The DOI matches its Crossref record; 9 of the 9 references it cites were found in a registry or an index.
Operational Impacts of Wind Generation on California Power Systems
Abstract
The paper analyzes the impact of integrating wind generation on the regulation and load following requirements of the California Independent System Operator (CAISO). These requirements are simulated and compared for the study cases with and without wind generation impacts included into the study for the years 2006 and 2010. Regulation and load following models were built based on hour-ahead and five-minute ahead load and wind generation forecasts. In 2006, the CAISO system peaked at 50 270 MW. Wind generation (at the installed capacity of 2600 MW) had limited impact on the requirement of load following and regulation in the CAISO Balancing Authority. However, in 2010 (with an expected installed capacity of approximately 6700 MW), this impact will significantly increase. The results provide very useful information for the CAISO to adjust its scheduling and real-time dispatch systems to reliably accommodate future wind generation additions within the CAISO Balancing Authority.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Utility Wind Integration and Operating Impact State of the Art
Smith, J. C., Milligan, M. R., DeMeo, E. A., & Parsons, B. (2007) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2007.901598 · Cited by 466
Power Fluctuations From Large Wind Farms
Sørensen, P. E., Cutululis, N. A., Vigueras‐Rodríguez, A., Jensen, L. E., Hjerrild, J., Donovan, M. H., & Madsen, H. (2007) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2007.901615 · Cited by 284
Impact of wind generation on the operation and development of the UK electricity systems
Štrbac, G., Shakoor, A., Black, M., Pudjianto, D., & Bopp, T. (2006) · Electric Power Systems Research · doi:10.1016/j.epsr.2006.08.014 · Cited by 251
Wind plant integration [wind power plants
DeMeo, E. A., Grant, W., Milligan, M. R., & Schuerger, M. J. (2005) · IEEE Power and Energy Magazine · doi:10.1109/mpae.2005.1524619 · Cited by 174
Wind power meteorology. Part I: climate and turbulence
Petersen, E. L., Mortensen, N. G., Landberg, L., Højstrup, J., & Frank, H. P. (1998) · Wind Energy · doi:10.1002/(sici)1099-1824(199809)1:1<29::aid-we10>3.0.co;2-b · Cited by 169
The future impact of wind on BPA power system ancillary services
Makarov, Y. V., Lu, S., McManus, B., & Pease, J. H. (2008) · IEEE PES Transmission and Distribution Conference and Exhibition · doi:10.1109/tdc.2008.4517101 · Cited by 31
Self-citationComputer-specific metrics for the regulation and load following ancillary services
(ORNL), T. (. S. O. R. N. L., Kirby, B., USDOE Office of Science (US), & Hirst, E. (2000) · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · doi:10.2172/750982 · Cited by 30
Milligan, M., & Kirby, B. J. (2007) · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · Cited by 23
Kennedy, B. W. (2004) · Refocus · doi:10.1016/s1471-0846(04)00075-7 · Cited by 16
Cited by
Electrochemical Energy Storage for Green Grid
Yang, Z., Zhang, J., Kintner-Meyer, M. C. W., Lu, X., Choi, D., Lemmon, J. P., & Liu, J. (2011) · Chemical Reviews · doi:10.1021/cr100290v · Cited by 5,250
Redox flow batteries: a review
Weber, A. Z., Mench, M. M., Meyers, J. P., Ross, P. N., Gostick, J. T., & Liu, Q. (2011) · Journal of Applied Electrochemistry · doi:10.1007/s10800-011-0348-2 · Cited by 2,008
Nickel Hexacyanoferrate Nanoparticle Electrodes For Aqueous Sodium and Potassium Ion Batteries
Wessells, C. D., Peddada, S. V., Huggins, R. A., & Cui, Y. (2011) · Nano Letters · doi:10.1021/nl203193q · Cited by 1,074
Challenges of renewable energy penetration on power system flexibility: A survey
Impram, S., Varbak Nese, S., & Oral, B. (2020) · Energy Strategy Reviews · doi:10.1016/j.esr.2020.100539 · Cited by 939
An Evaluation of the HVAC Load Potential for Providing Load Balancing Service
Lu, N. (2012) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2012.2183649 · Cited by 739
Aggregate flexibility of thermostatically controlled loads
Hao, H., Sanandaji, B. M., Poolla, K., & Vincent, T. L. (2015) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2014.2328865 · Cited by 733
A high-rate and long cycle life aqueous electrolyte battery for grid-scale energy storage
Pasta, M., Wessells, C. D., Huggins, R. A., & Cui, Y. (2012) · Nature Communications · doi:10.1038/ncomms2139 · Cited by 611
State Estimation and Control of Electric Loads to Manage Real-Time Energy Imbalance
Mathieu, J. L., Koch, S., & Callaway, D. S. (2013) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2012.2204074 · Cited by 574
Chance-Constrained Optimal Power Flow: Risk-Aware Network Control under Uncertainty
Bienstock, D., Chertkov, M., & Harnett, S. (2014) · SIAM Review · doi:10.1137/130910312 · Cited by 496
A Review of Power System Flexibility With High Penetration of Renewables
Mohandes, B., Moursi, M. S. E., Hatziargyriou, N., & Khatib, S. E. (2019) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2019.2897727 · Cited by 496
Operating Reserves and Variable Generation
Ela, E., Milligan, M., & Kirby, B. (2011) · doi:10.2172/1023095 · Cited by 435
Wind power forecasting : state-of-the-art 2009.
Monteiro, C., Bessa, R., Miranda, V., Botterud, A., Wang, J., Conzelmann, G., & Porto, I. (2009) · doi:10.2172/968212 · Cited by 378
Distribution System Planning With Incorporating DG Reactive Capability and System Uncertainties
Zou, K., Agalgaonkar, A. P., Muttaqi, K. M., & Perera, S. (2012) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2011.2166281 · Cited by 367
A Geometric Approach to Aggregate Flexibility Modeling of Thermostatically Controlled Loads
Zhao, L., Zhang, W., Hao, H., & Kalsi, K. (2017) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2017.2674699 · Cited by 355
Analyzing operational flexibility of electric power systems
Ulbig, A., & Andersson, G. (2015) · International Journal of Electrical Power & Energy Systems · doi:10.1016/j.ijepes.2015.02.028 · Cited by 354
Yang, D., Wang, W., Gueymard, C. A., Hong, T., Kleissl, J., Huang, J., Perez, M. J., Perez, R., Bright, J. M., Xia, X., et al. (2022) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2022.112348 · Cited by 338
Direct Quantile Regression for Nonparametric Probabilistic Forecasting of Wind Power Generation
Wan, C., Lin, J., Wang, J., Song, Y., & Dong, Z. Y. (2017) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2016.2625101 · Cited by 289
Ancillary Service to the Grid Through Control of Fans in Commercial Building HVAC Systems
Hao, H., Lin, Y., Kowli, A. S., Barooah, P., & Meyn, S. (2014) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2014.2322604 · Cited by 273
Optimal Participation of an Electric Vehicle Aggregator in Day-Ahead Energy and Reserve Markets
Sarker, M. R., Dvorkin, Y., & Ortega-Vazquez, M. A. (2016) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2015.2496551 · Cited by 270
Lu, N., & Zhang, Y. (2013) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2012.2222944 · Cited by 265
Primary Frequency Response in Capacity Expansion with Energy Storage
Carrion, M., Dvorkin, Y., & Pandzic, H. (2018) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2017.2735807 · Cited by 70
“LARGE-SCALE integration of renewable generation, such as photovoltaic and wind power resources, introduces additional uncertainty and variability on power system operation [1], thus imposing more stringent flexibility requirements [2]– [4].”
BackgroundEvangelopoulos, V. A., Avramidis, I. I., & Georgilakis, P. S. (2020) · IEEE Access · doi:10.1109/access.2020.2975663 · Cited by 65
“Their probabilities are normalized to neglect the probabilities of the rejected scenarios in S-DAS, following the theory of the truncated normal distribution applied in [44].”
Spatio-Temporal Flexibility Management in Low-Carbon Power Systems
Huo, Y., Bouffard, F., & Joos, G. (2020) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2020.2967428 · Cited by 49
“Box shaped envelopes were developed in [9] and [10] to quantify flexibility requirements for a range of intra-hourly duration.”
BackgroundLechl, M., Fürmann, T., de Meer, H., & Weidlich, A. (2023) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2023.113570 · Cited by 34
Market and Policy Barriers for Demand Response Providing Ancillary Services in U.S. Markets
Lawrence Berkeley National Lab. (LBNL), B., Cappers, P., USDOE Office of Science (SC), MacDonald, J., & Goldman, C. (2013) · doi:10.2172/1171799 · Cited by 20
Metadata
- Authors
- Makarov, Y. V., Loutan, C., Ma, J., & de Mello, P.
- Venue
- IEEE Transactions on Power Systems
- Published
- 2009-05
- Volume
- 24
- Issue
- 2
- Pages
- 1039-1050
- ISSN
- 0885-8950 (ISSN-L)
- 1558-0679
- OpenAlex
- W2153520025
- Cited by
- 614
- References
- 9
- FWCI
- 31.68
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.