Preliminary study for the management of construction and demolition waste
Open accessThe DOI matches its Crossref record; 12 of the 12 references it cites were found in a registry or an index.
Abstract
This paper refers to the management of the construction and demolition (C&D) waste since, according to the EU Waste Strategy, C&D waste is considered to be one of the priority waste streams and appropriate actions need to be taken with respect to its effective management. Initially, the paper presents the state-of-the-art of the problem of C&D waste, including the amount and composition of C&D waste in EU countries, differences in the characteristics of this waste stream depending on its origin, as well as collection and management practices that are applied. A methodology is described for the estimation of the quantities of the waste stream under examination, since in most cases quantitative primary data is not available. Next, the fundamentals for the development of an integrated scheme for the management of C&D waste are presented and discussed, such as appropriate demolition procedures and location of waste management (off-site waste management, on-site waste management, direct on-site recovery, centralized on-site recovery). Finally, taking into consideration all relevant parameters, alternative systems that could be applied for the management of the C&D waste are suggested.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Therefore, during the demolition stage, the release of nanomaterials into the environment can be uncontrollable, and, hence, why strict standard demolition procedures need to be applied [66].”
From Nanoparticles in Construction Materials and Other Applications, and Implications of Nanoparticle Use (2019) · cites this paper as [66]
Citations
Cites
On-site sorting of construction and demolition waste in Hong Kong
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(01)00052-0 · Cited by 431 · cited 3×
“According to this method, the demolition is evolved from the roof to the ground going down floor by floor (Poon et al. 2001).”
BackgroundMethodInfluentialEnvironmental management of construction and demolition waste in Kuwait
Kartam, N., Al-Mutairi, N., Al-Ghusain, I., & Al-Humoud, J. (2004) · Waste Management · doi:10.1016/j.wasman.2004.06.003 · Cited by 310 · cited 1×
“More importantly, at places where the disposal costs are low, the transport costs are high and the prices of raw and secondary materials are almost the same, the viability of a recycling centre is rendered very difficult (Kartam et al. 2004).”
BackgroundStrategies for successful construction and demolition waste recycling operations
Peng, C.-L., Scorpio, D. E., & Kibert, C. J. (1997) · Construction Management and Economics · doi:10.1080/014461997373105 · Cited by 291
Management of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218 · cited 3×
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundGeneration and management of construction and demolition waste in Greece—an existing challenge
Fatta, D., Papadopoulos, A., Avramikos, E., Sgourou, E., Moustakas, K., Kourmoussis, F., Mentzis, A., & Loizidou, M. (2003) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(03)00035-1 · Cited by 215 · cited 1×
“Next, an indicative mathematical model for the estimation of the generated quantities of C&D waste, which has been developed by the NTUA, is presented (NTUA 2002, Fatta et al. 2003).”
MethodSelf-citationRecycling of construction and demolition waste via a mechanical sorting process
Huang, W.-L., Lin, D.-H., Chang, N.-B., & Lin, K.-S. (2002) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(02)00053-8 · Cited by 179
Minimizing demolition wastes in Hong Kong public housing projects
Poon, C. S., Yu, A. T. W., See, S. C., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213283 · Cited by 74 · cited 3×
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundMaterial Balance of a Construction Waste Sorting Plant
Brunner, P. H., & Stämpfli, D. M. (1993) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x9301100104 · Cited by 50 · cited 1×
“Recycling centres are characterized by the heavy mechanical equipment and the high level of technology that is used at such type of installations (Brunner & Stampfli 1993, Peng et al. 1997, Huang et al. 2002).”
BackgroundMaterial Balance of a Construction Waste Sorting Plant
Brunner, P. H. (1993) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1006/wmre.1993.1005 · Cited by 31
Strategies for innovation in construction demolition waste management in Brazil
John, V. M., Angulo, S. C., Miranda, L. F. R., Agopyan, V., & de Vasconcellos, F. (2004) · Cited by 24
Research works printed but not linked: 13
- Abdullah, A., Deconstruction and Materials Reuse. Proceedings of the 11th Rinker International Conference
- Bringezu, S., 1998, Material flows-construction materials and packaging. Sub-group meeting on statistics on scare and hazardous material of the working group `statistics of the environment'
- Crowther, P., Deconstruction and Materials Reuse: Technology, Economic, and Policy, Proceedings of the CIB Task Group 39 - Deconstruction Meeting, CIB World Building Congress
- Donovan, C.T., 1991, Resource Recycling, 146
- European Community (EC), 2001, Sixth Environment Action Programme of the 2001-2010 (Sixth EAP): Environment 2010: Our future, Our Choice
- European Environmental Agency (EEA), 2002, Review of Selected Waste Streams. Technical Report N.69
- John, V.M., CIB World Building Congress
- Nakajima, S., 2000, The state of deconstruction in Japan
- Ntua, 2002, Report to Eurostat. Collection of Data related to the waste produced by (i) Constructions, demolitions and excavations and (ii) Mining, quarrying activities, grinding and milling for Greece
- Pasxali, K., 2005, Techno economic study report of the national Cypriot project: "Provision of consultant services for the preparation of environmental, land planning, techno economic and feasibility study for the construction of integrated C&D waste management facilities at the municipalities of Leukosia, Larnaka and Ammoxostos"
- Schultmann, F., 2000, The state of deconstruction in Germany
- Seemann, A., Design for Deconstruction and Materials Reuse, Proceedings of the CIB Task Group 39 - Deconstruction Meeting
- Symonds Group Ltd., 1999, Consulting Engineers and Planners and PRC Bouwcentrum
Cited by
Items 101–128 of 128
Waste management in construction industry - a review on the issues and challenges
Ismail, F. Z., Halog, A., & Esa, M. R. (2015) · Cited by 5
Efficient management in the construction industry under the current market
Pokorski, M. (2019) · World Scientific News · Cited by 3
Jiménez-Rivero, A. (2016) · UPM Digital Archive (Technical University of Madrid) · doi:10.20868/upm.thesis.43833 · Cited by 7
Study on the Mechanical Properties and Design Parameters of Floor Slabs Waste Subgrade Filler
Shi, C., Wang, Y., Wu, C., & Song, W. (2022) · Advances in Materials Science and Engineering · doi:10.1155/2022/4913825 · Cited by 2
“According to the analysis of Zhe, the mainmaterials contained CDW are bricks, concrete blocks, and mortar [25, 26]; then the properties of the three materials are analyzed.”
MethodSolid waste management as an urban area regulation in Algeria. Case of El-Khroub city
Lamri, N., Belayadi, A., & Abbas, F. (2022) · Forum geografic · doi:10.5775/fg.2022.039.d · Cited by 2
“It consists mainly of construction waste: excavations and debris; demolition waste with treated wood, free asbestos, tar paints, pyralene (Kourmpanis et al., 2008).”
Utilization of Waste Aggregate for Aggregate Construction for Improvement of Soil Bearing Capacity
Pauzi, N. I. M., Ghiasi, V., Razzi, I., & Radhi, M. S. M. (2024) · MATEC Web of Conferences · doi:10.1051/matecconf/202440002005 · Cited by 3
“A lot of civil engineering source materials are made from processed CDW, including formed bricks and blocks, recycled aggregates for concrete, and substitute materials for pavement engineering [3]; [6].”
BackgroundConstruction and Demolition Waste Management: Bottlenecks, Regulations, and Policy Framework
Karunaratne, S., & Kariapper, A. (2024) · Springer eBooks · doi:10.1007/978-3-031-58441-1_6 · Cited by 3
Akgül, M. (2024) · Heliyon · doi:10.1016/j.heliyon.2024.e36423 · Cited by 5
“Furthermore, according to the EU Waste Strategy, construction demolition waste is considered as one of the priority waste management processes [7].”
BackgroundINVESTIGATION OF MATERIAL SEPARATION OF MIXED CONSTRUCTION AND DEMOLITION WASTE BY SORTING PROCESS
Montero, A., Tojo, Y., Matsuo, T., Matsuto, T., Yamada, M., Asakura, H., & Ono, Y. (2008) · Environmental Engineering Research · doi:10.11532/proes1992.45.271 · Cited by 2
Deconstruction Project Planning Considering Local Environmental Impacts
Kühlen, A., Volk, R., Stengel, J., & Schultmann, F. (2014) · International Conference on Engineering, Project, and Production Management (EPPM) · doi:10.32738/ceppm.201411.0003 · Cited by 2
“Singly on strategic level environmental impacts are occasionally considered in the context of decision making (Kourmpanis et al. 2008a, Kourmpanis et al. 2008b, Chen und Li 2006, Anumba et al. 2003).”
BackgroundRivero-Camacho, C., Solís-Guzmán, J., Alba-Rodríguez, M. D., & Marrero, M. (2020) · Elsevier eBooks · doi:10.1016/b978-0-12-819055-5.00022-x · Cited by 3
Analysis of potential incorporation of waste into asphalt pavements
Gandhi, S., Roji, S. S. S., Motta, M., Nalawade, R. D., Khan, M. A., & Palanisamy, S. (2024) · Materials Today Proceedings · doi:10.1016/j.matpr.2024.05.097 · Cited by 4
Demolition project management pathways: the route towards circular demolition
Osaily, Y., Copping, A. G., & McCann, S. (2022) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1101/6/062002 · Cited by 3
“2 Conventional demolition is described as the process of transforming a building into waste [8,10].”
BackgroundImprovement of Soil Using Construction and Demolition Waste for Pavement Application
Prajapati, A., Shah, A. U., Jain, P. H., & Rangwala, H. M. (2024) · Lecture notes in civil engineering · doi:10.1007/978-981-97-3389-7_42 · Cited by 1
Experimental Study on the Performance of Asphalt Binder Modified by Waste Rock Wool Fiber
Hu, C., Xu, Z., Feng, C., Zhu, R., & Liu, T. (2025) · Journal of Materials in Civil Engineering · doi:10.1061/jmcee7.mteng-19832 · Cited by 1
Zedda, V., Trois, C., & Everitt, P. (2014) · The Journal of Solid Waste Technology and Management · doi:10.5276/jswtm.2014.375 · Cited by 1
TOWS MATRIX OF ENVIRONMENTAL HEALTH MANAGEMENT FOR FLOOD DISASTER IN MALAYSIA
(2019) · International Journal of Public Health and Clinical Sciences · doi:10.32827/ijphcs.6.1.1 · Cited by 1
“The waste may contain valuable materials such as concrete, steel (Kourmpanis et al., 2008), timber, as well as organic materials which are suitable for composting (Environmental Protection Agency [EPA], 2008; Baycan, 2004).”
BackgroundOptimization of construction waste transportation path for urban roads based on ECEA algorithm
Eryue, Z., & Qi, J. (2022) · IEEE International Conference on Power, Intelligent Computing and Systems (ICPICS) · doi:10.1109/icpics55264.2022.9873803 · Cited by 1
Project Risk Management for Sustainable Building Repair & Maintenance in Developing Countries
Thaheem, M. J., Marco, A. D., & Mughal, M. A. H. (2013) · PORTO@Iris
Andalibizadeh, B., & Marsono, A. K. (2013)
Lee, C., Mahendra, S., & Alvarez, P. J. J. (2010)
Análise e comparação de cinco manuais de gerenciamento de resíduos de construção
Grobério, L., & Rembiski, F. D. (2014) · Anais do ... Encontro Nacional de Tecnologia do Ambiente Construído · doi:10.17012/entac2014.420
EFFECTIVE RECYCLE PLANNING FOR CONSTRUCTION AND DEMOLITION WASTES
Ekanem, E. O. (2011) · TUScholarShare (Temple University) · Cited by 3
Gas Waste Management in the GCC
Mahfoodh, H., Naser, S. S. H., & Qader, M. R. (2021) · International Sustainability and Resilience Conference · doi:10.1109/ieeeconf53624.2021.9667992
Life Cycle Assessment and Costing of Concrete Waste: A Case Study
Saeed, M. N., Yas, H., & Tee, K. F. (2024) · Nanotechnology Perceptions · doi:10.62441/nano-ntp.v20is1.38
Upreti, K., Divakaran, P., Patil, S., Dadhich, P., Gautam, A., & Vats, P. (2025) · Communications in computer and information science · doi:10.1007/978-3-031-84062-3_5
Metadata
- Authors
- Kourmpanis, B., Papadopoulos, A., Moustakas, K., Stylianou, M., Haralambous, K. J., & Loizidou, M.
- Affiliations
- National Technical University of Athens (GR)
- Corresponding author
- Kourmpanis, B.
- Venue
- Waste Management & Research: The Journal for a Sustainable Circular Economy
- Publisher
- SAGE Publications
- Published
- 2008-06
- Volume
- 26
- Issue
- 3
- Pages
- 267-275
- ISSN
- 0734-242X (ISSN-L)
- 1096-3669
- OpenAlex
- W2144889409
- Cited by
- 128
- References
- 12
- Citations by year
- 2025: 5 · 2024: 9 · 2023: 7 · 2022: 8 · 2021: 11 · 2020: 7 · 2019: 12 · 2018: 5 · 2017: 10 · 2016: 11 · 2015: 4 · 2014: 7 · 2013: 9 · 2012: 7
- FWCI
- 14.95
- Type
- journal article
- Language
- en
- Open access
- green
- doi.org
- Licence
- other-oa
- journals.sagepub.com/page/policies/text-and-data-mining-license (tdm)
- Locations
- Waste Management & Research The Journal for a Sustainable Circular Economy (publishedVersion)
- PubMed (publishedVersion)
- DSpace - NTUA (National Technical University of Athens) (submittedVersion, other-oa)
- Kypseli (submittedVersion)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Physical Sciences › Engineering › Building and Construction › Recycling and utilization of industrial and municipal waste in materials production
- Keywords
- construction and demolition waste, waste management, on-site waste management, waste composition
- MeSH terms
- Construction Materials, European Union, Explosions, Waste Management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.