Earned Value Project Management Method and Extensions
Abstract
The earned value project management method integrates three critical elements of project management: scope management, cost management, and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances, along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. This paper shows the major aspects of the earned value method and presents graphical tools for assessing project performance trends. It provides logical extensions and useful simplifications to enhance the effective application of this important method in project management.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
(2018) · Project Management Journal · doi:10.1002/(issn)1938-9507 · Cited by 834
Earned value in project management
(2003) · Work Study · doi:10.1108/ws.2003.07952gaf.006 · Cited by 418
Lock, D. (1987) · Cited by 258
Cited by
Sustainable project management through project control in infrastructure projects
Kivilä, J., Martinsuo, M., & Vuorinen, L. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.02.009 · Cited by 301
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.02.009 · Cited by 292
Self-citationA new approach for project control under uncertainty. Going back to the basics
Acebes, F., Pajares, J., Galán, J. M., & López-Paredes, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.003 · Cited by 165
Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques
Acebes, F., Pereda, M., Poza, D., Pajares, J., & Galán, J. M. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.06.012 · Cited by 120
Ong, H. Y., Wang, C., & Zainon, N. (2016) · Engineering Management Journal · doi:10.1080/10429247.2015.1135033 · Cited by 22
Metadata
- Authors
- Anbari, F. T.
- Venue
- Project Management Journal
- Publisher
- SAGE Publications
- Published
- 2003-12
- Volume
- 34
- Issue
- 4
- Pages
- 12-23
- ISSN
- 1938-9507 (ISSN-L)
- 8756-9728
- OpenAlex
- W2811166468
- Cited by
- 392
- References
- 6
- FWCI
- 5.79
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Earned Value Project Management Method and Extensions. https://app.cochat.ai/papers/10.1177/875697280303400403
- The paper
- Anbari, F. T. (2003). Earned Value Project Management Method and Extensions. Project Management Journal. https://doi.org/10.1177/875697280303400403
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.