Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
The DOI matches its Crossref record; 98 of the 98 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The journal coverage of Web of Science and Scopus: A comparative analysis
Mongeon, P., & Paul-Hus, A. (2016) · Scientometrics · doi:10.1007/s11192-015-1765-5 · Cited by 5,274
Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses
Falagas, M. E., Pitsouni, E. I., Malietzis, G. A., & Pappas, G. (2008) · The FASEB Journal · doi:10.1096/fj.07-9492lsf · Cited by 5,039 · cited 1×
“It has been proven that Scopus combines the advantages of both PubMed and Web of Science, which can provide 20% more publication coverage [24].”
MethodA Review of the Roles of Digital Twin in CPS-based Production Systems
Negri, E., Fumagalli, L., & Macchi, M. (2017) · Procedia Manufacturing · doi:10.1016/j.promfg.2017.07.198 · Cited by 1,669
Life cycle energy analysis of buildings: An overview
Ramesh, T., Prakash, R., & Shukla, K. K. (2010) · Energy and Buildings · doi:10.1016/j.enbuild.2010.05.007 · Cited by 1,408 · cited 1×
“Notably, embodied phase and operational phase will take around 10–20% and 80–90% of energy demand in the entire project cycle, which require more focus for better energy control [75].”
BackgroundPan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336 · cited 2×
“As a result, the adoption of various AI technologies is expected to bring sustainable benefits in terms of automation, risk mitigation, improved efficiency and safety to the construction industry [15].”
BackgroundSelf-citationA smart local moving algorithm for large-scale modularity-based community detection
Waltman, L., & van Eck, N. J. (2013) · The European Physical Journal B · doi:10.1140/epjb/e2013-40829-0 · Cited by 1,088 · cited 1×
“The VOSviwer tool supports a network clustering method named the smart local moving algorithm to provide insights into the structure of the established network, which has shown the advantages of automatically discovering meaningful clusters with higher modularity values [26].”
MethodUnderstanding and facilitating BIM adoption in the AEC industry
Gu, N., & London, K. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.09.002 · Cited by 912
Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018) · Wiley eBooks · doi:10.1002/9781119287568 · Cited by 884
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853
BIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Darko, A., Chan, A. P. C., Adabre, M. A., Edwards, D. J., Hosseini, M. R., & Ameyaw, E. E. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103081 · Cited by 603
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Developing a Digital Twin at Building and City Levels: Case Study of West Cambridge Campus
Lu, Q., Parlikad, A. K., Woodall, P., Don Ranasinghe, G., Xie, X., Liang, Z., Konstantinou, E., Heaton, J., & Schooling, J. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000763 · Cited by 531
Cheng, J. C. P., Chen, W., Chen, K., & Wang, Q. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103087 · Cited by 520
A BIM-data mining integrated digital twin framework for advanced project management
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103564 · Cited by 518
Self-citationDigital twin and its implementations in the civil engineering sector
Jiang, F., Ma, L., Broyd, T., & Chen, K. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103838 · Cited by 500
Miettinen, R., & Paavola, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.009 · Cited by 480
From BIM to extended reality in AEC industry
Alizadehsalehi, S., Hadavi, A., & Huang, J. C. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103254 · Cited by 469
City Digital Twin Potentials: A Review and Research Agenda
Shahat, E., Hyun, C. T., & Yeom, C. (2021) · Sustainability · doi:10.3390/su13063386 · Cited by 460
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Fan, C., Zhang, C., Yahja, A., & Mostafavi, A. (2021) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2019.102049 · Cited by 434
Building information modelling for off-site construction: Review and future directions
Yin, X., Liu, H., Chen, Y., & Al-Hussein, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.010 · Cited by 420
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409 · cited 1×
“…vision falls into an interdisciplinary scientific field to gain a detailed understanding of visual data by computers, the ongoing research about BIM and 3D reconstruction can be treated as a subfield of computer vision to drive the Scan-to-BIM process to be more automatic and accurate [56].”
BackgroundIntegration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
Wang, H., Pan, Y., & Luo, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.005 · Cited by 384
Self-citationBIM-enabled facilities operation and maintenance: A review
Gao, X., & Pishdad-Bozorgi, P. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.01.005 · Cited by 379
Park, C.-S., Lee, D.-Y., Kwon, O.-S., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.010 · Cited by 367
Analyzing the potential of Virtual Reality for engineering design review
Wolfartsberger, J. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.018 · Cited by 345
The Future of Human-in-the-Loop Cyber-Physical Systems
Schirner, G., Erdogmus, D., Chowdhury, K., & Padir, T. (2013) · Computer · doi:10.1109/mc.2013.31 · Cited by 327
Francisco, A., Mohammadi, N., & Taylor, J. E. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000741 · Cited by 325
Du, J., Zou, Z., Shi, Y., & Zhao, D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.009 · Cited by 324
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.011 · Cited by 307
A Review of Deep Learning-Based Semantic Segmentation for Point Cloud
Zhang, J., Zhao, X., Chen, Z., & Lu, Z. (2019) · IEEE Access · doi:10.1109/access.2019.2958671 · Cited by 306
Digital twinning of existing reinforced concrete bridges from labelled point clusters
Lu, R., & Brilakis, I. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102837 · Cited by 258
Integrating semantic NLP and logic reasoning into a unified system for fully-automated code checking
Zhang, J., & El-Gohary, N. M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.08.027 · Cited by 255
BIM-based immersive Virtual Reality for construction workspace planning: A safety-oriented approach
Getuli, V., Capone, P., Bruttini, A., & Isaac, S. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103160 · Cited by 253
Smart Cities with Digital Twin Systems for Disaster Management
Ford, D. N., & Wolf, C. M. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000779 · Cited by 246
Hunhevicz, J. J., & Hall, D. M. (2020) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101094 · Cited by 241
Development of BIM, IoT and AR/VR technologies for fire safety and upskilling
Chen, H., Hou, L., Zhang, G. (., & Moon, S. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103631 · Cited by 235
Ma, J. W., Czerniawski, T., & Leite, F. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103144 · Cited by 227
A BIM-based automated site layout planning framework for congested construction sites
Kumar, S. S., & Cheng, J. C. P. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.008 · Cited by 224
Bortolini, R., Formoso, C. T., & Viana, D. D. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.11.031 · Cited by 211
A survey of automation-enabled human-in-the-loop systems for infrastructure visual inspection
Agnisarman, S., Lopes, S., Chalil Madathil, K., Piratla, K., & Gramopadhye, A. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.10.019 · Cited by 205
Schiavi, B., Havard, V., Beddiar, K., & Baudry, D. (2022) · Automation in Construction · doi:10.1016/j.autcon.2021.104054 · Cited by 205
Hu, Z.-Z., Tian, P.-L., Li, S.-W., & Zhang, J.-P. (2018) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2017.08.007 · Cited by 201
Xue, F., & Lu, W. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103270 · Cited by 183
Ham, Y., & Kim, J. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000748 · Cited by 182 · cited 1×
“In other words, the real-time data collection from IoT devices for monitoring energy consumption, air pollution, traffic flow, and others provides valuable and rich foundations for the creation of a digital twin city [121].”
BackgroundBIM security: A critical review and recommendations using encryption strategy and blockchain
Das, M., Tao, X., & Cheng, J. C. P. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103682 · Cited by 181
Applications of machine learning to BIM: A systematic literature review
Zabin, A., González, V. A., Zou, Y., & Amor, R. (2021) · Advanced Engineering Informatics · doi:10.1016/j.aei.2021.101474 · Cited by 181
Deep Learning Approach to Point Cloud Scene Understanding for Automated Scan to 3D Reconstruction
Chen, J., Kira, Z., & Cho, Y. K. (2019) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000842 · Cited by 177
Liu, Z., Jiang, L., Osmani, M., & Demian, P. (2019) · Electronics · doi:10.3390/electronics8070724 · Cited by 176
Nawari, N., & Ravindran, S. (2019) · Buildings · doi:10.3390/buildings9060149 · Cited by 169
Multiobjective optimization of building energy consumption based on BIM-DB and LSSVM-NSGA-II
Chen, B., Liu, Q., Chen, H., Wang, L., Deng, T., Zhang, L., & Wu, X. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.126153 · Cited by 168
Self-citationBoton, C. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.08.020 · Cited by 167
State-of-the-Art Review of Machine Learning Applications in Constitutive Modeling of Soils
Zhang, P., Yin, Z.-Y., & Jin, Y.-F. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09524-z · Cited by 167
Parametric as-built model generation of complex shapes from point clouds
Barazzetti, L. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.03.005 · Cited by 165
Multi-objective optimization for improved project management: Current status and future directions
Guo, K., & Zhang, L. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104256 · Cited by 164
Self-citationTushar, Q., Bhuiyan, M. A., Zhang, G., & Maqsood, T. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125622 · Cited by 152 · cited 2×
“Hammad [80] trained a deep neural network [81, 82, –84] to precisely predict the expected energy consumption of a given building in BIM during the operation phase, which could provide evidence to make operational measures.”
BackgroundMethodbcBIM: A Blockchain‐Based Big Data Model for BIM Modification Audit and Provenance in Mobile Cloud
Zheng, R., Jiang, J., Hao, X., Ren, W., Xiong, F., & Ren, Y. (2019) · Mathematical Problems in Engineering · doi:10.1155/2019/5349538 · Cited by 152
A Digital Twin of Bridges for Structural Health Monitoring
YE, C., BUTLER, L., CALKA, B., IANGURAZOV, M., LU, Q., GREGORY, A., GIROLAMI, M., & MIDDLETON, C. (2019) · Structural Health Monitoring 2019 · doi:10.12783/shm2019/32287 · Cited by 152
Component-based machine learning for performance prediction in building design
Geyer, P., & Singaravel, S. (2018) · Applied Energy · doi:10.1016/j.apenergy.2018.07.011 · Cited by 148
Coupled simulation of thermally active building systems to support a digital twin
Lydon, G. P., Caranovic, S., Hischier, I., & Schlueter, A. (2019) · Energy and Buildings · doi:10.1016/j.enbuild.2019.07.015 · Cited by 144
A hybrid data mining approach on BIM-based building operation and maintenance
Yang, P., Lin, J., Zhang, J., & Hu, Z. (2017) · Building and Environment · doi:10.1016/j.buildenv.2017.09.030 · Cited by 139
Rule-based compliance checking and generative design for building interiors using BIM
Sydora, C., & Stroulia, E. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103368 · Cited by 131
A multi-user collaborative BIM-AR system to support design and construction
Garbett, J., Hartley, T. P., & Heesom, D. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103487 · Cited by 130
The progress and trend of BIM research: A bibliometrics-based visualization analysis
Wen, Q., Ren, Z.-J., Lu, H., & Wu, J.-F. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103558 · Cited by 130
Recent Tools and Techniques of BIM-Based Virtual Reality: A Systematic Review
Sidani, A., Dinis, F. M., Sanhudo, L., Duarte, J., Baptista, J. S., Martins, J. P., & Soeiro, A. A. V. (2019) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-019-09386-0 · Cited by 127
Integrating BIM with building performance analysis in project life-cycle
Jin, R., Zhong, B., Ma, L., Hashemi, A., & Ding, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102861 · Cited by 126
Measuring the potential of augmented reality in civil engineering
Meža, S., Turk, Ž., & Dolenc, M. (2015) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2015.06.005 · Cited by 119
Automated 3D volumetric reconstruction of multiple-room building interiors for as-built BIM
Jung, J., Stachniss, C., Ju, S., & Heo, J. (2018) · Advanced Engineering Informatics · doi:10.1016/j.aei.2018.10.007 · Cited by 116
Multi-objective optimization for limiting tunnel-induced damages considering uncertainties
Zhang, L., & Lin, P. (2021) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2021.107945 · Cited by 109
Self-citationTowards cloud Augmented Reality for construction application by BIM and SNS integration
Jiao, Y., Zhang, S., Li, Y., Wang, Y., & Yang, B. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.09.018 · Cited by 107
BIM-based automated design and planning for boarding of light-frame residential buildings
Liu, H., Singh, G., Lu, M., Bouferguène, A., & Al‐Hussein, M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.001 · Cited by 101
Jung, N., & Lee, G. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.04.007 · Cited by 92
Bloch, T., & Sacks, R. (2020) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000922 · Cited by 83
Continuous-time Bayesian calibration of energy models using BIM and energy data
Chong, A., Xu, W., Chao, S., & Ngo, N.-T. (2019) · Energy and Buildings · doi:10.1016/j.enbuild.2019.04.017 · Cited by 79
Knowledge Extraction and Discovery Based on BIM: A Critical Review and Future Directions
Hu, Z., Leng, S., Lin, J., Li, S.-W., & Xiao, Y.-Q. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-021-09576-9 · Cited by 76
BIM log mining: Discovering social networks
Zhang, L., & Ashuri, B. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.009 · Cited by 74
Self-citationXue, F., Lu, W., Chen, K., & Webster, C. J. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.100965 · Cited by 71
Mitigating tunnel-induced damages using deep neural networks
Pan, Y., & Zhang, L. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104219 · Cited by 70
Self-citationBIM Log Mining: Measuring Design Productivity
Zhang, L., Wen, M., & Ashuri, B. (2017) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000721 · Cited by 63
Self-citationBIM log mining: Learning and predicting design commands
Pan, Y., & Zhang, L. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103107 · Cited by 63
Self-citationAbdirad, H., & Mathur, P. (2021) · Advanced Engineering Informatics · doi:10.1016/j.aei.2021.101414 · Cited by 63
Augmented Reality for Identifying Maintainability Concerns during Design
Khalek, I. A., Chalhoub, J., & Ayer, S. K. (2019) · Advances in Civil Engineering · doi:10.1155/2019/8547928 · Cited by 53
Mining implicit 3D modeling patterns from unstructured temporal BIM log text data
Yarmohammadi, S., Pourabolghasem, R., & Castro‐Lacouture, D. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.012 · Cited by 48
Human-centered automation for resilient nuclear power plant outage control
Zhang, C., Tang, P., Cooke, N. J., Buchanan, V., Yılmaz, A., Germain, S. W. S., Boring, R. L., Akca-Hobbins, S., & Gupta, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.05.001 · Cited by 47
Information fusion for automated post-disaster building damage evaluation using deep neural network
Zhang, L., & Pan, Y. (2021) · Sustainable Cities and Society · doi:10.1016/j.scs.2021.103574 · Cited by 47
Self-citationBIM log mining: Exploring design productivity characteristics
Pan, Y., & Zhang, L. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.102997 · Cited by 46
Self-citationCorDet: Corner-Aware 3D Object Detection Networks for Automated Scan-to-BIM
Xu, Y. S., Shen, X., & Lim, S. (2021) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000962 · Cited by 45
3D as-built modeling from incomplete point clouds using connectivity relations
Kim, H., & Kim, C. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103855 · Cited by 41
Clustering of designers based on building information modeling event logs
Pan, Y., Zhang, L., & Skibniewski, M. J. (2020) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12551 · Cited by 39
Self-citationAmiri, R., Sardroud, J. M., & de Soto, B. G. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.08.030 · Cited by 36
Chen, L., & Whyte, J. K. (2021) · Engineering Construction & Architectural Management · doi:10.1108/ecam-08-2020-0615 · Cited by 34
Pan, Y., Zhang, L., & Li, Z. (2020) · Knowledge-Based Systems · doi:10.1016/j.knosys.2020.106482 · Cited by 33
Self-citationHammad, A. W. A. (2019) · Buildings · doi:10.3390/buildings9050131 · Cited by 30
Human-in-the-Loop Cyber-Physical Systems for Construction Safety
Eskandar, S., Wang, J., & Razavi, S. (2020) · Springer eBooks · doi:10.1007/978-3-030-41560-0_9 · Cited by 19
Cited by
Regona, M., Yigitcanlar, T., Hon, C., & Teo, M. (2024) · Sustainable Cities and Society · doi:10.1016/j.scs.2024.105499 · Cited by 254
Ding, C., Ke, J., Levine, M., Granderson, J., & Zhou, N. (2024) · Nature Communications · doi:10.1038/s41467-024-50088-4 · Cited by 180
“AIhasthepotentialtoreducecosts across various stages of the construction process, mitigate risks, and enhance health and welfare bene fi ts 22 – 24 , 29 –”
Pang, Y., He, T., Liu, S., Zhu, X., & Lee, C. (2024) · Advanced Science · doi:10.1002/advs.202306574 · Cited by 60
A review of drivers and barriers of Digital Twin adoption in building project development processes
Jahangir, M. F., Schultz, C. P. L., & Kamari, A. (2024) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2024.008 · Cited by 34
Kayembe, M. T., & Obadire, A. M. (2025) · Modern Supply Chain Research and Applications · doi:10.1108/mscra-07-2024-0027 · Cited by 2
Metadata
- Authors
- Pan, Y., & Zhang, L.
- Venue
- Archives of Computational Methods in Engineering
- Published
- 2022-11-03
- Volume
- 30
- Issue
- 2
- Pages
- 1081-1110
- ISSN
- 1134-3060 (ISSN-L)
- 1886-1784
- OpenAlex
- W4308000402
- Cited by
- 441
- References
- 98
- FWCI
- 35.03
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.