Preliminary study for the management of construction and demolition waste
Open accessThe DOI matches its Crossref record; 12 of the 12 references it cites were found in a registry or an index.
Abstract
This paper refers to the management of the construction and demolition (C&D) waste since, according to the EU Waste Strategy, C&D waste is considered to be one of the priority waste streams and appropriate actions need to be taken with respect to its effective management. Initially, the paper presents the state-of-the-art of the problem of C&D waste, including the amount and composition of C&D waste in EU countries, differences in the characteristics of this waste stream depending on its origin, as well as collection and management practices that are applied. A methodology is described for the estimation of the quantities of the waste stream under examination, since in most cases quantitative primary data is not available. Next, the fundamentals for the development of an integrated scheme for the management of C&D waste are presented and discussed, such as appropriate demolition procedures and location of waste management (off-site waste management, on-site waste management, direct on-site recovery, centralized on-site recovery). Finally, taking into consideration all relevant parameters, alternative systems that could be applied for the management of the C&D waste are suggested.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Therefore, during the demolition stage, the release of nanomaterials into the environment can be uncontrollable, and, hence, why strict standard demolition procedures need to be applied [66].”
From Nanoparticles in Construction Materials and Other Applications, and Implications of Nanoparticle Use (2019) · cites this paper as [66]
Citations
Cites
On-site sorting of construction and demolition waste in Hong Kong
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(01)00052-0 · Cited by 431 · cited 3×
“According to this method, the demolition is evolved from the roof to the ground going down floor by floor (Poon et al. 2001).”
BackgroundMethodInfluentialEnvironmental management of construction and demolition waste in Kuwait
Kartam, N., Al-Mutairi, N., Al-Ghusain, I., & Al-Humoud, J. (2004) · Waste Management · doi:10.1016/j.wasman.2004.06.003 · Cited by 310 · cited 1×
“More importantly, at places where the disposal costs are low, the transport costs are high and the prices of raw and secondary materials are almost the same, the viability of a recycling centre is rendered very difficult (Kartam et al. 2004).”
BackgroundStrategies for successful construction and demolition waste recycling operations
Peng, C.-L., Scorpio, D. E., & Kibert, C. J. (1997) · Construction Management and Economics · doi:10.1080/014461997373105 · Cited by 291
Management of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218 · cited 3×
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundGeneration and management of construction and demolition waste in Greece—an existing challenge
Fatta, D., Papadopoulos, A., Avramikos, E., Sgourou, E., Moustakas, K., Kourmoussis, F., Mentzis, A., & Loizidou, M. (2003) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(03)00035-1 · Cited by 215 · cited 1×
“Next, an indicative mathematical model for the estimation of the generated quantities of C&D waste, which has been developed by the NTUA, is presented (NTUA 2002, Fatta et al. 2003).”
MethodSelf-citationRecycling of construction and demolition waste via a mechanical sorting process
Huang, W.-L., Lin, D.-H., Chang, N.-B., & Lin, K.-S. (2002) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(02)00053-8 · Cited by 179
Minimizing demolition wastes in Hong Kong public housing projects
Poon, C. S., Yu, A. T. W., See, S. C., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213283 · Cited by 74 · cited 3×
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundMaterial Balance of a Construction Waste Sorting Plant
Brunner, P. H., & Stämpfli, D. M. (1993) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x9301100104 · Cited by 50 · cited 1×
“Recycling centres are characterized by the heavy mechanical equipment and the high level of technology that is used at such type of installations (Brunner & Stampfli 1993, Peng et al. 1997, Huang et al. 2002).”
BackgroundMaterial Balance of a Construction Waste Sorting Plant
Brunner, P. H. (1993) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1006/wmre.1993.1005 · Cited by 31
Strategies for innovation in construction demolition waste management in Brazil
John, V. M., Angulo, S. C., Miranda, L. F. R., Agopyan, V., & de Vasconcellos, F. (2004) · Cited by 24
Research works printed but not linked: 13
- Abdullah, A., Deconstruction and Materials Reuse. Proceedings of the 11th Rinker International Conference
- Bringezu, S., 1998, Material flows-construction materials and packaging. Sub-group meeting on statistics on scare and hazardous material of the working group `statistics of the environment'
- Crowther, P., Deconstruction and Materials Reuse: Technology, Economic, and Policy, Proceedings of the CIB Task Group 39 - Deconstruction Meeting, CIB World Building Congress
- Donovan, C.T., 1991, Resource Recycling, 146
- European Community (EC), 2001, Sixth Environment Action Programme of the 2001-2010 (Sixth EAP): Environment 2010: Our future, Our Choice
- European Environmental Agency (EEA), 2002, Review of Selected Waste Streams. Technical Report N.69
- John, V.M., CIB World Building Congress
- Nakajima, S., 2000, The state of deconstruction in Japan
- Ntua, 2002, Report to Eurostat. Collection of Data related to the waste produced by (i) Constructions, demolitions and excavations and (ii) Mining, quarrying activities, grinding and milling for Greece
- Pasxali, K., 2005, Techno economic study report of the national Cypriot project: "Provision of consultant services for the preparation of environmental, land planning, techno economic and feasibility study for the construction of integrated C&D waste management facilities at the municipalities of Leukosia, Larnaka and Ammoxostos"
- Schultmann, F., 2000, The state of deconstruction in Germany
- Seemann, A., Design for Deconstruction and Materials Reuse, Proceedings of the CIB Task Group 39 - Deconstruction Meeting
- Symonds Group Ltd., 1999, Consulting Engineers and Planners and PRC Bouwcentrum
Cited by
Lee, J., Mahendra, S., & Alvarez, P. J. J. (2010) · ACS Nano · doi:10.1021/nn100866w · Cited by 750
Zhang, C., Hu, M., Di Maio, F., Sprecher, B., Yang, X., & Tukker, A. (2022) · Science of The Total Environment · doi:10.1016/j.scitotenv.2021.149892 · Cited by 514
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
A Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
Nanoparticles in Construction Materials and Other Applications, and Implications of Nanoparticle Use
Mohajerani, A., Burnett, L., Smith, J. V., Kurmus, H., Milas, J., Arulrajah, A., Horpibulsuk, S., & Abdul Kadir, A. (2019) · Materials · doi:10.3390/ma12193052 · Cited by 348
“Therefore, during the demolition stage, the release of nanomaterials into the environment can be uncontrollable, and, hence, why strict standard demolition procedures need to be applied [66].”
BackgroundOmary, S., Ghorbel, E., & Wardeh, G. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.01.042 · Cited by 262
Zhang, J., Ding, L., Li, F., & Peng, J. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.120223 · Cited by 228
Silicate production and availability for mineral carbonation.
Renforth, P., Washbourne, C.-L., Taylder, J., & Manning, D. A. C. (2011) · Environmental Science & Technology · doi:10.1021/es103241w · Cited by 225
Iacovidou, E., & Purnell, P. (2016) · Science of The Total Environment · doi:10.1016/j.scitotenv.2016.03.098 · Cited by 200
Improving waste management in construction projects: An Australian study
Udawatta, N., Zuo, J., Chiveralls, K., & Zillante, G. (2015) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2015.05.003 · Cited by 199
Duan, H., Wang, J., & Huang, Q. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2014.11.069 · Cited by 163
Reverse logistics in the construction industry
Hosseini, M. R., Rameezdeen, R., Chileshe, N., & Lehmann, S. (2015) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x15584842 · Cited by 151
“This highlights the high initial costs involved in RL, particularly the labour required for sorting and separating the salvaged materials, which is carried out manually (Kourmpanis et al., 2008).”
BackgroundMethodIdentifying factors influencing demolition waste generation in Hong Kong
Chen, X., & Lu, W. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.09.164 · Cited by 165
“…that DWG is influenced by exogenous factors such as demolition technologies (e.g. deconstruction, wrecking ball, or implosion) (Kibert et al., 2000, Kourmpanis et al, 2008; Poon et al, 2004), duration of demolition (Yuan et al., 2011), surroundings (Hendriks and Janssen, 2001), and constructors’…”
BackgroundVäntsi, O., & Kärki, T. (2013) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-013-0170-5 · Cited by 176
“Selective demolition is a method where demolition is essentially carried out as the reverse of the construction process, and recyclable materials are separated from the waste stream [51, 53].”
BackgroundConstruction and Demolition Waste Recycling Plants Revisited: Management Issues
Ulubeyli, S., Kazaz, A., & Arslan, V. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.02.139 · Cited by 140
Lachimpadi, S. K., Pereira, J. J., Taha, M. R., & MOKHTAR, M. B. (2012) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2012.08.011 · Cited by 135
Jiménez-Rivero, A., Sathre, R., & Navarro, J. G. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2016.01.014 · Cited by 146
Rodríguez, G., Medina, C., Alegre, F. J., Asensio, E., & de Rojas, M. I. S. (2014) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2014.11.067 · Cited by 136
Villoria Sáez, P., del Río Merino, M., & Porras-Amores, C. (2012) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x11423955 · Cited by 116
“It is therefore essential to introduce new measures to prevent waste generation at source (Poon, 1997; Huete et al, 1998; Kourmpanis et al, 2008).”
BackgroundSimion, I. M., Fortuna, M. E., Bonoli, A., & Gavrilescu, M. (2013) · Journal of Environmental Engineering and Landscape Management · doi:10.3846/16486897.2013.852558 · Cited by 111
Marrero, M., Manuel, P., Rivero-Camacho, C., Guerrero, A. F., & Solís-Guzmán, J. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2016.10.020 · Cited by 122
Abanda, F. H., Tah, J. H. M., & Cheung, F. K. T. (2012) · Building and Environment · doi:10.1016/j.buildenv.2012.07.014 · Cited by 110
Arenas, C., Galiano, Y. L., Leiva, C., Vilches, L. F., Torralvo, F. A., Villegas, R., & Fernández‐Pereira, C. (2017) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.12.119 · Cited by 106
Determinants and outcomes of environmental practices in Malaysian construction projects
Yusof, N., Awang, H., & Iranmanesh, M. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.04.064 · Cited by 131
“Construction waste is known to have a significant impact on the environment (Kourmpanis et al., 2008; Wang et al., 2015).”
BackgroundCharef, R., Lu, W., & Hall, D. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.132421 · Cited by 99
Construction and demolition waste generation rates for high-rise buildings in Malaysia
Mah, C. M., Fujiwara, T., & Ho, C. S. (2016) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x16666944 · Cited by 98
“Furthermore, the WGR will differ greatly according to variation in the following parameters: Construction method used in the project, type of project, project size, and others (Jaillon et al., 2009; Kourmpanis et al., 2008).”
BackgroundMethodA review on adoption of novel techniques in construction waste management and policy
Umar, U. A., Shafiq, N., Malakahmad, A., Nuruddin, M. F., & Khamidi, M. F. (2016) · Journal of Material Cycles and Waste Management · doi:10.1007/s10163-016-0534-8 · Cited by 115
Direct and indirect impact assessment in off-site construction—A case study in China
Sandanayake, M. S., Luo, W., & Zhang, G. (2019) · Sustainable Cities and Society · doi:10.1016/j.scs.2019.101520 · Cited by 104
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Akinade, O. O., Ajayi, S. O., Alaka, H. A., & Owolabi, H. A. (2015) · International Journal of Sustainable Building Technology and Urban Development · doi:10.1080/2093761x.2015.1116415 · Cited by 86
“Existing waste prediction 621 models estimate the construction waste based on Materials Waste Rates (MWR) [60, 61, 622 62, 78, 79, 40] and waste generation indexes [58, 24, 59].”
BackgroundBest practices for the management of end-of-life gypsum in a circular economy
Jiménez-Rivero, A., & Navarro, J. G. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.05.068 · Cited by 101
POST DISASTER WASTE MANAGEMENT STRATEGIES IN DEVELOPING COUNTRIES: CASE OF SRI LANKA
Karunasena, G., Amaratunga, D., Haigh, R., & Lill, I. (2009) · International Journal of Strategic Property Management · doi:10.3846/1648-715x.2009.13.171-190 · Cited by 80
“Managing these wastes is very much hard since disaster wastes are mixed and diffi cult to separate ( Kobayashi, 1995 ).”
BackgroundInfluentialLuo, W., Sandanayake, M. S., & Zhang, G. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2018.11.244 · Cited by 91
Web-based construction waste estimation system for building construction projects
Li, Y., & Zhang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.002 · Cited by 98
Mercader-Moyano, P., & Agudo, A. R. D. A. (2013) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x13477719 · Cited by 84
“It is essential to introduce new measures to prevent waste generation at source (Kourmpanis et al., 2008; Poon, 1997; VilloriaSáez et al., 2012).”
Backgroundvan den Berg, M., Voordijk, H., & Adriaanse, A. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.120332 · Cited by 87
“That firm adopts any of three demolition methods: conventional demolition, in which the building is converted into waste; complete selective demolition (also called deconstruction), in which construction steps are reversed so as to recover as many materials as possible; or partial selective demolition, which is a comb…”
BackgroundA Case Study of Sustainable Construction Waste Management in Saudi Arabia
Ouda, O. K. M., Peterson, H. P., Rehan, M., Sadef, Y., Alghazo, J. M., & Nizami, A. (2017) · Waste and Biomass Valorization · doi:10.1007/s12649-017-0174-9 · Cited by 67
Spoerri, A., Lang, D. J., Binder, C. R., & Scholz, R. W. (2009) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2009.04.011 · Cited by 66
“Introduction The building and construction industry is responsible for a sigificant portion of waste (Kourmpanis et al., 2008; Wang et al., 004).”
BackgroundNoll, D., Wiedenhofer, D., Miatto, A., & Singh, S. J. (2019) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2019.104405 · Cited by 78
Recycled sand in lime-based mortars
Stefanidou, M., Anastasiou, E. K., & Georgiadis-Filikas, K. (2014) · Waste Management · doi:10.1016/j.wasman.2014.09.005 · Cited by 61
“Their current main application is in landfills (Kourmpanis et al., 2008; Rao et al., 2007) and research towards increasing the possible uses for such materials is still needed.”
BackgroundRecycled blocks with improved sound and fire insulation containing construction and demolition waste
Leiva, C., Solís-Guzmán, J., Marrero, M., & Arenas, C. (2012) · Waste Management · doi:10.1016/j.wasman.2012.06.011 · Cited by 72
MAJOR FACTORS IMPEDING THE IMPLEMENTATION OF WASTE MANAGEMENT IN AUSTRALIAN CONSTRUCTION PROJECTS
Udawatta, N., Zuo, J., Chiveralls, K., Yuan, H., Zillante, G., & Elmualim, A. A. (2018) · Journal of Green Building · doi:10.3992/1943-4618.13.3.101 · Cited by 62
“The system is deemed even more complicated due to various factors such as the presence of different waste management practices, natural and technical restrictions, and conflicting objectives related to evaluation criteria for alternative CWM systems (Kourmpanis et al., 2008).”
BackgroundAn integrated approach for the management of demolition waste in Cyprus
Kourmpanis, B., Papadopoulos, A., Moustakas, K. G., Kourmoussis, F., Stylianou, M. A., & Loizidou, M. (2008) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x08091554 · Cited by 64
“Analytical data and information concerning these parameters are given elsewhere (Kourmpanis et al. 2008).”
BackgroundSelf-citationCha, G.-W., Kim, Y.-C., Moon, H. J., & Hong, W. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.09.025 · Cited by 60
Experimental study of recycling lightweight concrete with aggregates containing expanded glass
Kralj, D. (2009) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2009.03.003 · Cited by 50
Capacity building for post disaster construction and demolition waste management
Karunasena, G., & Amaratunga, D. (2016) · Disaster Prevention and Management An International Journal · doi:10.1108/dpm-09-2014-0172 · Cited by 50
“Further, Kourmpanis et al. (2008) said that it is a priority waste stream that needs effective management due to non-degradable components that lead to environmental degradation and health problems.”
BackgroundZhang, N., Zheng, L., Duan, H., Yin, F., Li, J., & Niu, Y. (2019) · Environmental Science and Pollution Research · doi:10.1007/s11356-019-05841-4 · Cited by 51
Tefa, L., Bianco, I., Blengini, G. A., & Bassani, M. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.131599 · Cited by 54
Papastamoulis, V., London, K. A., Feng, Y., Zhang, P., Crocker, R., & Patias, P. G. (2021) · Recycling · doi:10.3390/recycling6030061 · Cited by 62
Jayasinghe, R. S., Chileshe, N., & Rameezdeen, R. (2019) · Benchmarking An International Journal · doi:10.1108/bij-08-2018-0238 · Cited by 49
Utilization of construction and demolition waste for particleboard production
Azambuja, R. D. R., de Castro, V. G., Trianoski, R., & Iwakiri, S. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.07.019 · Cited by 40
Pilot-based assessment of the economics of recycling construction demolition waste
Srour, I., Chehab, G. R., El‐Fadel, M., & Tamraz, S. (2013) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x13479430 · Cited by 42
“Thus, to ensure steady demand for the recycled materials, the selling price is set competitively lower than the price of primary material (Kartam et al., 2004; Kourmpanis et al. 2008), as expressed in equation (3).”
BackgroundCOMPARATIVE STUDY OF ON-SITE SORTING FOR C&D IN CHINA AND EUROPE
Hao, J., Maria, F. D., Chen, Z., Yu, S., Ma, W., & Sarno, L. D. (2020) · Detritus · doi:10.31025/2611-4135/2020.14029 · Cited by 41
Ding, Z., Cao, X., Wang, Y., Wu, H., Zuo, J., & Zillante, G. (2021) · Waste Management · doi:10.1016/j.wasman.2021.10.036 · Cited by 42
Guo, D., & Huang, L. (2019) · Buildings · doi:10.3390/buildings9100207 · Cited by 40
Liu, C., Hua, C., & Chen, J. (2021) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x211032031 · Cited by 44
“…address CDW (Esa et al., 2017; European-Commission, 2020; Khoshand et al., 2020; Zhang et al., 2020; Zorpas, 2020), and many countries have adopted the circular economy as an important policy goal (Dahlbo et al., 2015; Ghisellini et al., 2016; Kourmpanis et al., 2008; Penteado and Rosado, 2016).”
BackgroundA Critical Review Examining the Characteristics of Modified Concretes with Different Nanomaterials
Moein, M. M., Rahmati, K., Saradar, A., Moon, J., & Karakouzian, M. (2024) · Materials · doi:10.3390/ma17020409 · Cited by 38
Experiencing Supply Chain Optimizations: A Serious Gaming Approach
van den Berg, M., Voordijk, H., Adriaanse, A., & Hartmann, T. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001388 · Cited by 46
Circular economy in Brazilian construction industry: Current scenario, challenges and opportunities
Hentges, T. I., da Motta, E. A. M., Fantin, T. V. D. L., Moraes, D., Fretta, M. A., Pinto, M. F., & Böes, J. S. (2021) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x211045014 · Cited by 45
“Finally, defining the reduction of the impact of the construction industry as a priority, like it was done by the European Union (Kourmpanis et al., 2008), whereas implementing the mandatory application of the principles of CE in all phases of a project can be an inevitable solution for an…”
BackgroundMethodInfluentialDemolition waste recycling in China: New evidence from a demolition project for highway development
Zhang, Y., & Tan, W. (2020) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20904440 · Cited by 29
Information processing for end-of-life coordination: a multiple-case study
van den Berg, M., Voordijk, H., & Adriaanse, A. (2020) · Construction Innovation · doi:10.1108/ci-06-2019-0054 · Cited by 38
Andersen, R., Ravn, A. S., & Ryberg, M. W. (2022) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2022.106430 · Cited by 35
Environmental Toxicity of Nanomaterials
(2018) · CRC Press eBooks · doi:10.1201/9781351252966 · Cited by 35
Review of project planning methods for deconstruction projects of buildings
Hübner, F., Volk, R., Kühlen, A., & Schultmann, F. (2017) · Built Environment Project and Asset Management · doi:10.1108/bepam-11-2016-0075 · Cited by 28
Assessment of Life Cycle Risks of Deconstruction in Urban Regeneration Projects
Koç, K., & Okudan, O. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002161 · Cited by 34
Aidonis, D. (2019) · Sustainability · doi:10.3390/su11051426 · Cited by 33
“The “top-down” method is ideal for the demolition of buildings located in densely populated areas where access to heavy-duty machinery is difficult [12].”
MethodInvestigation of construction wastes generated in the Malaysian residential sector
Umar, U. A., Shafiq, N., & Isa, M. H. (2018) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x18790359 · Cited by 26
Potential Environmental and Human Health Impacts of Nanomaterials Used in the Construction Industry
Lee, J., Mahendra, S., & Alvarez, P. J. J. (2009) · Springer eBooks · doi:10.1007/978-3-642-00980-8_1 · Cited by 37
“The standard demolition procedures [40] recommend that trained specialists should dispose of hazardous materials (e.”
BackgroundSertyeşilışık, B. (2017) · TRANSACTIONS of the VŠB – Technical University of Ostrava Safety Engineering Series · doi:10.1515/tvsbses-2017-0002 · Cited by 30
“In the post disaster phase, waste generated in the post disaster phase endangers human health and can cause environmental degradation (Brown et al. 2011; EPA, 2008; FEMA, 2007; JEU, 2010; Kourmpanis et al. 2008; Karunasena and Amaratunga, 2016).”
BackgroundRisk sharing for PPP project in construction waste recycling industry in China
Liu, J., Hua, Z., Pang, Y., & Wang, X. (2021) · Environmental Science and Pollution Research · doi:10.1007/s11356-021-15816-z · Cited by 25
Innovative systemic approach for promoting sustainable innovation for zero construction waste
Kralj, D. (2011) · Kybernetes · doi:10.1108/03684921111118040 · Cited by 23
A planning optimisation framework for construction and demolition waste management
Xanthopoulos, A., Aidonis, D., Vlachos, D., & Iakovou, E. T. (2012) · International Journal of Industrial and Systems Engineering · doi:10.1504/ijise.2012.045675 · Cited by 27
“Based on this research, Seemann et al. (2002) presented a more detailed framework for the evaluation of the alternative separation techniques.”
MethodJain, M. S., Sudarsan, J. S., & Parija, P. P. (2023) · Environmental Science and Pollution Research · doi:10.1007/s11356-023-26445-z · Cited by 25
Increasing the efficiency and efficacy of demolition through computerised 4D simulation
Kunieda, Y., Codinhoto, R., & Emmitt, S. (2019) · Engineering Construction & Architectural Management · doi:10.1108/ecam-11-2018-0492 · Cited by 25
Ding, L., Zhang, J., Feng, B., & Li, C. (2020) · Advances in Civil Engineering · doi:10.1155/2020/8875402 · Cited by 21
“*e composition of CDW is complicated with many sources; waste concrete and bricks are two main parts occupied for 60% and 20% of the whole wastes [6, 7], and they can be processed into RA after crushing and screening.”
BackgroundJaved, M. H., Ahmad, A., Rehan, M., Farooq, M., Farhan, M., Raza, M. A., & Nizami, A. (2025) · Sustainability · doi:10.3390/su17114882 · Cited by 26
Understanding the perceptions of stakeholders on selective demolition
Ramos, M., Paiva, A., & Martinho, G. (2023) · Journal of Building Engineering · doi:10.1016/j.jobe.2023.108353 · Cited by 24
Morales, J., & Escalante-Garcia, J. I. (2024) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2024.144229 · Cited by 18
Decision-support for selecting demolition waste management strategies
van den Berg, M., Hulsbeek, L., & Voordijk, H. (2023) · Buildings and Cities · doi:10.5334/bc.318 · Cited by 26
Managing Circular Building Projects
van den Berg, M. (2019) · doi:10.3990/1.9789036547703 · Cited by 30
Demolition Waste Management in Spanish Legislation
Marrero, M., Solís-Guzmán, J., Alonso, B. M., Osuna-Rodriguez, M., & Ramirez-de-Arellano, A. (2011) · The Open Construction and Building Technology Journal · doi:10.2174/1874836801105010162 · Cited by 18
“The selection of the location where the management of C&D waste (crushing and separation) could take place (onsite or off-site) is based on the following parameters [22]: • Availability of machines.”
BackgroundReuse of bituminous pavements: A mini-review of research, regulations and modelling
Anthonissen, J., den bergh, W. V., & Braet, J. (2016) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x16678064 · Cited by 15
“The heterogeneous CDW stream should be disaggregated into subcategories with high value recyclables and low value sub-fractions that contain contaminants (Kourmpanis et al., 2008).”
Temas y tendencias sobre residuos de construcción y demolición: un metaanálisis
Aldana, J., & Serpell, A. F. (2012) · Revista de la construcción · doi:10.4067/s0718-915x2012000200002 · Cited by 39
The Impacts of Environmental Practice Characteristics on Its Implementation in Construction Project
Yusof, N., & Iranmanesh, M. (2017) · Procedia Environmental Sciences · doi:10.1016/j.proenv.2017.03.040 · Cited by 13
Białko, M., & Hoła, B. (2021) · Sustainability · doi:10.3390/su13179888 · Cited by 15
“Construction waste can be classified according to the type of material that was used in the production of a construction product [11,13,14,18].”
BackgroundKong, S. Y., Yaacob, N. M., Rao, S. P., & Hashim, N. R. (2012) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x12465459 · Cited by 10
Post-Disaster C&D Waste Management: The Case of COWAM Project in Sri Lanka
Karunasena, G., Rameezdeen, R., & Amarathunga, D. (2013) · Australasian Journal of Construction Economics and Building - Conference Series · doi:10.5130/ajceb-cs.v1i2.3167 · Cited by 9
“According to Kourmpanis et al. (2008), C&D waste is considered to be a priority waste stream and appropriate actions must be taken to make its management effective.”
BackgroundWastes From Industrial and Commercial Activities
Chandrappa, R., & Das, D. B. (2012) · Environmental science and engineering · doi:10.1007/978-3-642-28681-0_9 · Cited by 8
Relationships between Environmental Initiatives and Impact Reductions for Construction Companies
Chang, A. S.-T., Canelas, C., & Chen, Y.-L. (2021) · Sustainability · doi:10.3390/su13148061 · Cited by 9
“recycling of waste have also been regarded as strategic alternatives for reducing waste from construction [35,36].”
BackgroundSustainable Post‐Disaster Waste Management: Construction and Demolition Debris
Karunasena, G. (2011) · Wiley eBooks · doi:10.1002/9781444344943.ch14 · Cited by 11
Zepatou, V., Loizidou, M., Chaloulakou, A., & Spyrellis, N. (2016) · Sustainability · doi:10.3390/su8040311 · Cited by 7
Self-citationGutiérrez, P. F., Cely‐García, M. F., & Larrahondo, J. M. (2023) · Integrated Environmental Assessment and Management · doi:10.1002/ieam.4736 · Cited by 10
Sustainable use of construction and demolition wastes in a circular economy perspective
Koda, E., & Podlasek, A. (2023) · Elsevier eBooks · doi:10.1016/b978-0-323-95278-1.00027-9 · Cited by 9
Quantification of Waste in Conventional Construction
Iskandar, K. S. (2013) · Cited by 10
Harsunen, P., Uotila, U., Joensuu, T., & Saari, A. (2025) · Environmental Research Infrastructure and Sustainability · doi:10.1088/2634-4505/adcd27 · Cited by 10
“Demolition is a process in which a building is converted into waste (Kourmpanis et al 2008), whereas deconstruction, also called selective demolition, refers to systematic detachment of building components from a building or structure (Tatiya et al 2018).”
Sources of recycled aggregates for concrete production
Ige, O. A. (2023) · Elsevier eBooks · doi:10.1016/b978-0-323-89838-6.00002-5 · Cited by 7
Muñoz-Sanguinetti, C., Rivero-Camacho, C., Marrero, M., & Bálic, G. C. (2019) · Ambiente Construído · doi:10.1590/s1678-86212019000300338 · Cited by 18
A Pre-Demolition Planning Framework to Balance Recyclability and Productivity
Jalloul, H., Pinto, A. D., & Choi, J. (2022) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784483978.091 · Cited by 5
Eliote, G. M., Rausch, C., & Leite, F. L. (2025) · Automation in Construction · doi:10.1016/j.autcon.2025.106438 · Cited by 4
Effective Solid Waste Management Strategies for Rural Communities
kohli, R., Singh, S., Baghel, D. S., Sharma, S., Awasthi, A., Singh, K. J., Kumar, R., & Buddhadev, S. (2024) · Advances in environmental engineering and green technologies book series · doi:10.4018/979-8-3693-8527-2.ch007 · Cited by 4
Nanoparticles in Construction Industry and Their Toxicity
Santhosh, G., & Nayaka, G. P. (2021) · Springer eBooks · doi:10.1007/978-3-030-76073-1_8 · Cited by 6
Metadata
- Authors
- Kourmpanis, B., Papadopoulos, A., Moustakas, K., Stylianou, M., Haralambous, K. J., & Loizidou, M.
- Affiliations
- National Technical University of Athens (GR)
- Corresponding author
- Kourmpanis, B.
- Venue
- Waste Management & Research: The Journal for a Sustainable Circular Economy
- Publisher
- SAGE Publications
- Published
- 2008-06
- Volume
- 26
- Issue
- 3
- Pages
- 267-275
- ISSN
- 0734-242X (ISSN-L)
- 1096-3669
- OpenAlex
- W2144889409
- Cited by
- 128
- References
- 12
- Citations by year
- 2025: 5 · 2024: 9 · 2023: 7 · 2022: 8 · 2021: 11 · 2020: 7 · 2019: 12 · 2018: 5 · 2017: 10 · 2016: 11 · 2015: 4 · 2014: 7 · 2013: 9 · 2012: 7
- FWCI
- 14.95
- Type
- journal article
- Language
- en
- Open access
- green
- doi.org
- Licence
- other-oa
- journals.sagepub.com/page/policies/text-and-data-mining-license (tdm)
- Locations
- Waste Management & Research The Journal for a Sustainable Circular Economy (publishedVersion)
- PubMed (publishedVersion)
- DSpace - NTUA (National Technical University of Athens) (submittedVersion, other-oa)
- Kypseli (submittedVersion)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Physical Sciences › Engineering › Building and Construction › Recycling and utilization of industrial and municipal waste in materials production
- Keywords
- construction and demolition waste, waste management, on-site waste management, waste composition
- MeSH terms
- Construction Materials, European Union, Explosions, Waste Management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.