Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 701

The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.

Antecedents and Consequences of Project Team Cross-Functional Cooperation

Pinto, Mary Beth, Pinto, Jeffrey K., Prescott, John E.·1993·Management Science

Abstract

Cross-functional teams can greatly facilitate the successful implementation of projects. This study examined the influence of a set four antecedent constructs (superordinate goals, accessibility, physical proximity and formalized rules and procedures) on the attainment of both cross-functional cooperation and perceived project outcomes. Through the use of path analysis, the results indicated that superordinate goals, physical proximity and project team rules and procedures have significant direct and/or indirect effects on project outcomes through influencing cross-functional cooperation. Further, cross-functional cooperation was a significant predictor of both perceived task and psychosocial project outcomes. Directions for management practice and future research are discussed.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1287/mnsc.39.10.1281

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 1 references

Cited by

See all 701

Metadata

Authors
Pinto, M. B., Pinto, J. K., & Prescott, J. E.
Venue
Management Science
Published
1993-10
Volume
39
Issue
10
Pages
1281-1297
ISSN
  • 0025-1909 (ISSN-L)
  • 1526-5501
OpenAlex
W2018162694
Cited by
701
References
1
FWCI
5.83
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Antecedents and Consequences of Project Team Cross-Functional Cooperation. https://app.cochat.ai/papers/10.1287/mnsc.39.10.1281
The paper
Pinto, M. B., Pinto, J. K., & Prescott, J. E. (1993). Antecedents and Consequences of Project Team Cross-Functional Cooperation. Management Science. https://doi.org/10.1287/mnsc.39.10.1281

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.