer loading by combining all three levels of EV chargers in an optimum way.”
Babaeiyazdi, I., Rezaei‐Zare, A., & Shokrzadeh, S. (2021) · IEEE Electrical Power and Energy Conference (EPEC) · doi:10.1109/epec52095.2021.9621705 · Cited by 3
Security and Energy Consumption Considerations of Electric Vehicles Integration in Smart Grids
Sabzi, S., & Vajta, L. (2023) · U Porto Journal of Engineering · doi:10.24840/2183-6493_009-001_001382 · Cited by 5
Direya, R., & Khatib, T. (2023) · World Electric Vehicle Journal · doi:10.3390/wevj14040103 · Cited by 7
A Multi-Objective Optimization Schedule for the charging behavior of the EV user in a Smart Campus
Hassan, M. A. E., Oransa, A. A., Elsallanty, A. M., Fekry, D. R., Ibrahim, H. H., & Sedhom, B. E. (2023) · IEEE International Conference on Energy Technologies for Future Grids (ETFG) · doi:10.1109/etfg55873.2023.10407166 · Cited by 3
Optimizing Electric Vehicle Charging Infrastructure: A GNN-TSP Approach
Popa, A., & Sîrbu, T.-I. (2024) · International Conference on Innovations in Intelligent Systems and Applications (INISTA) · doi:10.1109/inista62901.2024.10683821 · Cited by 3
“Not unexpectedly, optimal placement of EV charging stations within the distribution network emerges to maximize infrastructure efficiency [31], [35].”
BackgroundNandi, S., Ghatak, S. R., & Acharjee, P. (2024) · IEEE International Conference on Sustainable Energy and Future Electric Transportation (SEFET) · doi:10.1109/sefet61574.2024.10717944 · Cited by 3
“The μ and σ used in the proposed work are 27.5 and 8.9629 respectively and their probability density function is given below [14]: B. 2m-Point Estimate Method H. P. Hong’s 2m-PEM method is used to handle the uncertain parameters related to the FEVCS planning model.”
MethodInfluentialNugroho, N. D. S., Priyadi, A., & Lystianingrum, V. (2025) · International Seminar on Intelligent Technology and Its Applications · doi:10.1109/isitia66279.2025.11137428 · Cited by 2
“The research by Muhammad Zulqarnain et al. [17] showed that the use of PSO in determining the location of EVCS produced better solutions compared to conventional methods.”
Yaseen, N., Ahmed, W., & Wassan, N. (2025) · Research in Transportation Business & Management · doi:10.1016/j.rtbm.2025.101516 · Cited by 2
Yapıcı, A. T., Abut, N., & Yıldırım, A. (2025) · Applied Sciences · doi:10.3390/app152111462 · Cited by 2
Ahmad, M., Nawaz, A., Ullah, R., Mustafa, E., & Ali, A. (2025) · Energy Science & Engineering · doi:10.1002/ese3.70401 · Cited by 3
“In recent times, BFOA‐PSO [30], GA‐PSO [31], ECapSa [32], PSO [33], JSO [34], HHO and TLBO [35], and ALO [36] techniques have been considered to minimize power losses and voltage deviation and improve voltage stability while taking into account balanced distribution networks.”
Ríos, J. P. B., Huatuco, D. Z. Ñ., Pucuhuayla, F. J. S., et al. (2026) · Electricity · doi:10.3390/electricity7020025 · Cited by 2
Electric Vehicle Fast Charging Technologies and Grid Integration—A Comprehensive Review
Sharida, A., Kamal, N. F., Bayhan, S., & Abu-Rub, P. D. H. (2025) · Proceedings of the IEEE · doi:10.1109/jproc.2026.3677611 · Cited by 4
Heo, J., & Chang, S. (2026) · Sustainable Cities and Society · doi:10.1016/j.scs.2026.107688 · Cited by 2
Rabie, A., Ghanem, A., Kaddah, S. S., & El‐Saadawi, M. M. (2023) · International Journal of Power Electronics and Drive Systems/International Journal of Electrical and Computer Engineering · doi:10.11591/ijpeds.v14.i4.pp2514-2526 · Cited by 3
Neeraja, B., Babu, M. R., Kumar, N., Babavali, S. F., Shanmugam, S. K., Goswami, A., Sonawane, A. D., & Mohan, R. M. (2023) · Electric Power Components and Systems · doi:10.1080/15325008.2023.2280920 · Cited by 2
“Sunlight-based electric vehicles can accomplish low-carbon, vitality-sparing, natural assurance, and genuine zero-discharges for the eventual fate [17].”
Stefani, Y., Komsiyah, S., & Mauritsius, T. (2024) · International Conference on Software Engineering and Information Technology (ICoSEIT) · doi:10.1109/icoseit60086.2024.10497500 · Cited by 2
“The authors [6] concentrate on reducing the expenses associated with electricity distribution installation and loss.”
BackgroundMethodResearch on Optimal Site Selection for Electric Vehicle Charging Stations
Zhang, K., & Cheng, L. (2024) · International Conference on Power Electronics and Artificial Intelligence (PEAI) · doi:10.1145/3674225.3674366 · Cited by 2
“On the other hand, the distribution of electric vehicle charging load in a day with the change of electric vehicle use time, and there is a certain time characteristic from the beginning of electric vehicle travel to the end of electric vehicle driving [4].”
Hybrid PSO-based Optimal Location of Electric Vehicle Charging Station in Distribution Networks
Chandra, I., Singh, A., Singh, N. K., et al. (2024) · IEEE Students Conference on Engineering and Systems (SCES) · doi:10.1109/sces61914.2024.10652265 · Cited by 2
“[4] presented an optimized combination of all three types of EV chargers for efficiently regulating the EV load while minimizing power loss to increase overall network efficiency and reliability.”
MethodNoor, M., Palmer, P., & Resener, M. (2024) · doi:10.1109/gtdla61236.2024.10913790 · Cited by 2
“In contrast, others adopt a multi-objective approach to encompass a comprehensive range of objectives [14].”
Analysis of Future Probabilistic placement of Electric Vehicle Chargers on Real Residential Feeder
Farah-Ul-Ain, F.-U., & Imran, K. (2021) · International Conference on Frontiers of Information Technology (FIT) · doi:10.1109/fit53504.2021.00061 · Cited by 4
Self-citationRaval, S., Patel, N., Thangadurai, N., & Deb, S. (2024) · International Journal of Artificial Intelligence Tools · doi:10.1142/s0218213023500732 · Cited by 2
Adelino, M. I., & Fitri, M. (2021) · doi:10.1109/ic2se52832.2021.9792056 · Cited by 2
Matheswaran, A., Selladurai, R., & Chinnadurrai, C. (2022) · Journal of Intelligent & Fuzzy Systems · doi:10.3233/jifs-212401 · Cited by 2
“In making elec-ISSN tric transportation real, the electrical grid should be well developed to adopt new load and various generation models to meet the volatility in EV load and Renewable based generation [21].”
Kumar, U., & Vadhera, S. (2023) · Lecture notes in electrical engineering · doi:10.1007/978-981-99-2283-3_20 · Cited by 1
Electric vehicle charging management through LSTM-based prediction of non-critical charging sessions
Tayarani, H., Tal, G., & Nitta, C. J. (2026) · Transportation Research Part D Transport and Environment · doi:10.1016/j.trd.2026.105402 · Cited by 2
Liu, H., Pang, A., Wu, S., & Jiang, C. (2025) · Journal of Renewable and Sustainable Energy · doi:10.1063/5.0265230 · Cited by 1
Aljumah, A., & Darwish, A. (2025) · Sustainability · doi:10.3390/su17198819 · Cited by 1
Singh, S. D., Singh, T. S. D., & Singh, M. D. (2025) · Lecture notes in electrical engineering · doi:10.1007/978-981-96-7222-6_1 · Cited by 1
Hima Bindu, A., & Reddy, V. N. B. (2025) · IEEE International Conference on Sustainable Energy and Future Electric Transportation (SEFET) · doi:10.1109/sefet65155.2025.11255373 · Cited by 1
“Consequently, rapid charging at EVCSs is feasible for replenishing an EV's battery within 20 to 30 minutes[3]. at addition to the disadvantages of fast charging at Electric Vehicle Charging Stations (EVCS), it adversely impacts the distribution system, which might be alleviated by precise EVCS…”
Sobhani, S. S., Zahedi, R., Yousefi, H., & Hajinezhad, A. (2025) · Energy Conversion and Management X · doi:10.1016/j.ecmx.2025.101457 · Cited by 8
Ma, W., Jin, G., Li, N., Tian, Y., Cao, G., & Lu, S. (2026) · Electronics · doi:10.3390/electronics15051097 · Cited by 1
Analytical evaluation of line flow variations due to electric vehicle charging station locations
Nikkhah, M. H., Lotfi, H., Samadi, M., & Alizadeh, M. (2026) · Results in Engineering · doi:10.1016/j.rineng.2026.109914 · Cited by 2
Tejavath, S., Shah, V. A., & Shukla, A. (2026) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2026.117110 · Cited by 1
Optimal V2G Method Considering Uncertainty of Distributed Generation and Load
Fu, X., & Xu, Y. (2021) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/632/4/042069 · Cited by 1
“One is to directly upgrade the distribution network facilities to reduce the negative impact of EV [4-6].”
BackgroundAbujubbeh, M., & Natarajan, B. (2023) · IEEE Kansas Power and Energy Conference (KPEC) · doi:10.1109/kpec58008.2023.10215417 · Cited by 1
“Alternatively, [10] uses load flow solution within an iterative search method to evaluate the impact of EV integration on the system.”
MethodInternet of things [IoT] for charging of electrical vehicles
Karabulut, B. Y., Alay, F. D., & Adalar, F. Z. (2024) · Elsevier eBooks · doi:10.1016/b978-0-443-13607-8.00015-8 · Cited by 1
Huang, Q., Mei, W., Zhang, L., Qian, L., & Chen, Y. (2024) · Journal of Electrical Engineering and Technology · doi:10.1007/s42835-024-01885-w · Cited by 2
de Oliveira, M. G., & Júnior, J. C. D. M. V. (2023) · Brazilian Conference on Quality of Power (CBQEE) · doi:10.1109/cbqee59548.2023.10503721 · Cited by 1
“…de estações de recarga, considerando aspectos tais como o fluxo de veículos no local candidato [3],[4],[5], o tempo total de recarga e de espera por um carregador [3],[5], o custo de investimento para implantação dos eletropostos [3], [4], [6] e os impactos na rede elétrica [3],[4],[5],[6].”
BackgroundBalmeo, A. A., Aguirre, R. A., Castillo, M. D., Maguindayao, E. J. H., & Manzano, J. P. P. (2023) · The Palawan Scientist · doi:10.69721/tps.j.2023.15.2.05 · Cited by 1
Minh, T. V., Long, D., Pham, H. V., et al. (2024) · Lecture notes in networks and systems · doi:10.1007/978-3-031-76232-1_21 · Cited by 1
Metadata
- Authors
- Zeb, M. Z., Imran, K., Khattak, A., Janjua, A. K., Pal, A., Nadeem, M., Zhang, J., & Khan, S.
- Affiliations
- National University of Sciences and Technology (PK)
- Arizona State University (US)
- Clemson University (US)
- AIT Austrian Institute of Technology GmbH (AT)
- ORCID
- Venue
- IEEE Access
- Published
- 2020
- Volume
- 8
- Pages
- 68124-68134
- ISSN
- 2169-3536 (ISSN-L)
- OpenAlex
- W3015098507
- Cited by
- 263
- References
- 28
- Citations by year
- 2026: 37 · 2025: 47 · 2024: 64 · 2023: 55 · 2022: 34 · 2021: 23 · 2020: 3
- FWCI
- 9.86
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Locations
- IEEE Access (publishedVersion, cc-by)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Funders
- Arizona State University
- Topics
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Vehicles and Infrastructure
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Optimal Power Flow Distribution
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Smart Grid Energy Management
- Keywords
- electric vehicle charging stations, charging station location, active distribution networks, photovoltaic integration, particle swarm optimization, distribution transformer loading, power losses, installation cost minimization, voltage profile, OpenDSS
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
A language model drew the claims from the paper on 2026-10-28, under version 3 of the claim definition (model deepseek-v4.1-flash, prompt extract-v3).
A second model labelled each claim on 2026-10-28 (model jev-1.13-20260917, definition revision gold-guideline-v0.2).
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.