RISK MANAGEMENT IN CONSTRUCTION PROJECTS
Open accessThe DOI matches its Crossref record; 20 of the 20 references it cites were found in a registry or an index.
Abstract
Risk management is an important field of construction industry and has gained more importance internationally due to the latest researches carried out on a large scale. However, this relatively new field requires more attention to bring some benefit. Construction projects are facing a number of risks which have negative effects on project objects such as time, cost and quality. This study is based on findings of a questionnaire-based survey on risk management in construction projects in Pakistan, reporting the significance of different type of risk, ultimate responsibility for them and the effectiveness of some most common risk management techniques practiced in the industry. Two types of risk management techniques were considered: preventive techniques which can be used before the start of a project to manage risks that are anticipated during the project execution; and remedial techniques that are used during the execution phase once a risk has already occurred. The study revealed that financial issues for projects, accidents on site and defective design are the most significant risks affecting most of construction projects. As further reported, the contractor is responsible for management of most risks occurring at sites during the implementation phase, such as issues related to subcontractors, labour, machinery, availability of materials and quality, while the client is responsible for the risks such as financial issues, issues related to design documents, changes in codes and regulations, and scope of work. Further reported results of the analysis demonstrate that the production of proper schedule by getting updated data of the project and guidance from previous similar projects are the most effective preventive risk management techniques while close supervision and coordination within projects are the most effective remedial risk management techniques. It may be concluded that the most significant risks must be managed with greater effort to reduce/eliminate their effects on the project. As the study concludes, preparation of a proper schedule and good coordination during the implementation stage are very important as they may help project managers to focus on critical areas for better management of projects in Pakistan.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705 · cited 1×
“In Saudi Arabia, Assaf and Al-Hejji (2006) found that only 30% of construction projects were completed within scheduled completion dates with the average time overrun between 10% and 30%.”
BackgroundRisk assessment of construction projects
Zavadskas, E. K., Turskis, Z., & Tamošaitienė, J. (2010) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2010.03 · Cited by 472
Self-citationRisk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468 · cited 2×
“2010; Kapliński 2008); – risk assessment and evaluation (El-Sayegh 2007; Ke et al.”
BackgroundCauses of delays in Saudi Arabian public sector construction projects
Al‐Kharashi, A., & Skitmore, M. (2009) · Construction Management and Economics · doi:10.1080/01446190802541457 · Cited by 327
Risk management in small construction projects in Singapore: Status, barriers and impact
Hwang, B.-G., Zhao, X., & Toh, L. P. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.01.007 · Cited by 234
Risk Analysis of Critical Infrastructures Using Fuzzy Copras
Yazdani, M., Alidoosti, A., & Zavadskas, E. K. (2011) · Economic Research-Ekonomska Istraživanja · doi:10.1080/1331677x.2011.11517478 · Cited by 169 · cited 1×
“2012); RAMCAP (Risk Analysis and Management for Critical Asset Protection) by introducing new parameters that affect risk value (Yazdani et al. 2011); and Fuzzy Synthetic Model (Abdul-Rahman et al.”
BackgroundCONTRACTOR SELECTION FOR CONSTRUCTION WORKS BY APPLYING SAW‐G AND TOPSIS GREY TECHNIQUES
Zavadskas, E. K., Vilutienė, T., Turskis, Z., & Tamošaitienė, J. (2010) · Journal of Business Economics and Management · doi:10.3846/jbem.2010.03 · Cited by 169
Self-citationLi, H. X., Al-Hussein, M., Lei, Z., & Ajweh, Z. (2013) · Canadian Journal of Civil Engineering · doi:10.1139/cjce-2013-0013 · Cited by 164
Markmann, C., Darkow, I.-L., & von der Gracht, H. (2013) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2012.10.019 · Cited by 158
A HYBRID MCDM MODEL ENCOMPASSING AHP AND COPRAS-G METHODS FOR SELECTING COMPANY SUPPLIER IN IRAN
Zolfani, S. H., Chen, I.-S., Rezaeiniya, N., & Tamošaitienė, J. (2012) · Technological and Economic Development of Economy · doi:10.3846/20294913.2012.709472 · Cited by 121
Self-citation
Cited by
Factors affecting contractors’ risk attitudes in construction projects: Case study from China
Wang, J., & Yuan, H. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.02.006 · Cited by 216
Risk Management Processes and Analysis in Projects Construction Industry
Leslie Appiah, B. (2020) · Journal of Civil, Construction and Environmental Engineering · doi:10.11648/j.jccee.20200504.14 · Cited by 5
Metadata
- Authors
- IQBAL, S., CHOUDHRY, R. M., HOLSCHEMACHER, K., ALI, A., & TAMOŠAITIENĖ, J.
- Venue
- Technological and Economic Development of Economy
- Published
- 2015-01-29
- Volume
- 21
- Issue
- 1
- Pages
- 65-78
- ISSN
- 1392-8619 (ISSN-L)
- 2029-4913
- 2029-4921
- OpenAlex
- W2114538063
- Cited by
- 236
- References
- 20
- FWCI
- 15.80
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: RISK MANAGEMENT IN CONSTRUCTION PROJECTS. https://app.cochat.ai/papers/10.3846/20294913.2014.994582
- The paper
- IQBAL, S., CHOUDHRY, R. M., HOLSCHEMACHER, K., ALI, A., & TAMOŠAITIENĖ, J. (2015). RISK MANAGEMENT IN CONSTRUCTION PROJECTS. Technological and Economic Development of Economy. https://doi.org/10.3846/20294913.2014.994582
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.