A Simulation-Based Process Model for Managing Complex Design Projects
Abstract
This paper presents a process modeling and analysis technique for managing complex design projects using advanced simulation. The model computes the probability distribution of lead time in a stochastic, resource-constrained project network where iterations take place among sequential, parallel, and overlapped tasks. The model uses the design structure matrix representation to capture the information flows between tasks. We use a simulation-based analysis to account for many realistic aspects of design process behavior which were not possible in previous analytical models. We propose a heuristic for the stochastic, resource-constrained project scheduling problem in an iterative project network. The model can be used for better project planning and control by identifying leverage points for process improvements, and for evaluating alternative planning and execution strategies. An industrial example is provided to illustrate the utility of the model.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
McKay, M. D., Beckman, R. J., & Conover, W. J. (2000) · Technometrics · doi:10.2307/1271432 · Cited by 7,415
McKay, M. D., Beckman, R. J., & Conover, W. J. (1979) · Technometrics · doi:10.2307/1268522 · Cited by 3,757
Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency and Quality
Wheelwright, S. C., & Clark, K. B. (1992) · Cited by 2,675
Product development performance: strategy, organization, and management in the world auto industry
(1991) · Choice Reviews Online · doi:10.5860/choice.29-1591 · Cited by 2,389
The design structure system: A method for managing the design of complex systems
Steward, D. V. (1981) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1981.6448589 · Cited by 1,749
The new new product development game
(1986) · Journal of Product Innovation Management · doi:10.1016/0737-6782(86)90053-6 · Cited by 1,573
Scheduling subject to resource constraints: classification and complexity
Blazewicz, J., Lenstra, J. K., & Kan, A. H. G. R. (1983) · Discrete Applied Mathematics · doi:10.1016/0166-218x(83)90012-4 · Cited by 1,436
Theory of Modeling and Simulation: Integrating Discrete Event and Continuous Complex Dynamic Systems
Zeigler, B. P., Praehofer, H., & Kim, T. G. (2000) · Cited by 1,098
A model-based method for organizing tasks in product development
Eppinger, S. D., Whitney, D. E., Smith, R. P., & Gebala, D. A. (1994) · Research in Engineering Design · doi:10.1007/bf01588087 · Cited by 1,022
Self-citationApplication of a Technique for Research and Development Program Evaluation
Malcolm, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959) · Operations Research · doi:10.1287/opre.7.5.646 · Cited by 930
Developing products in half the time
(1991) · Choice Reviews Online · doi:10.5860/choice.28-5737 · Cited by 916
(2002) · International Series in Operations Research & Management Science · doi:10.1007/b101924 · Cited by 709
Product Design and Development
Mazumder, Q. H. (2018) · Introduction to Engineering · doi:10.1201/9781315368610-12 · Cited by 613
A Model-Based Framework to Overlap Product Development Activities
Krishnan, V., Eppinger, S. D., & Whitney, D. E. (1997) · Management Science · doi:10.1287/mnsc.43.4.437 · Cited by 605
Self-citationCritical-path planning and scheduling
Kelley, J. E., & Walker, M. R. (1959) · Papers presented at the December 1-3, 1959, eastern joint IRE-AIEE-ACM computer conference on - IRE-AIEE-ACM '59 (Eastern) · doi:10.1145/1460299.1460318 · Cited by 569
A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
Davis, E. W., & Patterson, J. H. (1975) · Management Science · doi:10.1287/mnsc.21.8.944 · Cited by 454
Binary Matrices in System Modeling
Warfield, J. N. (1973) · IEEE Transactions on Systems, Man, and Cybernetics · doi:10.1109/tsmc.1973.4309270 · Cited by 441
A Predictive Model of Sequential Iteration in Engineering Design
Smith, R. P., & Eppinger, S. D. (1997) · Management Science · doi:10.1287/mnsc.43.8.1104 · Cited by 412
Self-citationCommunication and Uncertainty in Concurrent Engineering
Loch, C. H., & Terwiesch, C. (1998) · Management Science · doi:10.1287/mnsc.44.8.1032 · Cited by 352
Adler, P. S., Mandelbaum, A., Nguyen, V., & Schwerer, E. (1995) · Management Science · doi:10.1287/mnsc.41.3.458 · Cited by 297
Letter to the Editor—Monte Carlo Methods and the PERT Problem
Slyke, R. M. V. (1963) · Operations Research · doi:10.1287/opre.11.5.839 · Cited by 272
MONTE CARLO METHODS AND THE PERT PROBLEM
Slyke, V., & Richard, M. (1963) · Cited by 240
Terwiesch, C., & Loch, C. H. (1999) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(98)00041-1 · Cited by 238
Adding value in product development by creating information and reducing risk
Browning, T. R., Deyst, J. J., Eppinger, S. D., & Whitney, D. E. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2002.806710 · Cited by 238
Self-citationProduct development process modeling
Smith, R. P., & Morrow, J. A. (1999) · Design Studies · doi:10.1016/s0142-694x(98)00018-0 · Cited by 201
Optimal Timing of Reviews in Concurrent Design for Manufacturability
Ha, A. Y., & Porteus, E. L. (1995) · Management Science · doi:10.1287/mnsc.41.9.1431 · Cited by 193
The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
Elmaghraby, S. E., & Kamburowski, J. (1992) · Management Science · doi:10.1287/mnsc.38.9.1245 · Cited by 157
Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis
Burt, J. M., & Garman, M. B. (1971) · Management Science · doi:10.1287/mnsc.18.3.207 · Cited by 154
On criticality and sensitivity in activity networks
Elmaghraby, S. E. (2000) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00483-x · Cited by 131
Levitt, R. E., Cohen, G. P., Kunz, J., Nass, C., Christiansen, T. R., & Jin, Y. (1994) · L. Erlbaum Associates Inc. eBooks · Cited by 109
GuindonRaymonde (1990) · Human-Computer Interaction · Cited by 108
Criticality in Stochastic Networks
Williams, T. (1992) · Journal of the Operational Research Society · doi:10.1057/jors.1992.50 · Cited by 103
Is concurrent engineering always a sensible proposition?
AitSahlia, F., Johnson, E., & Will, P. M. (1995) · IEEE Transactions on Engineering Management · doi:10.1109/17.387269 · Cited by 89
Cited by
Design Structure Matrix Extensions and Innovations: A Survey and New Opportunities
Browning, T. R. (2016) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2015.2491283 · Cited by 337
Process models in design and development
Wynn, D. C., & Clarkson, P. J. (2018) · Research in Engineering Design · doi:10.1007/s00163-017-0262-7 · Cited by 319
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Metadata
- Authors
- Cho, S.-H., & Eppinger, S. D.
- Venue
- IEEE Transactions on Engineering Management
- Published
- 2005-08
- Volume
- 52
- Issue
- 3
- Pages
- 316-328
- ISSN
- 0018-9391 (ISSN-L)
- OpenAlex
- W2139917491
- Cited by
- 293
- References
- 33
- FWCI
- 24.46
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.