The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
Automated construction progress measurement using a 4D building information model and 3D data
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Wu, Y. (1999) · Technometrics · doi:10.1080/00401706.1999.10485951 · Cited by 27,221
A method for registration of 3-D shapes
Besl, P. J., & McKay, N. D. (1992) · IEEE Transactions on Pattern Analysis and Machine Intelligence · doi:10.1109/34.121791 · Cited by 18,103
Robust registration of 2D and 3D point sets
Fitzgibbon, A. W. (2003) · Image and Vision Computing · doi:10.1016/j.imavis.2003.09.004 · Cited by 925
Credit scoring with a data mining approach based on support vector machines
Huang, C.-L., Chen, M.-C., & Wang, C.-J. (2007) · Expert Systems with Applications · doi:10.1016/j.eswa.2006.07.007 · Cited by 804
Bosché, F. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.08.006 · Cited by 482
Natural terrain classification using three‐dimensional ladar data for ground robot mobility
Lalonde, J., Vandapel, N., Huber, D. F., & Hebert, M. (2006) · Journal of Field Robotics · doi:10.1002/rob.20134 · Cited by 464
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000205 · Cited by 404
Automated progress tracking using 4D schedule and 3D sensing technologies
Turkan, Y., Bosche, F., Haas, C. T., & Haas, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.10.003 · Cited by 374
Widodo, A., Yang, B.-S., & Han, T. (2007) · Expert Systems with Applications · doi:10.1016/j.eswa.2005.11.031 · Cited by 296
Forecasting financial condition of Chinese listed companies based on support vector machine
Ding, Y., Song, X., & Zen, Y. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.06.037 · Cited by 246
Identifying the critical factors affecting schedule performance of public housing projects
Hwang, B., Zhao, X., & Ng, S. Y. (2012) · Habitat International · doi:10.1016/j.habitatint.2012.06.008 · Cited by 197
Automated construction activity monitoring system
Rebolj, D., Babić, N. Č., Magdič, A., Podbreznik, P., & Pšunder, M. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.06.002 · Cited by 152
Son, H., & Kim, C. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.03.003 · Cited by 150
Self-citationOnboard contextual classification of 3-D point clouds with learned high-order Markov Random Fields
Munoz, D., Vandapel, N., & Hebert, M. (2009) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.2009.5152856 · Cited by 141
Real-time object classification in 3D point clouds using point feature histograms
Himmelsbach, M., Luettel, T., & Wuensche, H. (2009) · IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS) · doi:10.1109/iros.2009.5354493 · Cited by 132
Son, H., Kim, C., & Kim, C. (2011) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000141 · Cited by 112
Self-citationPHOTO-NET II: a computer-based monitoring system applied to project management
Abeid, J., Allouche, E. N., Arditi, D., & Hayman, M. (2003) · Automation in Construction · doi:10.1016/s0926-5805(03)00042-6 · Cited by 106
Object Recognition in Construction-Site Images Using 3D CAD-Based Filtering
Wu, Y., Kim, H., Kim, C., & Han, S. H. (2009) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2010)24:1(56 · Cited by 77
Self-citationManaging Software Development Projects for Maximum Productivity
Howes, N. R. (1984) · IEEE Transactions on Software Engineering · doi:10.1109/tse.1984.5010195 · Cited by 27
Describing Composite Urban Workspaces
Posner, I., Schroeter, D., & Newman, P. M. (2007) · Proceedings - IEEE International Conference on Robotics and Automation/Proceedings · doi:10.1109/robot.2007.364244 · Cited by 24
Aziz, A. A. (2008) · Construction Management and Economics · doi:10.1080/01446190801918748 · Cited by 17
Fast Indoor Scene Classification Using 3D Point Clouds
Shi, L., Kodagoda, S., & Ranasinghe, R. (2011) · UTS ePRESS (University of Technology Sydney) · Cited by 14
Terrain classification based on structure for autonomous navigation in complex environments
Nguyen, D.-V., Kuhnert, L., Schlemper, J., & Kuhnert, K. ‐. (2010) · International Conference on Communications and Electronics (ICCE) · doi:10.1109/icce.2010.5670703 · Cited by 9
Cited by
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
Bosché, F., Ahmed, M., Turkan, Y., Haas, C. T., & Haas, R. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.05.014 · Cited by 550
Wang, Q., & Kim, M.-K. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.02.007 · Cited by 461
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Metadata
- Authors
- Kim, C., Son, H., & Kim, C.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2013-05
- Volume
- 31
- Pages
- 75-82
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2027285680
- Cited by
- 317
- References
- 23
- FWCI
- 27.35
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.