The DOI matches its Crossref record; 79 of the 79 references it cites were found in a registry or an index.
Construction performance monitoring via still images, time-lapse photos, and video streams: Now, tomorrow, and the future
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Histograms of Oriented Gradients for Human Detection
Dalal, N., & Triggs, B. (2005) · 2005 IEEE Computer Society Conference on Computer Vision and Pattern Recognition (CVPR'05) · doi:10.1109/cvpr.2005.177 · Cited by 33,584
Rapid object detection using a boosted cascade of simple features
Viola, P., & Jones, M. (2005) · Proceedings of the 2001 IEEE Computer Society Conference on Computer Vision and Pattern Recognition. CVPR 2001 · doi:10.1109/cvpr.2001.990517 · Cited by 18,300
Yilmaz, A., Javed, O., & Shah, M. (2006) · ACM Computing Surveys · doi:10.1145/1177352.1177355 · Cited by 4,792
2015 IEEE Conference on Computer Vision and Pattern Recognition (CVPR)
(2015) · doi:10.1109/cvpr31182.2015 · Cited by 3,737
A Survey on Visual Surveillance of Object Motion and Behaviors
Hu, W., Tan, T., Wang, L., & Maybank, S. (2004) · IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) · doi:10.1109/tsmcc.2004.829274 · Cited by 2,132
P-N learning: Bootstrapping binary classifiers by structural constraints
Kalal, Z., Matas, J., & Mikolajczyk, K. (2010) · 2010 IEEE Computer Society Conference on Computer Vision and Pattern Recognition · doi:10.1109/cvpr.2010.5540231 · Cited by 1,023
Mobile 3D mapping for surveying earthwork projects using an Unmanned Aerial Vehicle (UAV) system
Siebert, S., & Teizer, J. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.01.004 · Cited by 859
Teizer, J., Allread, B. S., Fullerton, C. E., & Hinze, J. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.02.009 · Cited by 456
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000205 · Cited by 404
Self-citationA vision-based motion capture and recognition framework for behavior-based safety management
Han, S., & Lee, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.001 · Cited by 347
Automated construction progress measurement using a 4D building information model and 3D data
Kim, C., Son, H., & Kim, C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.11.041 · Cited by 317
Golparvar-Fard, M., Heydarian, A., & Niebles, J. C. (2013) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.09.001 · Cited by 286
Self-citationReal-time construction worker posture analysis for ergonomics training
Ray, S. J., & Teizer, J. (2012) · Advanced Engineering Informatics · doi:10.1016/j.aei.2012.02.011 · Cited by 281
Automated retrieval of 3D CAD model objects in construction range images
Bosche, F., & Haas, C. T. (2008) · Automation in Construction · doi:10.1016/j.autcon.2007.09.001 · Cited by 278
Golparvar‐Fard, M., Pena-Mora, F. A., & Savarese, S. (2009) · Journal of Information Technology in Construction · Cited by 277
Self-citationConstruction worker detection in video frames for initializing vision trackers
Park, M.-W., & Brilakis, I. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.06.001 · Cited by 265
Self-citationDimitrov, A., & Golparvar-Fard, M. (2014) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.11.002 · Cited by 261
Self-citationGolparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., & Lee, S. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2009)23:6(391 · Cited by 259
Self-citationHan, K. K., & Golparvar-Fard, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.007 · Cited by 246
Self-citationTracking the Built Status of MEP Works: Assessing the Value of a Scan-vs-BIM System
Bosché, F., Guillemet, A., Türkan, Y., Haas, C. T., & Haas, R. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000343 · Cited by 244
Memarzadeh, M., Golparvar-Fard, M., & Niebles, J. C. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.002 · Cited by 235
Self-citationAssessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225
Automated vision tracking of project related entities
Brilakis, I., Park, M.-W., & Jog, G. (2011) · Advanced Engineering Informatics · doi:10.1016/j.aei.2011.01.003 · Cited by 216
Self-citationAutomated Object Identification Using Optical Video Cameras on Construction Sites
Chi, S., & Caldas, C. H. (2011) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/j.1467-8667.2010.00690.x · Cited by 214
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000371 · Cited by 210
Self-citationProgressive 3D reconstruction of infrastructure with videogrammetry
Brilakis, I., Fathi, H., & Rashidi, A. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.03.005 · Cited by 208
Toward automated generation of parametric BIMs based on hybrid video and laser scanning data
Brilakis, I., Lourakis, M., Sacks, R., Savarese, S., Christodoulou, S., Teizer, J., & Makhmalbaf, A. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.06.006 · Cited by 204
Personnel tracking on construction sites using video cameras
Teizer, J., & Vela, P. A. (2009) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.06.011 · Cited by 179
Self-citationAugmented Reality for Construction Site Monitoring and Documentation
Zollmann, S., Hoppe, C., Kluckner, S., Poglitsch, C., Bischof, H., & Reitmayr, G. (2014) · Proceedings of the IEEE · doi:10.1109/jproc.2013.2294314 · Cited by 172
A framework for using mobile computing for information management on construction sites
Chen, Y., & Kamara, J. M. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.01.002 · Cited by 168
Gong, J., Caldas, C. H., & Gordon, C. (2011) · Advanced Engineering Informatics · doi:10.1016/j.aei.2011.06.002 · Cited by 167
Tracking multiple workers on construction sites using video cameras
Yang, J., Arif, O., Vela, P. A., Teizer, J., & Shi, Z. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.06.008 · Cited by 166
Self-citationGong, J., & Caldas, C. H. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.05.005 · Cited by 165
Bosché, F., Haas, C. T., & Akinci, B. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2009)23:6(311 · Cited by 160
Azar, E. R., & McCabe, B. Y. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.03.003 · Cited by 159
Using Hue, Saturation, and Value Color Space for Hydraulic Excavator Idle Time Analysis
Zou, J., & Kim, H. (2007) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2007)21:4(238 · Cited by 155
Bae, H., Golparvar‐Fard, M., & White, J. (2013) · Visualization in Engineering · doi:10.1186/2213-7459-1-3 · Cited by 154
Self-citationAutomated construction activity monitoring system
Rebolj, D., Babić, N. Č., Magdič, A., Podbreznik, P., & Pšunder, M. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.06.002 · Cited by 152
Comparative study of vision tracking methods for tracking of construction site resources
Park, M.-W., Makhmalbaf, A., & Brilakis, I. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.03.007 · Cited by 144
Self-citationAutomating progress measurement of construction projects
Zhang, X., Bakis, N., Lukins, T. C., Ibrahim, Y. M., Wu, S., Kagioglou, M., Aouad, G. F., Kaka, A. P., & Trucco, E. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.09.004 · Cited by 142
Vision-Based Tower Crane Tracking for Understanding Construction Activity
Yang, J., Vela, P. A., Teizer, J., & Shi, Z. (2012) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000242 · Cited by 141
Self-citationIbrahim, Y. M., Lukins, T. C., Zhang, X., Trucco, E., & Kaka, A. P. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.07.002 · Cited by 140
Khosrowpour, A., Niebles, J. C., & Golparvar‐Fard, M. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.08.003 · Cited by 140
Self-citationChi, S., & Caldas, C. H. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000438 · Cited by 134
Automated Visual Recognition of Dump Trucks in Construction Videos
Azar, E. R., & McCabe, B. Y. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000179 · Cited by 132
Server-Customer Interaction Tracker: Computer Vision–Based System to Estimate Dirt-Loading Cycles
Azar, E. R., Dickinson, S., & McCabe, B. Y. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000652 · Cited by 131
4D CAD model updating using image processing-based construction progress monitoring
Kim, C., Kim, B.-I., & Kim, H. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.03.005 · Cited by 127
Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras
Bohn, J. S., & Teizer, J. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000164 · Cited by 126
Three-Dimensional Tracking of Construction Resources Using an On-Site Camera System
Park, M.-W., Koch, C., & Brilakis, I. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000168 · Cited by 125
Self-citationSon, H., Kim, C., & Kim, C. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000141 · Cited by 112
PHOTO-NET II: a computer-based monitoring system applied to project management
Abeid, J., Allouche, E. N., Arditi, D., & Hayman, M. (2003) · Automation in Construction · doi:10.1016/s0926-5805(03)00042-6 · Cited by 106
Wang, C., & Cho, Y. K. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.06.003 · Cited by 102
Application of Visualization Techniques for Construction Progress Monitoring
Fard, M. G., & Pena-Mora, F. A. (2007) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/40937(261)27 · Cited by 99
Material-Based Construction Site Image Retrieval
Brilakis, I., Soibelman, L., & Shinagawa, Y. (2005) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2005)19:4(341 · Cited by 81
Peddi, A., Huan, L., Bai, Y., & Kim, S. (2009) · ASCE Construction Research Congress (CRC) · doi:10.1061/41020(339)2 · Cited by 78
Model to Predict the Impact of a Technology on Construction Productivity
Goodrum, P. M., Haas, C. T., Caldas, C. H., Zhai, D., Yeiser, J., & Homm, D. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000328 · Cited by 77
Object Recognition in Construction-Site Images Using 3D CAD-Based Filtering
Wu, Y., Kim, H., Kim, C., & Han, S. H. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2010)24:1(56 · Cited by 77
Comparison of construction photograph and VR image in construction progress
Kim, H., & Kano, N. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.12.005 · Cited by 66
Cho, Y. K., & Gai, M. (2013) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000332 · Cited by 62
Karsch, K., Golparvar‐Fard, M., & Forsyth, D. A. (2014) · ACM Transactions on Graphics · doi:10.1145/2661229.2661256 · Cited by 51
Self-citationTowards Automated Visual Assessment of Progress in Construction Projects
Lukins, T. C., & Trucco, E. (2007) · British Machine Vision Conference (BMVC) · doi:10.5244/c.21.18 · Cited by 47
Bae, H., Golparvar‐Fard, M., & White, J. (2014) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000392 · Cited by 42
Self-citationTracking Secondary and Temporary Concrete Construction Objects Using 3D Imaging Technologies
Türkan, Y., Bosché, F., Haas, C. T., & Haas, R. (2013) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784413029.094 · Cited by 39
Interactive Visual Construction Progress Monitoring with D4AR — 4D Augmented Reality — Models
Golparvar‐Fard, M., Savarese, S., & Pena-Mora, F. A. (2009) · ASCE Construction Research Congress (CRC) · doi:10.1061/41020(339)5 · Cited by 37
Self-citationAutomated Monitoring of Operation-level Construction Progress Using 4D BIM and Daily Site Photologs
Han, K. K., & Golparvar‐Fard, M. (2014) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784413517.106 · Cited by 33
Self-citationMultimodal Image Retrieval from Construction Databases and Model-Based Systems
Brilakis, I., & Soibelman, L. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:7(777 · Cited by 32
Memarzadeh, M., Heydarian, A., Golparvar‐Fard, M., et al. (2012) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784412343.0054 · Cited by 30
Self-citationHeydarian, A., Golparvar‐Fard, M., & Niebles, J. C. (2012) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784412329.090 · Cited by 29
Self-citationGong, J., & Caldas, C. H. (2009) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/41052(346)7 · Cited by 29
Enhancement of Construction Equipment Detection in Video Frames by Combining with Tracking
Park, M.-W., & Brilakis, I. (2012) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784412343.0053 · Cited by 27
Self-citationDrywall State Detection in Image Data for Automatic Indoor Progress Monitoring
Kropp, C., Koch, C., & König, M. (2014) · International Conference on Computing in Civil and Building Engineering (ICCCBE) · doi:10.1061/9780784413616.044 · Cited by 26
Visual representation of construction progress monitoring metrics on time-lapse photographs
Fard, M. G., Sridharan, A., Lee, S. H., & Pena-Mora, F. A. (2007) · Cited by 24
Testing in harsh conditions: Tracking resources on construction sites with machine vision
Jog, G. M., Brilakis, I., & Angelides, D. C. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.11.003 · Cited by 22
Khosrowpour, A., Fedorov, I., Holynski, A., Niebles, J. C., & Golparvar‐Fard, M. (2014) · ASCE Construction Research Congress (CRC) · doi:10.1061/9780784413517.075 · Cited by 20
Self-citationHan, K. K., & Golparvar‐Fard, M. (2014) · International Conference on Computing in Civil and Building Engineering (ICCCBE) · doi:10.1061/9780784413616.046 · Cited by 15
Self-citationAutomated Detection of Concrete Columns from Visual Data
Zhu, Z., & Brilakis, I. (2009) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/41052(346)14 · Cited by 15
Liu, L., Pena-Mora, F. A., Savarese, S., & Fard, M. G. (2010) · Cited by 9
Azar, E. R., & McCabe, B. Y. (2013) · Proceedings of the ... ISARC · doi:10.22260/isarc2013/0084 · Cited by 8
Identification of Construction Cumulative Trauma Disorders: A Machine Vision Approach
Dai, F., & Ning, X. (2013) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784413029.083 · Cited by 3
Cited by
Tang, S., Shelden, D. R., Eastman, C. M., Pishdad-Bozorgi, P., & Gao, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.01.020 · Cited by 853
Digital twin: benefits, use cases, challenges, and opportunities
Attaran, M., & Celik, B. G. (2023) · Decision Analytics Journal · doi:10.1016/j.dajour.2023.100165 · Cited by 704
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“…(APPC) (Navon and Sacks, 2007), Construction 4.0 (Oesterreich and Teuteberg, 2016), and construction applications of technologies for acquisition of as-built geometry, including, for example, photogrammetry and laser scanning (Brilakis et al., 2010; Yang et al., 2015; Han and Golparvar-Fard, 2017).”
BackgroundInfluentialHam, Y., Han, K. K., Lin, J. J., & Golparvar-Fard, M. (2016) · Visualization in Engineering · doi:10.1186/s40327-015-0029-z · Cited by 503
Self-citationFalls from heights: A computer vision-based approach for safety harness detection
Fang, W., Ding, L., Luo, H., & Love, P. E. D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.02.018 · Cited by 450
Metadata
- Authors
- Yang, J., Park, M.-W., Vela, P. A., & Golparvar-Fard, M.
- Venue
- Advanced Engineering Informatics
- Publisher
- Elsevier BV
- Published
- 2015-04
- Volume
- 29
- Issue
- 2
- Pages
- 211-224
- ISSN
- 1474-0346 (ISSN-L)
- OpenAlex
- W2512256428
- Cited by
- 292
- References
- 79
- FWCI
- 27.95
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.